National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Meghalaya NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Eprocure
Opening Date5 May 2020
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Nhidcl/meghalaya/tura Bypass/nh-51/2020
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHIDC_557834_1Bid Award Id
ViewTender No
NHIDCL/Meghalaya/Tura Bypass/NH-51/2020Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Senior Bridge Engineer
5
-
-
Traffic and Safety Expert
4
-
-
Material cum GeoTechnical Engineer cum Geologist
6
-
-
Senior Survey Engineer
7
-
-
Environment Specialist
3
-
-
Quantity Surveyor/Documentation Expert
6
-
-
Land Acquisition Expert
10
-
-
Utility Expert
4
-
-
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)
-
-
-
Position
1
-
-
Position
1
-
-
Position
1
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager
300
-
-
Typist
300
-
-
Office Boy
300
-
-
Transportation (Fixed Costs)
-
-
-
The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
300
-
-
Duty Travel to Site (Fixed Costs)
-
-
-
Trips
10
-
-
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
-
-
-
Office Rent
300
-
-
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
Office Supplies
300
-
-
Drafting Supplies
300
-
-
Computer Running Costs
300
-
-
Domestic and International Communication
300
-
-
Office Furniture and Equipment (Rental)
-
-
-
Office Furniture and Equipment
300
-
-
Reports and Document Printing
-
-
-
Monthly Report (3 copies per month)
30
-
-
Inception Report & QAP
3
-
-
Environment and Social Impact Screening Report
4
-
-
Draft Feasibility Report
4
-
-
Final Feasibility Report
6
-
-
Strip Plan with L.A. Reports
6
-
-
Draft LA and Clearances I Report
4
-
-
Final LA and Clearances I Report
4
-
-
Draft Environmental Assessment report& RAP
4
-
-
Final Environmental Assessment report& RAP
6
-
-
Draft Detailed Design Report & Drawings etc. Draft EMP
4
-
-
Draft Bidding Documents
4
-
-
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
6
-
-
Final Bidding Documents
6
-
-
Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each)
9
-
-
LA & Clearances II Report
6
-
-
Survey and Investigation A. Topographical Survey (Fixed Rate)
-
-
-
Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
580
-
-
Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology
580
-
-
Sub-surface utilities detection using Ground Penetrating Radar, Induction Locator or better technologies
1
-
-
Survey/Investigation using Network Survey Vehicle as per TOR
580
-
-
Investigation (Fixed cost)(lumpsum)
-
-
-
Road and Bridge Inventory
1
-
-
BBD Test and Pavement Evaluation
1
-
-
Roughness Survey
1
-
-
Axle Load Survey
1
-
-
Material Survey and Investigation
1
-
-
Sub-grade Investigation
1
-
-
Traffic Survey
1
-
-
Socio-economic & Census Survey/Studies
1
-
-
Land Acquisition Studies
1
-
-
Any other investigations/surveys
1
-
-
Sub-Soil Investigation (Boring) (Rate/m)
-
-
-
a) In soil other than hard rock
2000
-
-
b) In hard rock
300
-
-
Fixing Boundary pillars
-
-
-
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval
1
-
-
Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements