National Highways And Infrastructure Development Corporation Limited Tender

View complete overview of Nagaland NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Services
Consultancy Services
Eprocure
Opening Date22 Sep 2020
Closing Date5 Nov 2020
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge/Structural Engineer (1 No)

18

-

-

... More
Senior Quality Cum Material Expert 2 nos during Construction Period)

36

-

-

... More
Senior Pavement Specialist (1 nos during Construction Period)

18

-

-

... More
Road Safety Expert (1nos during Construction Period)

18

-

-

... More
Sub-Professional Staff

-

-

-

... More
Survey Engineer (2 nos during Construction Period)

36

-

-

... More
Quantity Surveyor (2 nos during Construction Period and 1 no during Maintenance Period)

44

-

-

... More
Lab Technician (2nos during Construction Period)

36

-

-

... More
Support Staff (inclusive of per diem allowance)

-

-

-

... More
Office Manager ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Accountant Cum Cashier ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Steno cum Computer operator ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Office Boy ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run

-

-

-

... More
Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (5 nos during Construction Period and 2 nos during Maintenance Period.)

210

-

-

... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office/HQ. The quoted amount against remuneration should include travel fare for 20 round trip to Employer's Head Office and 20 round trip to Employer's regional office. (including Hotel Charges,travel costs etc. complete)

1

-

-

... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.

-

-

-

... More
Minimum 200 sqm area of Office shall be rented for Construction Period & Defect Liability Period(Maintenace Period) ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Office Supplies ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Drafting Supplies ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Computer Running Costs ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Domestic and International Communication ( 2 Nos during construction and 1 during maintenance)

96

-

-

... More
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc for 2 offices (2 nos during Construction Period and 1 no during Maintenance Period)

78

-

-

... More
Reports and Document Printing

-

-

-

... More
Monthly reports (Design and Construction) rate as per Copy: [Total Number of Copies are 252 = No. of Report (78) x No.of Copies for Report (3)]

234

-

-

... More
Half yearly Reports, rate as per Copy: [Total Number of Copies are 12 = No. of Report (9) x No.of Copies for Report (3)]

9

-

-

... More
Various other reports as provided in the Concession Agreement such as Completion Report

1

-

-

... More
Road Survey Equipment (Rate as per 1 Km)

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle [Total Quantity is 380 = No. of time survey to be conducted (10) x Km (38)]

380

-

-

... More
Pavement strength measurement using FWD [Total Quantity is 228 = No. of time survey to be conducted (6) x Km (38)

228

-

-

... More
Bridge inspection using Mobile Bridge Inspection Unit [Total Quantity is 380 = No. of time survey to be conducted (10) x Km (38)]

380

-

-

... More
Road signs inspection using Retro Reflectometer [Total Quantity is 380 = No. of time survey to be conducted (10) x Km (38)]

380

-

-

... More
Contigencies A fixed amount of Indian Rupees ONE MILLION (Rs 10 Lakh) shall be included in the Financial Proposal

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.