National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Nagaland NHIDCL Tender
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/ae/peren-dimpaur- Iii, Iv, V/2022-23
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NHIDC_789429_1Bid Award Id
ViewTender No
NHIDCL/AE/PEREN-DIMPAUR- III, IV, V/2022-23Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Bridge /Structural Engineer (1 No) 1*24
24
-
-
Senior Quality cum Material Expert (1 No)
(1*24+1*8=32)
32
-
-
Senior Pavement Specialist (1 No)
24
-
-
Road Safety Expert (1 No)
8
-
-
Sub-Professional Staff
-
-
-
Survey Engineer (3 No) (3*24+1*8=80)
80
-
-
Quantity Surveyor (3 No) (3*24+1*60=132)
132
-
-
Lab technician (3 No) (3*24+1*60=132)
132
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manger (3 no during construction and 1 in maintenance) (3*24=72+1*60= 132
132
-
-
Accountant cum Cashier (3no during construction and 1 in maintenance (3*24=72+1*60= 132
132
-
-
Steno cum Computer Operator (3no
during construction and 1 in maintenance) ( (3*24=72+1*60= 132)
132
-
-
Office Boy (3no during construction and 1 in maintenance) ( (3*24=72+1*60= 132)
132
-
-
Transportation (Fixed Costs)
-
-
-
Scorpio or equivalent 4x4 vehicles (not more than 3 years old)
240
-
-
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
-
-
-
For round trip to Employer's Head Office
24
-
-
For round trip to Employer's regional office.
48
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
Main office of minimum 200 Sqm area for During Construction period (1 Nos) 1*24
24
-
-
During Maintenance /DLP period (1 No)
1*60=60 ( min 100 sqm area)
60
-
-
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
Office Supplies during construction period for 1 office
1*24=24
24
-
-
Office Supplies during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Drafting Supplies during construction period for 1 office
1*24=24
24
-
-
Drafting Supplies during Maintenance /DLP period for 1 office 1*60=60
60
-
-
Computer Running Costs during construction period for office 1*24=24
24
-
-
Computer Running Costs during Maintenance /DLP period for 1 office 1*60=60
60
-
-
Domestic and International Communication during construction period for 1 office 1*24=24
24
-
-
Domestic and International Communication during Maintenance /DLP period for 1 office 1*60=60
60
-
-
Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
-
-
-
During Construction period for 1 no of office
1*24=24
24
-
-
During Maintenance /DLP period for 1 no of office
1*60=60
60
-
-
Reports and Document Printing ( rate as per copy)
-
-
-
Monthly reports
(Design and Construction)
84 months * 3 Copies) = 252 Copies
252
-
-
Half yearly Reports
42
-
-
Various others reports as provided in the Concession Agreement such as Completion Report
1
-
-
Road Survey Equipment
-
-
-
Surface defects detection and roughness measurement using Network Survey Vehicle
10
-
-
Pavement strength measurement using FWD
3
-
-
Bridge Inspection using Mobile Bridge Inspection Unit
3
-
-
Road signs inspection using Retro Reflectometer
10
-
-
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements