Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Meghalaya PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date29 Jan 2019
Closing Date27 Feb 2019
Tender Amount₹ 1,60,62,999 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying Filter material with granular crushed aggregate as per specification to a thickness of less than 600mm ….etc

162

-

2064

... More
Plastering with cement mortar (1:4), 15mm thick on brickwork in substructure as per Technical specification Clause 613.4 &b1204

232.56

-

267

... More
Un-Lined Surface Drain

-

-

-

... More
(i). Surface drain in ordinary soil construction of unline surface drain of average crossection area 0.40 sqm in ordinary rock...etc. complete

2939.46

-

60

... More
Pavement

-

-

-

... More
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201.

0.48

-

11999

... More
Construction of Subgrade and earthen shoulder Construction of subgrade and earthen shoulder with appoved materials obtained from borrow pit with all lift and leads……etc

3900

-

320

... More
Dismnetling of Flexible Pavements Dismnetling of Flexible Pavements and disposal of dismentled materials upto a lead of 100m, stacking serviceable and unserviceable ....etc (I).By Manual Means (A) Bituminous Courses

170.1

-

843

... More
3).WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 ….etc. (A).By Manual Means

1417.5

-

2696

... More
Prime Coat (i). Low porosity Providing and applying primer coat with bitumen emulsion ( SS-1) on prepared surface of granular base including cleaning of road surface etc

9450

-

33

... More
Tack Coat (iii).Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

9450

-

16

... More
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause. 508.2 Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm agreggate ……etc,. As per technical specification clause 508

9450

-

199

... More
Providing and laying seal coat sealing the voids in bituminous surface laid to specified level, , using cold emulsion grade and cross fall as per technical specification Clause 510

9450

-

70

... More
Traffic Signs,Markings and other Road Appurtenances

-

-

-

... More
Providing and fixing Logo of PMGSY Project. Providing and fixing of typical PMGSY informatory signboard with logo per MORD specifications and drawing…etc

4

-

36368

... More
ii) Ordinary Kilometer Stone (Precast)

4

-

2842

... More
iii) 200 m stone (precast)

12

-

799

... More
(i).Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m

-

-

-

... More
For Stone -

846.4

-

105

... More
For Stone Metal & Chips

2395.58

-

105

... More
For Binding materials -

113.4

-

105

... More
(ii). Loading of earth sand, Moorum, manure, flyash by manual means including a lead upto 30m

-

-

-

... More
For Sand-

94.74

-

53

... More
(iii).Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish,Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m

-

-

-

... More
For Stone -

846.4

-

53

... More
For Stone Metal & Chips

2395.58

-

53

... More
For Binding materials -

113.4

-

53

... More
(iv).Unloading of earth sand, Moorum, manure, flyash by manual means including a lead upto 30m

-

-

-

... More
For Sand-

94.74

-

33

... More
Loading and Unloading of Bitumen drum by Manual Means to lead 30.00m

-

-

-

... More
(i). Loading of bitumen drum by manual means to lead 30.00m

40.45

-

169

... More
(ii). Unloading of bitumen drum by manual means to lead 30.00m

40.45

-

157

... More
Haulage excluding Loading & Unloading Haulage of materials by tipper excluding cost of loading and unloading and stacking.

-

-

-

... More
For Stone -Quarry at 5th Km of MB Road, Ave. Lead= 22.00 Km Case-I Surface Road = 22.00Km

65263

-

6

... More
For Sand- Quarry at 6th Km of Mn Road, Ave. Lead=23.00Km Case-I Surface Road = 23.00Km

4009.4

-

6

... More
For Stone Metal - Quarry at 23rd km of Shillong Sohra Road., Ave. Lead= 35.00Km Case-I Surface Road = 35.00Km

179845.75

-

6

... More
For Binding Material-Quarry at 6th Km of MN Road, Ave. Lead= 23.00Km Case-I Surface Road = 23.00Km

4799.09

-

6

... More
For Bitumen- Factory at Guwahati, Ave. Lead= 183.00Km Case-I Surface Road = 183.00Km

7402.35

-

6

... More
5 Year Maintenance

-

-

-

... More
Year - I

3

-

40000

... More
Year - II

3

-

66666.67

... More
Year - III

3

-

140000

... More
Year - IV

3

-

180000

... More
Year - V

3

-

240000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.