Military Engineer Services Tender
View complete overview of Nagaland MES Tender
Costs
EMD
₹ 80,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Repair Maint Of Water Filtration Plant In Rms
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_650279_2Bid Award Id
ViewTender No
8724/C/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
M&L for cleaning/servicing of Micro filters one is of paper type and another is thread type filter suitable for 2000 LPH RO plant and replacement of required internal parts in the interval of 02 months etc complete all as specified and as directed.
6
-
-
S&F in replacement of anti scalent dozing system consisting on one HDPE tank of 100 litre capacity with a positive displacement diaphrame dosing pump having variable dlow rate of (0-6 LPH), suitable for 2000 LPH RO plant, including motor suitable for operation at 240V, single phase , 50 Hz supply complete with necessary piping, valve, strainers & injectiion fitting for automatic dosing including testing and commisioning complete all as specified and as directed.
2
-
-
Supply , fixing, testing and commissioning in replacement of three phase induction motor with pump cap 3 hp, 2.2 KW, 415 V, 50 Hz, suitable for 2000 LPH Ro plant etc complete all as specified and as directed.
1
-
-
Supply and replacement pressure vessel suitable for sand & carbon filter of 2000 LPH Ro plant, cylindrical type, outer shell eposy fitment wound, inner shell polyethylene, max operaing pressure 10 Bar , max operating temperature 49 C etc complete all as specified and as directed.
2
-
-
Supply, fixing and replacement of flow meter to measure and control the flow of feed /product stream,reject stream suitable for RO plant 2000 LPH etc complete all as specified and as directed.
2
-
-
Supply and fixing and replacment of On line panel mounted digital TDS meter/Conductivity meter (range 0-1000 PPM) suitable foe RO plant 2000 LPH etc complete all as specified and as directed.
2
-
-
Supply on Ph booster suitable for 2000 LPH RO plant complete all as specified and as directed.
5
-
-
Supply on RO antiscalent suitable for 2000 LPH RO plant complete all as specified and directed
50
-
-
Supply of alumina ferric Gde-4 confirming to IS 299 : 2012 for purification of water complete all as specified and directed.
Make :- (a) Raipur Rasayan Udyog, 410/A 411B sector C, Urla Industrial area, Raipur (Chattisgarh), (b) Kay Bee Alums (P) Ltd. G-13 to 16, RICO industrial area, Kapasan Chittorgarh (Rajasthan), (c) Sri Lakshmi Madhavi Alums Pvt Ltd. or equivalent as approved by GE.
35
-
-
Supply only high strength dry free flowing and free from lumps solid chlorination medium,minimum chlorine strength 65% available in 40-45kg drums.Chemical name:-Calcium hypochlorite etc complete all as specified and as directed.
100
-
-
Servicing / maintenance including repairs but excluding spares as required for following components of complete Altoc Dosing system installed at water point = 01 including following operations:
(a) Dismantling of Altoc Dosing System complete part by part in MES yard/ workshop, cleaning of all the stationary and rotary parts,repairing to gear box and display the parts at site for inspection of Engr-in-Charge to ascertain the serviceability / unserviceability of plant and to ascertain the quantam of defects and repairs involved.
(b) Transporting the defective parts to authorised dealer for repairs as decided by the Engnr-in-Charge and carrying out the needful repairs including replacement of defective unserviceable parts.
(c) Assembling the Altoc Dosing System after repair/service and carrying out necessary test in presence of Engnr-in-Charge to establish functionability of the repaired plant upto the entire satisfaction of Engnr-in-Charge etc complete all as specified and as directed..
2
-
-
Servicing of Hemisphere fountain including cleaning of fountain nozzles, adjustment of fountain nozzles for a precision effect, cleaning of pump suction wire mesh, testing of water proof luminaries, cleaning of toughened glass and heat resistant polyester/polycarbonate filter, tightening all electrical connections of control panel etc and testing of etc complete all as specified and as directed.
3
-
-
S&F Water Proof light Luminaire for fountains make as per existing site etc complete all as specified and as directed.
15
-
-
Supply of chlorine tablets contained in plastic cylindrical sealed disposible sanitiser refill (dia 2.5 inches ± 0.5 inches height 10 inches ± 0.5 inches)_ for disinfection of drinking water with arrangement for cotrolled release of disinfectant in water, suitable for operation through dosing system ke:- Declibac (Type Stequa 411 AE) eqvt etc complete all as specified and as directed.
Note:- The product media should have heavy metal contaiminants below detectable limits & must pass the acute toxicity test (confirm to non toxicity for mammalian cells ) and safe for human health safety point.
235
-
-
Supply of pool balance to increase chlorine stability of pool water target limits for limits for free availlable chlorine 2pmm to 4 pmm packing 5 kg sealed plastic container etc complete all as specified and as directed. Make:- Declibac model Poo standard C31 /OR equivalent as approved by GE.
14
-
-
Supply of algaecide specifically effective against green, black spot & mustard algae packing 1 kg sealed plstic container etc complete all as specified and as directed. Make:- Declibac model Poo standard B23/OR equivalent as approved by GE.
14
-
-
Supply of fast acting pool clarifier to clear dull, hazy or cloudy water which can occur in newly filled pools , during warm weather, with pool start up or with algae growth packing 10 kg sealed plastic container etc complete all as specified and as directed. Make:- Declibac model Poo standard A91/OR equivalent as approved by GE.
14
-
-
Supply of pool balance module to check water parameters with following ranges pH 6.8-8.4, total Alkanity 0 ppm to 240 ppm , available chlorine 0 ppm -5 ppm, hardness 0 ppm -1000 ppm and stabilizer 0 ppm-250 ppm packing 50 strips in sealed plastic container etc complete all as specified and as directed. Make:- declibac model Poo standard T19 /OR equivalent as approved by GE.
10
-
-
Supply Only Pocket PH Meter (Dual display), Range-0.00 to 14.0 PH, Accuracy +/- 0.1 PH etc complete all as specified and as directed.
2
-
-
Supply Only Portable TDS Meter, Range-0 to 19990 PPM, Accuracy +/- 2% F.S etc complete all as specified and as directed.
2
-
-
Supply Only Digital PH Meter (table top), Display-3.5 Digit LED Range-0 to 14.0 PH, mv: 0 to +/-1999 Accuracy +/- 0.01 PH,mv +/-1mv, slope control- 80 to 120%,Power 220/230V AC, sensor- pH electrode etc complete all as specified and as directed.
1
-
-
Supply only Ortho Tolidine solution in 500ml bottle pack etc complete all as specified and as directed.
10
-
-
Supply and fixing in repair/replacement of injection check valve 3/8" for repairing of chemical system at RO plant etc complete all as specified and as directed.
4
-
-
Supply and fixing in replacement of 3/8" white suction/discharge tubing (Part No MALT002) for repairing of chemical system at RO plant etc complete all as specified and as directed.
10
-
-
Supply and fixing in replacement of connecting nuts 3/8" (Part No MNUTOO) for replacing of chemical system at RO plant etc complete all as specified and as directed.
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements