National Highways And Infrastructure Development Corporation Limited Tender

View complete overview of Mizoram NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Works
Consultancy Services
Eprocure
Opening Date15 May 2023
Closing Date28 Jun 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nhidcl/mizoram/dpr/lunglei Bypass/2022-23

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Team Leader Cum Senior Highway Engineer (1 no)

8

-

-

... More
Senior Bridge Engineer (1 no)

4.5

-

-

... More
Highway cum Pavement Engineer (1 no)

4.5

-

-

... More
Material cum Geotechnical Engineer (1 no)

5.5

-

-

... More
B. OTHER PROFESSIONALS

-

-

-

... More
Senior Survey Engineer

6

-

-

... More
Traffic and Safety expert

3.5

-

-

... More
Environmental Specialist

3

-

-

... More
Quantity Surveyor / Documentation Expert

5.5

-

-

... More
Land Acquisition Expert

9

-

-

... More
Utility Expert

3.5

-

-

... More
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate, Minimum 7 to be deployed)

-

-

-

1

-

-

1

-

-

1

-

-

1

-

-

1

-

-

1

-

-

1

-

-

... More
Support Staff (Fixed Rates)

-

-

-

... More
Office Manager (1 No.)

9

-

-

... More
Typist (1 No.)

9

-

-

... More
Office Boy (1 No.)

9

-

-

... More
Night Watchman (1 No.)

9

-

-

... More
Transportation (Fixed costs)

-

-

-

... More
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (2 Vehicle for 9 months each)

18

-

-

... More
Duty Travel to Site (Fixed Costs)

-

-

-

... More
All Trips

1

-

-

... More
Office Rent (Fixed Costs)

-

-

-

... More
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.

9

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication

9

-

-

... More
Office Furniture and Equipment (Fixed costs)

-

-

-

... More
Office Furniture and Equipment

1

-

-

... More
Reports and Document (Fixed costs)

-

-

-

... More
Monthly Report (3 sets)

27

-

-

... More
Inception Report & QAP

3

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Draft Feasibility Report

4

-

-

... More
Final Feasibility Report

6

-

-

... More
Strip Plan with L.A. Reports

6

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Draft Environmental Assessment report & RAP

4

-

-

... More
Final Environmental Assessment report & RAP

6

-

-

... More
Draft Detailed Design Report & Drawings etc.

4

-

-

... More
Draft EMP

4

-

-

... More
Draft Bidding Documents

4

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.

6

-

-

... More
Final EMP

6

-

-

... More
Final Bidding Documents

6

-

-

... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)

9

-

-

... More
LA & Clearances II Report

6

-

-

... More
Survey and Investigation

-

-

-

... More
A. Topographical Survey (Fixed Rate)

-

-

-

... More
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.

1

-

-

... More
B. Investigation (Fixed cost)

-

-

-

... More
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, etc.

1

-

-

... More
Schedule B (Item rate costs)

-

-

-

... More
Sub-soil Investigation & Other Works

-

-

-

... More
Sub-Soil Investigation

-

-

-

... More
a) Boring in all type of soils (other than hard rock)

1500

-

-

... More
b) Boring in hard rock

200

-

-

... More
Network Survey and GPR

-

-

-

... More
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.

1

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Cost of supply and fixing Boundary Pillars

-

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.

1

-

-

... More
Land Acquisition Team including support staff and logistics/transportation

-

-

-

... More
A. Land acquisition Team including support staff

-

-

-

... More
Ex-Land Revenue Inspector/Officer or equivalent

7

-

-

... More
Ex-Kanoongo/ Girdawar or equivalent

7

-

-

... More
Ex-Patwari or equivalent

7

-

-

... More
Typist

7

-

-

7

-

-

... More
B. Logistics for Land acquisition Team

-

-

-

... More
Computer including necessary peripherals (2 nos)

7

-

-

... More
Printers (2 nos)

7

-

-

... More
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1 no)

7

-

-

... More
Grand Total (Schedule A+B)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.