National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Meghalaya NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Eprocure
Opening Date5 May 2020
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Nhidcl/meghalaya/tura Bypass/nh-51/2020
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHIDC_557834_1Bid Award Id
ViewTender No
NHIDCL/Meghalaya/Tura Bypass/NH-51/2020Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Senior Bridge Engineer
5
-
-
... More
Traffic and Safety Expert
4
-
-
... More
Material cum GeoTechnical Engineer cum Geologist
6
-
-
... More
Senior Survey Engineer
7
-
-
... More
Environment Specialist
3
-
-
... More
Quantity Surveyor/Documentation Expert
6
-
-
... More
Land Acquisition Expert
10
-
-
... More
Utility Expert
4
-
-
... More
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)
-
-
-
... More
Position
1
-
-
... More
Position
1
-
-
... More
Position
1
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager
300
-
-
... More
Typist
300
-
-
... More
Office Boy
300
-
-
... More
Transportation (Fixed Costs)
-
-
-
... More
The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
300
-
-
... More
Duty Travel to Site (Fixed Costs)
-
-
-
... More
Trips
10
-
-
... More
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
-
-
-
... More
Office Rent
300
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
... More
Office Supplies
300
-
-
... More
Drafting Supplies
300
-
-
... More
Computer Running Costs
300
-
-
... More
Domestic and International Communication
300
-
-
... More
Office Furniture and Equipment (Rental)
-
-
-
... More
Office Furniture and Equipment
300
-
-
... More
Reports and Document Printing
-
-
-
... More
Monthly Report (3 copies per month)
30
-
-
... More
Inception Report & QAP
3
-
-
... More
Environment and Social Impact Screening Report
4
-
-
... More
Draft Feasibility Report
4
-
-
... More
Final Feasibility Report
6
-
-
... More
Strip Plan with L.A. Reports
6
-
-
... More
Draft LA and Clearances I Report
4
-
-
... More
Final LA and Clearances I Report
4
-
-
... More
Draft Environmental Assessment report& RAP
4
-
-
... More
Final Environmental Assessment report& RAP
6
-
-
... More
Draft Detailed Design Report & Drawings etc. Draft EMP
4
-
-
... More
Draft Bidding Documents
4
-
-
... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
6
-
-
... More
Final Bidding Documents
6
-
-
... More
Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each)
9
-
-
... More
LA & Clearances II Report
6
-
-
... More
Survey and Investigation A. Topographical Survey (Fixed Rate)
-
-
-
... More
Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
580
-
-
... More
Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology
580
-
-
... More
Sub-surface utilities detection using Ground Penetrating Radar, Induction Locator or better technologies
1
-
-
... More
Survey/Investigation using Network Survey Vehicle as per TOR
580
-
-
... More
Investigation (Fixed cost)(lumpsum)
-
-
-
... More
Road and Bridge Inventory
1
-
-
... More
BBD Test and Pavement Evaluation
1
-
-
... More
Roughness Survey
1
-
-
... More
Axle Load Survey
1
-
-
... More
Material Survey and Investigation
1
-
-
... More
Sub-grade Investigation
1
-
-
... More
Traffic Survey
1
-
-
... More
Socio-economic & Census Survey/Studies
1
-
-
... More
Land Acquisition Studies
1
-
-
... More
Any other investigations/surveys
1
-
-
... More
Sub-Soil Investigation (Boring) (Rate/m)
-
-
-
... More
a) In soil other than hard rock
2000
-
-
... More
b) In hard rock
300
-
-
... More
Fixing Boundary pillars
-
-
-
... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval
1
-
-
... More
Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost)
1
-
-
Evaluation Notes How It Works ?