National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Mizoram NHIDCL Tender
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NHIDC_785075_1Bid Award Id
ViewTender No
NHIDCl/Miz/AE/NH06/ABTP2/23Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Tunnel Design Engineer (1 No)
42
-
-
... More
Bridge/Structural Engineer
48
-
-
... More
Tunnel Safety Expert (1 No)
42
-
-
... More
Senior Geotechnical Expert (1 No)
42
-
-
... More
Senior Geologist (1 No)
42
-
-
... More
Senior Quality cum Material Expert (1 No)
42
-
-
... More
Senior Contract specialist (1 No)
24
-
-
... More
B. SUB PROFESSIONALS
-
-
-
... More
Tunnel ventilation Cum E&M Expert
30
-
-
... More
Assistant Bridge/Structural Engineer (1Nos. during construction and 1 nos during DLP)
42
-
-
... More
Instrumentation & Control Expert (SCADA)
48
-
-
... More
Tunnel Engineer (2Nos. during construction and 1 nos during DLP)
96
-
-
... More
Tunnel Excavation Expert (1Nos. during construction and 1 nos during DLP)
48
-
-
... More
Tunnel Lining (2Nos. during construction and 2 nos during DLP)
72
-
-
... More
Geologist (1Nos. during construction and 1 nos during DLP)
42
-
-
... More
Quantity Surveyor (2 Nos. during construction and 1 nos during DLP)
84
-
-
... More
Assistant Highway Engineer (1 no during Construction and DLP)
156
-
-
... More
Assistant Quality cum material Engineer (1 Nos. During construction and 1 nos during DLP)
48
-
-
... More
Safety Engineer (2Nos. during construction and 1
nos. during DLP)
84
-
-
... More
Environmental Engineer
22
-
-
... More
Survey Engineer (2Nos. during construction and 1
nos. during DLP)
84
-
-
... More
CAD Expert (1Nos. during construction and 1 nos.
during DLP)
48
-
-
... More
Lab Technician (1Nos. during construction and 1
nos. during DLP)
48
-
-
... More
Office Rent ( During construction and DLP)
156
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (1 No)
156
-
-
... More
Accountant Cum Cashier (1 No)
156
-
-
... More
Steno cum Computer operator (1 No)
156
-
-
... More
Office Boy (1 No)
156
-
-
... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
-
-
-
... More
Scorpio or equivalent 4x4 vehicle(not more than 2 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
156
-
-
... More
Bolero or equivalent 4x4 vehicle(not more than 2 years old) (3 nos during Construction Period and 2 nos during Maintenance Period.)
312
-
-
... More
Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professional and Sub-Professional Staff.
The employer may require the Key Personnel to visit the Employer’s HQ office or any other office as per direction. The quoted amount should include travel fare for 80 round trip per key personnel to Employer’s Head Office for two working days (including Air fare, Food, Boarding & Lodging charges, TA/DA, Taxi, etc. Complete).
-
-
-
... More
All Trips
1
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs):Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication including Internet connection
-
-
-
... More
During Construction Period
36
-
-
... More
During Maintenance Period
120
-
-
... More
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as
required for proper functioning of office. Office furniture shall include executive tables,
chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office
equipment shall include as a minimum of telephone (2 external & 10 internal lines),
photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core
i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical
scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no.,
14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan
printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5
Ton), Water Coolers (as required)etc
-
-
-
... More
During Construction Period
36
-
-
... More
During Maintenance Period
120
-
-
... More
Reports and Document (Fixed costs)
-
-
-
... More
Monthly Report
936
-
-
... More
Half yearly Reports
156
-
-
... More
Various other reports as provided in the Concession Agreement such as Completion Report
30
-
-
... More
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
-
-
-
... More
Surface defects detection and roughness measurement
using Network Survey Vehicle (12.85 kms x 8 times)
36.8
-
-
... More
Pavement strength measurement using FWD (12.85 kms x 4 times)
18.4
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit (12.85kms x 8 times)
36.8
-
-
... More
Road signs inspection using Retro Reflectometer (12.85 kms x 8 times)
18.4
-
-
... More
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
1
-
-
... More
Grand Total
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements