National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Meghalaya NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date7 Aug 2023
Closing Date4 Sep 2023
Tender AmountRefer Documents
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/megh/ae/d-d-w/ Nh-217/nh-127b/2023
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NHIDC_765761_1Bid Award Id
ViewTender No
NHIDCL/Megh/AE/D-D-W/ NH-217/NH-127B/2023Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Bridge/Structural Engineer (2 Nos. during Construction Period) (2*24) = 48
48
-
-
... More
Senior Quality cum Material Expert (2 Nos. during Construction Period) (2*24) = 48
48
-
-
... More
Sub-Professional Staff
-
-
-
... More
Assistant Quality cum Material Engineer (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108
108
-
-
... More
Quantity Surveyor (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108
108
-
-
... More
Assistant Highway Engineer
(2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108
108
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager cum Accountant cum Cashier (3 Nos. during Construction Period & 2 Nos. during Maintainence Period) (3*24)+(2*60) = 192
192
-
-
... More
Steno cum Computer Operator (3 Nos. during Construction Period) (3*24) = 72
72
-
-
... More
Office Boy (3 Nos. during Construction Period & 2 Nos. during Maintainence Period) (3*24)+(2*60) = 192
192
-
-
... More
Transportation (Fixed Costs)
-
-
-
... More
4*4 Vehicle Scorpio or equivalent (not more than 2 years old) (3 nos during Construction Period and 2 no. during Maintenance Period), (3*24)+(2*60) = 192
Rate per month
192
-
-
... More
Motorcycle for Main Office during Construction
(1*24) = 24
24
-
-
... More
Motorcycle for Site Office during Construction
(2*24) = 48
48
-
-
... More
Motorcycle for Site Office during Maintenance
(1*60) = 60
60
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
... More
Main office of minimum 200 sqm area for Construction Period and Two Site office of Minimum 100 sqm area for construction period
(1*24)+(2*24) = 72
72
-
-
... More
Defect Liability Period (min. 100sqm area)
(2*60)
120
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
... More
Office Supplies
(3*24)+(2*60) = 192
192
-
-
... More
Drafting Supplies
(3*24)+(2*60) = 192
192
-
-
... More
Computer Running Costs
(3*24)+(2*60) = 192
192
-
-
... More
Domestic and International Communication
(3*24)+(2*60) = 192
192
-
-
... More
Office Furniture and Equipment (Rental)
-
-
-
... More
(Rental)
(3*24)+(2*60) = 192
192
-
-
... More
Reports and Document Printing ( rate as per copy)
-
-
-
... More
Monthly reports
(Design and Construction)
(84 months * 3 Copies) = 252 Copies
252
-
-
... More
Half yearly Reports (14 months * 3 Copies) = 42 Copies
42
-
-
... More
Various others reports as provided in the Concession Agreement such as Completion Report
1
-
-
... More
Road Survey Equipment, Rate per Km
-
-
-
... More
Surface defects detection and roughness measurement using Network Survey Vehicle (77.475 Km * 8 Nos.)= 619.8 Km
619.8
-
-
... More
Pavement strength measurement using FWD (77.475 Km * 4 Nos.)= 309.9 Km
309.9
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit ( 45 *8 Nos.)=360 Nos.
360
-
-
... More
Road signs inspection using Retro Reflectometer (77.475 Km * 8 Nos.)= 619.8 Km
619.8
-
-
... More
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements