National Highways And Infrastructure Development Corporation Limited Tender

View complete overview of Meghalaya NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Works
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date26 May 2023
Closing Date7 Aug 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nhidcl/megh./ae/swb/pkg I,ii And Iii/2023

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge/Structural Engineer (2 Nos. during Construction Period) (2*24) = 48

48

-

-

... More
Senior Quality cum Material Expert (2 Nos. during Construction Period) (2*24) = 48

48

-

-

... More
Sub-Professional Staff

-

-

-

... More
Assistant Quality cum Material Engineer (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108

108

-

-

... More
Quantity Surveyor (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108

108

-

-

... More
Assistant Highway Engineer (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108

108

-

-

... More
Support Staff (inclusive of per diem allowance)

-

-

-

... More
Office Manager cum Accountant cum Cashier (3 Nos. during Construction Period & 2 Nos. during Maintainence Period) (3*24)+(2*60) = 192

192

-

-

... More
Steno cum Computer Operator (3 Nos. during Construction Period) (3*24) = 72

72

-

-

... More
Office Boy (3 Nos. during Construction Period & 2 Nos. during Maintainence Period) (3*24)+(2*60) = 192

192

-

-

... More
Transportation (Fixed Costs)

-

-

-

... More
4*4 Vehicle Scorpio or equivalent (not more than 2 years old) (3 nos during Construction Period and 2 no. during Maintenance Period), (3*24)+(2*60) = 192 Rate per month

192

-

-

... More
Motorcycle for Main Office during Construction (1*24) = 24

24

-

-

... More
Motorcycle for Site Office during Construction (2*24) = 48

48

-

-

... More
Motorcycle for Site Office during Maintenance (1*60) = 60

60

-

-

... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.

-

-

-

... More
Main office of minimum 200 sqm area for Construction Period and Two Site office of Minimum 100 sqm area for construction period (1*24)+(2*24) = 72

72

-

-

... More
Defect Liability Period (min. 100sqm area) (2*60)

120

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Office Supplies (3*24)+(2*60) = 192

192

-

-

... More
Drafting Supplies (3*24)+(2*60) = 192

192

-

-

... More
Computer Running Costs (3*24)+(2*60) = 192

192

-

-

... More
Domestic and International Communication (3*24)+(2*60) = 192

192

-

-

... More
Office Furniture and Equipment (Rental)

-

-

-

... More
(Rental) (3*24)+(2*60) = 192

192

-

-

... More
Reports and Document Printing ( rate as per copy)

-

-

-

... More
Monthly reports (Design and Construction) (84 months * 3 Copies) = 252 Copies

252

-

-

... More
Half yearly Reports (14 months * 3 Copies) = 42 Copies

42

-

-

... More
Various others reports as provided in the Concession Agreement such as Completion Report

1

-

-

... More
Road Survey Equipment, Rate per Km

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle (38.346 Km * 8 Nos.)= 306.79 Km

306.79

-

-

... More
Pavement strength measurement using FWD (38.346 Km * 4 Nos.)= 153.38 Km

153.38

-

-

... More
Bridge inspection using Mobile Bridge Inspection Unit ( 38 *8 Nos.)=176 Nos.

304

-

-

... More
Road signs inspection using Retro Reflectometer (38.346 Km * 8 Nos.)= 306.79 Km

306.79

-

-

... More
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.