National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Mizoram NHIDCL Tender
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/mizoram/nh- 302/ae/2021-22
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NHIDC_628828_1Bid Award Id
ViewTender No
NHIDCL/Mizoram/NH- 302/AE/2021-22Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Resident cum Highway Engineer 2 (1 No)
78
-
-
... More
Bridge/Structural Engineer (1 No)
33
-
-
... More
Senior Quality Cum Material Expert (1 No)
18
-
-
... More
Road Safety Expert (1 No)
23
-
-
... More
Sub-Professional Staff
-
-
-
... More
Survey Engineer, 2 Nos. (One for Package-A, One for Package-B)
56
-
-
... More
Assistant Highway Engineer, 2 Nos. (One for Package-A, One for Package-B & for Maintenance of Package-A & B)
96
-
-
... More
CAD Expert
12
-
-
... More
Environmental Engineer
6
-
-
... More
Assistant Bridge Engineer, 2 Nos. (One for Package-A, One for Package-B & for Maintenance of Package-A & B)
36
-
-
... More
Assistant Quality cum Material Engineer, 2 Nos. (One for Package-A, One for Package-B)
36
-
-
... More
Electrical Engineer
7
-
-
... More
Quantity Surveyor, 2 Nos. (One for Package-A, One for Package-B)
52
-
-
... More
Horticulture cum Landscaping Expert
36
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (1 No)
78
-
-
... More
Accountant Cum Cashier (1 No)
78
-
-
... More
Steno cum Computer operator (1 No)
78
-
-
... More
Office Boy (1 No)
78
-
-
... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
-
-
-
... More
Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
96
-
-
... More
Bolero or equivalent 4x4 vehicle(not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
96
-
-
... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 24 round trip to Employer's Head Office and 24 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
1
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
... More
One Office of Minimum 200 sqm area shall be rented during Construction Period
18
-
-
... More
One Office of Minimum 50 sqm area shall be rented during Maintenance Period
60
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
-
-
-
... More
During Construction Period
18
-
-
... More
During Maintenance Period
60
-
-
... More
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Executive Table, Executive Chairs, Tables (for executive), Ordinary Chairs Type-I, Tables (for all other staff), Ordinary Chairs–Type II (for all other staff), Steel Almirah, Visitors chairs/Conference room chairs, Tables for computers with 3 drawers, keyboard/mouse pull out trays, Printer desks, Side tables, Conference Table, Revolving Chairs for Computer Room/Drawing room, Telephone with PABX facilities, Photocopier, FAX, Computer PC (state of the art), LaserJet Printers, Binding Machine, Water Coolers and Software, Plotter, Biometric device etc.
-
-
-
... More
During Construction Period
18
-
-
... More
During Maintenance Period
60
-
-
... More
Reports and Document Printing
-
-
-
... More
Monthly reports
234
-
-
... More
Half yearly Reports
39
-
-
... More
Various other reports as provided in the Concession Agreement such as Completion Report
12
-
-
... More
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
-
-
-
... More
Surface defects detection and roughness measurement
using Network Survey Vehicle (57.18 kms x 8 times)
599.6
-
-
... More
Pavement strength measurement using FWD (57.18 kms x 4 times)
299.8
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit (57.18 kms x 8 times)
599.6
-
-
... More
Road signs inspection using Retro Reflectometer (57.18 kms x 8 times)
599.6
-
-
... More
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements