National Highways And Infrastructure Development Corporation Limited Tender

View complete overview of Nagaland NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Works
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date8 Apr 2024
Closing Date23 May 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nhidcl/nagalanddiv/d-k /dpr/2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Geotechnical cum Slope Stabilization Expert (1 no.)

4

-

-

... More
Hydrologist and Hydrological Modeling Expert (1 no.)

4

-

-

... More
Road Safety Expert (1 no.)

4

-

-

... More
Environmental Specialist (1 no.)

4

-

-

... More
GIS and Remote Sensing Expert (1 no.)

4

-

-

... More
Sub-Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)

-

-

-

... More
Assistant Highway cum Pavement Engineer

4

-

-

... More
Assistant Material cum Geotechnical Engineer Geologist

4

-

-

... More
Survey Engineer

4

-

-

... More
Assistant Quantity Surveyor/Documentation Expert

4

-

-

... More
Support Staff

-

-

-

... More
Office Manager

4

-

-

... More
Office Boy

4

-

-

... More
Transportation (Fixed costs)

-

-

-

... More
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. (2 vehicles)

8

-

-

... More
Duty Travel to Site (Fixed Costs)

1

-

-

... More
Office Rent (Fixed Costs)

4

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

4

-

-

... More
Office Furniture and Equipment (Rental)

4

-

-

... More
Reports and Document (Fixed costs)

-

-

-

... More
Monthly Report (3 sets)

12

-

-

... More
Inception Report & QAP

3

-

-

... More
Environment and Social Impact Screening Report

3

-

-

... More
Draft Feasibility Report

3

-

-

... More
Final Feasibility Report

3

-

-

... More
Strip Plan with L.A. Reports

3

-

-

... More
Draft LA and Clearances I Report

3

-

-

... More
Final LA and Clearances I Report

3

-

-

... More
Draft Environmental Assessment report & RAP

3

-

-

... More
Final Environmental Assessment report & RAP

3

-

-

... More
Draft Detailed Design Report & Drawings etc.

3

-

-

... More
Draft EMP

3

-

-

... More
Draft Bidding Documents

3

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.

3

-

-

... More
Final EMP

3

-

-

... More
Final Bidding Documents

3

-

-

... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)

9

-

-

... More
LA & Clearances II Report

3

-

-

... More
Survey and Investigation

-

-

-

... More
Topographical Survey (Fixed Rate) Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer Detailed topographic surveys using mobile/aerial LiDAR or better technology

1

-

-

... More
Investigation (Fixed cost) Road and Bridge Inventory, FWD Test and Pavement Evaluation Roughness Survey Axle Load Survey Material Survey and Investigation Sub-grade Investigation Traffic Survey Socio-economic & Census Survey/Studies Land Acquisition Studies Any other investigations/surveys, Sub-Soil Investigation (Boring)

1

-

-

... More
Network Survey and GPR Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. GPR Survey for detection of under ground utilities

1

-

-

... More
Cost of supply and fixing Boundary Pillars Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )

1

-

-

... More
Cost of supply and fixing Boundary Pillars Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )

1

-

-

... More
Land Acquisition Team including support staff and logistics/ transportation

-

-

-

... More
Ex-Land Revenue Inspector/Officer or equivalent

4

-

-

... More
Ex-Kanoogo/ Girdwar or equivalent

4

-

-

... More
Ex-Patwari or equivalent

4

-

-

... More
Typist

4

-

-

... More
Peon

4

-

-

... More
Computer including necessary peripherals

4

-

-

... More
Printers

4

-

-

... More
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.