Military Engineer Services Tender
View complete overview of Meghalaya MES Tender
Costs
EMD
₹ 28,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Repair / Maint Of Dg Sets And Allied Equipments, Ups And Allied Works
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_667984_1Bid Award Id
ViewTender No
8848/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
S&F V Belt Cogged for Alternator pulley complete incl matching with existing model of DG set 10 KVA, complete all as specified and directed.
2
-
-
S&F V Belt Cogged for Blower pulley complete incl matching with existing model of DG set 10 KVA, complete all as specified and directed.
2
-
-
M&L for Calibration and cleaning of fuel injectors of DG set 10 KVA, complete all as specified and directed.
2
-
-
Repair and preventive maintenance, servicing of DG sets of capacity 25 KVA carryout Maint and servicing as per the OEM (Original equipment manufacturer) is manual based on 200 hours run / 3 Month run of the DG set, inspecting all the parts/portion for its serviceability of air intake system, fuel system, lubricating system, cooling system and electrical system, inspecting, tracing out the faults, dismantling, cleaning, replacement of defective parts, and fixing of serviceable parts/refixing exist serviceable parts, rectification of leakage of fuel and oil from any parts/body of DG set, cleaning the out door body and inner body. checking and setting the parameters of system after repair and reassembling including testing on completion and entire satisfaction of of Engr-in-Charge.
Note: (i) The spare parts for servicing shall be measured and paid seprately under relevent items of BOQ. (ii) The repair & servicing shall be carried out by the auth company's service engineer only. (iii) The first service of the DG set shall be done with in one month from the date of commencement of tender and second service after 6 month or 250 hrs run from the date of first service all as directed by Engr-in-Charge. (iv) All spare parts shall be ordered as per matching with existing model No of DG set all as directed. Location: GE office SM no: NYA Engine Make: Kirloskar , Model no : HA394TCIG1
2
-
-
S&F complete service kit including of air filter, Lube Oil Filter, fuel filter complete incl matching with existing model of 25KVA DG set, complete all as specified and directed.
2
-
-
S&F V Belt Cogged for Alternator pulley complete incl matching with existing model of DG set 25 KVA, complete all as specified and directed.
1
-
-
S&F V Belt Cogged for Blower pulley complete incl matching with existing model of DG set 25 KVA, complete all as specified and directed.
1
-
-
S&F Air Filter element complete incl matching with existing model of DG set 25 KVA, complete all as specified and directed.
1
-
-
Repair and preventive maintenance, servicing of DG sets of capacity 62.5 KVA carry out Maint and servicing as per the OEM is manual based on 200 hours run / 3 Month run of the DG set, inspecting all the parts/portion for its serviceability of air intake system, fuel system, lubricating system, cooling system and electrical system, inspecting, tracing out the faults, dismantling, cleaning, replacement of defective parts, and fixing of serviceable parts/refixing exist serviceable parts, rectification of leakage of fuel and oil from any parts/body of DG set, cleaning the out door body and inner body. checking and setting the parameters of system after repair and reassembling incl. testing on completion and entire satisfaction of of Engr-in-Charge. Note: (i) The spare parts for servicing shall be measured and paid seprately under relevent items of BOQ.(ii) The repair&servicing shall be carried out by the company's service engineer only. (iii) The first service of the DG set shall be done with in one month from the date of commencement of tender and second service after 6 month or 250 hrs run from the date of first service all as directed by Engr -in- Charge. (iv) All spare parts shall be ordered as per matching with existing model No of DG set all as directed. Location: 24 Mtn Bde Sig Coy SM No: 548/6290-DG/17 Engine Make : Cotton Greaves , Model no : 4G11TAG22
2
-
-
S&F complete service kit including of air filter, Lube Oil Filter, fuel filter complete incl matching with existing model of 62.5KVA DG set, complete all as specified and directed.
2
-
-
S&F V Belt Cogged for Alternator pulley complete incl matching with existing model of DG set 62.5 KVA, complete all as specified and directed.
1
-
-
S&F V Bet Cogged for Blower pulley complete incl matching with existing model of DG set 62.5 KVA, complete all as specified and directed.
1
-
-
M&L for Calibration and cleaning of fuel injectors of DG set 62.5 KVA, complete all as specified and directed.
1
-
-
M&L for cleaning the fuel tank both internally and externally by removing all the dust / sediments etc including writing of tank capacity, Date of cleaning , and next due date for tank to be cleaning, complete all as specified and directed.
1
-
-
M&L for Dismantling of radiator, taking it to work shop for overhauling & cleaning descaling with acid, removal of leakage, welding brazing & refixing it duly repaired etc of DG set 62.5 KVA, complete all as specified and directed.
1
-
-
M&L for tappet setting, including replacement of gaskets, springs of DG set 62.5 KVA, complete all as specified and directed.
1
-
-
S&F Fuel Gauge complete including matching with existing model of DG set 62.5 KVA, complete all as specified and directed.
1
-
-
S&F Fan Belt complete including matching with existing model of 62.5KVA DG set, complete all as specified and directed.
1
-
-
Repair and preventive maintenance, servicing of DG sets of capacity 82.5 KVA carry out Maint and servicing as per the OEM is manual based on 200 hours run/ 3 Month run of the DG set, inspecting all the parts/portion for its serviceability of air intake system, fuel system, lubricating system, cooling system and electrical system, inspecting, tracing out the faults, dismantling, cleaning, replacement of defective parts, and fixing of serviceable parts/refixing exist serviceable parts, rectification of leakage of fuel and oil from any parts/body of DG set, cleaning the out door body and inner body. checking and setting the parameters of system after repair and reassembling incl. testing on completion and entire satisfaction of of Engr-in-Charge. Note:- (i) The spare parts for ruotine servicing shall be measured and paid seprately under relevent items of BOQ.(ii) The repair&servicing shall be carried out by the company's service engineer only. (iii) The first service of the DG set shall be done with in one month from the date of commencement of tender and second service after 6 month or 250 hrs run from the date of first service all as directed by Engr -in- Charge. (iv) All spare parts shall be ordered as per matching with existing model No of DG set all as directed. Location: Jackwell Pump House SM no: A-097/6235-DG/16, Engine Make : Kirloskar Green, Model no : 4H8901/1420055,
2
-
-
S&F complete service kit including of air filter, Lub Oil Filter, fuel filter complete incl matching with existing model of 82.5KVA DG set, complete all as specified and directed.
2
-
-
S&F V Belt Cogged for Alternator pulley complete incl matching with existing model of DG set 82.5 KVA, complete all as specified and directed.
1
-
-
S&F V Belt Cogged for Blower pulley complete incl matching with existing model of DG set 82.5 KVA, complete all as specified and directed.
1
-
-
M&L for Calibration and cleaning of fuel injectors of DG set 82.5 KVA, complete all as specified and directed.
1
-
-
M&L for cleaning the fuel tank both internally and externally by removing all the dust / sediments etc including writing of tank capacity, Date of cleaning, and next due date for tank to be cleaning of dg set, complete all as specified and directed.
1
-
-
M&L for Dismantling of radiator , taking it to work shop for overhauling & cleaning descaling with acid removal of leakage, welding brazing & refixing it duly repaired etc of DG set 82.5 KVA, complete all as specified and directed.
1
-
-
Repair and preventive maintenance, servicing of DG sets of capacity 125 KVA carry out Maint and servicing as per the OEM is manual based on 200 hours run/ 3 Month of the DG set, inspecting all the parts/portion for its serviceability of air intake system, fuel system, lubricating system, cooling system and electrical system, inspecting, tracing out the faults, dismantling, cleaning, replacement of defective parts, and fixing of serviceable parts/refixing exist serviceable parts, rectification of leakage of fuel and oil from any parts/body of DG set, cleaning the out door body and inner body. checking and setting the parameters of system after repair and reassembling incl. testing on completion and entire satisfaction of of Engr-in-Charge. Note (i) The spare parts shall be measured and paid seprately under relevent items of BOQ. (ii) The repair&servicing shall be carried out by the company's service engineer only. (iii) The first service of the DG set shall be done with in one month from the date of commencement of tender and second service after 6 month or 250 hrs run from the date of first service all as directed by Engr -in- Charge. (v) All spare parts shall be ordered as per matching with existing model No of DG set all as directed. (a) Location: Div officeSM no: 548/6291-DG/18, Engine Make : Cotton Greaves , Model no :4G11TAG26, (b) Location: MAP Pump house SM no:548/6253/DG/16, Engine Make : Kirloskar , Model no :4K1080TAG42, (c) Location: Temp Pump House SM no:548/6116-DG/AL/06, Engine Make : Kirloskar , Model no :6H3501/0600777.
6
-
-
S&F complete service kit including of air filter, Lub Oil Filter, fuel filter complete incl matching with existing model of 125 KVA DG set, complete all as specified and directed.
6
-
-
S&F Air Filter element complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
2
-
-
M&L for Calibration and cleaning of fuel injectors of DG set 125 KVA, complete all as specified and directed.
2
-
-
M&L for cleaning the fuel tank both internally and externally by removing all the dust / sediments etc including writing of tank capacity, Date of cleaning , and next due date for tank to be cleaning of dg set, complete all as specified and directed.
3
-
-
M&L for Dismantling of radiator , taking it to work shop for overhauling & cleaning descaling with acid removal of leakage, welding brazing & refixing it duly repaired etc of DG set 125 KVA, complete all as specified and directed.
3
-
-
M&L for tappet setting, including replacement of gaskets, springs of DG set 125 KVA, complete all as specified and directed.
3
-
-
S&F Water Pump complete incl matching with existing model of 62.5KVA DG set, complete all as specified and directed.
1
-
-
S&F Fan Belt complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
1
-
-
S&F Hose Clip complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
2
-
-
S&F Flexible Pipe complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
1
-
-
S&F Water Hose Pipe complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
1
-
-
S&F Water Pump complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
1
-
-
S&F AVR plate complete incl matching with existing model of 62.5KVA DG set, complete all as specified and directed.
1
-
-
S&F Alternator rubber Coupling complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
1
-
-
Repair and preventive maintenance, servicing of DG sets of capacity 400 KVA carry out Maint and servicing as per the OEM is manual based on 200 hours run/ 3 Month of the DG set, inspecting all the parts/portion for its serviceability of air intake system, fuel system, lubricating system, cooling system and electrical system, inspecting, tracing out the faults, dismantling, cleaning, replacement of defective parts, and fixing of serviceable parts/refixing exist serviceable parts, rectification of leakage of fuel and oil from any parts/body of DG set, cleaning the out door body and inner body. checking and setting the parameters of system after repair and reassembling incl. testing on completion and entire satisfaction of of Engr-in-Charge. Note (i) The spare parts for servicing shall be measured and paid seprately under relevent items of BOQ. (ii) The repair&servicing shall be carried out by the company's service engineer only. (iii) The first service of the DG set shall be done with in one month from the date of commencement of tender and second service after 6 month or 250 hrs run from the date of first service all as directed by Engr -in- Charge. (v) All spare parts shall be ordered as per matching with existing model No of DG set all directed. Location : Main Pump House. MES No:DG-583/6303/DG/19 , Engine Alt-583/6303/AL/19. Model No DV8TAG3, Make: Kirloskar
2
-
-
S&F complete service kit including of air filter, Lub Oil Filter, fuel filter with O rings complete incl matching with existing model of 400 KVA DG set, complete all as specified and directed.
2
-
-
S&F Air Cleaner safety Element and air cleaner primary element for DG 400KVA, complete all as specified and directed.
2
-
-
M&L for cleaning the fuel tank both internally and externally by removing all the dust / sediments etc including writing of tank capacity, Date of cleaning , and next due date for tank to be cleaning of dg set, complete all as specified and directed.
1
-
-
M&L for Dismantling of radiator , taking it to work shop for overhauling & cleaning descaling with acid removal of leakage, welding brazing & refixing it duly repaired etc of DG set 400 KVA, complete all as specified and directed.
1
-
-
Dismantling the alternator from the Diesel generator of Capacity upto 125 KVA set safely, Transporting to the workshop if required, Cutting the burnt out winding of the alternator including the insulation paper lining of the stator ,Cleaning the stator and armature post, rewinding the armature or stator with same guage Copper wire of same thickness and have the same number of winds as of original winding for each set of coil precisely and compact without any unnecessary crimping or Spacing ,reassembling the alternator in the DG Set giving a trial run of the DG Set complete all as specified and directed upto the entire satisfaction of Engr-in-Charge.
1
-
-
Supply & fixing in replacement of coolant of make, complete all as specified and directed.
360
-
-
Supply & fixing in replacement of Engine oil, complete all as specified and directed.
335
-
-
M&L for repair / overhauling of self starter 12 Volts incl. replacement of carbon brushes, bearing, bushes, rewinding of armature and field etc. and warnishing, complete all as specified and directed.
1
-
-
S&F Petroleum Jelly 1 Kg plastic sealed container, complete all as specified and directed.
2
-
-
M& L for repairing of Diesel Generator set of Capacity 62.5 KVA by checking Valve seat,valve guide,checking the circuit, instrument charging generator and starting motor in the power supply system, adjusting each system to restore the dynamic performance and fastening performance of diesel engine parts with tappet setting and calibration to ensure good condition with replacement of following Parts like Upper Gasket- 02 Nos, Head Gasket- 02 Nos Cylinder Liner- 04 Nos , Governor- 01 Nos, complete all as specified and directed.
1
-
-
M& L for complete repairing of Diesel Generator set of Capacity 82.5 KVA by checking Valve seat,valve guide,checking the circuit, instrument charging generator and starting motor in the power supply system, adjusting each system to restore the dynamic performance and fastening performance of diesel engine parts with tappet setting and calibration to ensure good condition with Dismantling , replacement and Installing of following Parts like Delivery Valve- 04, cylinder Bearing- 02 Element -04, Governer Kit-01,Nozzle Testing- 04, Turbokit-01 Charger- 01 Nos, complete all as specified and directed.
1
-
-
M& L for complete repairing of Diesel Generator set of Capacity 125 KVA by checking Valve seat,valve guide,checking the circuit, instrument charging generator and starting motor in the power supply system, adjusting each system to restore the dynamic performance and fastening performance of diesel engine parts with tappet setting and calibration to ensure good condition with Dismantling , replacement and Installing of following Parts like Delivery Valve- 04, Cylinder ring -04, Gasket Set-02, Nozzle Testing- 04, Turbokit-01 Nos, complete all as specified and directed.
1
-
-
S&F AVR plate complete incl matching with existing model of 82.5 KVA DG set, complete all as specified and directed.
1
-
-
S&F AVR plate complete incl matching with existing model of 125KVA DG set, complete all as specified and directed.
1
-
-
S&F AVR plate complete incl matching with existing model of 400 KVA DG set, complete all as specified and directed.
1
-
-
Supply and fix Engine controller Panel Board for DG Set of Capacity 82.5 KVA for GENSET MODEL : KG/-82.5WS Make : Kirloskar (DSE6120MKII) along with complete wiring from the controller to Engine and alternator, complete all as specified and directed.
1
-
-
Supply and fix Engine controller Panel Board for DG Set of Capacity 125 KVA for GENSET MODEL : KG/-125KVA Make : Kirloskar along with complete wiring from the controller to Engine and alternator, complete all as specified and directed.
1
-
-
Repairing of self starter replacing solenoid and winding of the armature coil upto the satisfaction and complete testing, complete all as specified and directed.
2
-
-
Supply only 12 Volt, 150 AH Battery Suitable for 62.5 KVA to 320KVA Dg set having Superior Maintenance free characteristic, high charge retention Characteristic ,vent Caps with advanced flame arrestors and micro porous filter disc to arrest acid fumes all as specified and directed as per Engr-in-Charge. Make- EXIDE CAT Part No: FGP0- GP110D31L
3
-
-
Supply only SMF 12 Volt, 26 AH Battery Suitable for UPS set having Superior Maintenance free characteristic, high charge retention Characteristic ,vent Caps with advanced flame arrestors and micro porous filter disc to arrest acid fumes all as specified and directed as per Engr-in-Charge. Make- EXIDE POWER SAFE PLUS CAT Part No: EP-26-12(ABS)
60
-
-
Supply and fix fuel Sensor with thermostat for the DG Set of capacity 62.5 KVA of Existing make, complete all as specified and directed.
1
-
-
Supply and fix fuel Sensor for the DG Set of capacity 82.5 KVA of Existing make, complete all as specified and directed.
1
-
-
Supply and fix fuel Sensor for the DG Set of capacity 125 KVA of Existing make, complete all as specified and directed.
1
-
-
Supply and fix Automatic Voltage Corrector for Dg Set of Capacity 125 KVA, complete all as specified and directed.
1
-
-
Supply and fix thermostat for the DG Set of capacity 82.5 KVA of Existing make, complete all as specified and directed.
1
-
-
Supply and fix thermostat for the DG Set of capacity 125 KVA of Existing make all as specified and directed by Engr-in-charge
1
-
-
Supply and fix SMPS Battery Charger for lead acid battery for Engine start applications operating input range 170 to 270V forced air Cooled , low stand by Power consumption and high efficency for 125 KVA Dg set all as specified and directed by Engr-in-charge
1
-
-
Repair and preventive maintenance, servicing of UPS of Capacity 20 KVA inncluding Cleaning and tightening all power connection at input and output terminals, at all breakers and at the terminal posts and post on the rectifier and inverter legs,checking all the power Cabling for abrasion, burn Posts , overheating,swelling,leaking,checking Printed Ckt Board arrangement with replacement of following items all as directed and specified by Engr-in-charge.:
(i) Supply and fix in replacement IGBT 600v/200a- 01 Nos suitable for and Upto 20KVA UPS all as directed by Engr-in-charge.
(ii) Supply and fix in replacement driver card -01 Nos suitable for and Upto 20KVA UPS all as directed by Engr-in-charge.
(iii) Supply and fix in replacement SMPS card - 01 Nos suitable for and Upto 20KVA UPS, complete all as specified and directed.
(iv) Supply and fix in replacement output Sensor TX PCB (350V/20-0-20) - 01 Nos suitable for and Upto 20KVA UPS, complete all as specified and directed.
(iv) Supply and fix in replacement Input Sensor TX PCB (415V/20-0-20) - 01 Nos suitable for and Upto 20KVA UPS, complete all as specified and directed.
(v) Supply and fix in replacement Charger card 360V- 01 Nos suitable for and Upto 20KVA UPS, complete all as specified and directed.
2
-
-
Repair and preventive maintenance, servicing of 2 Ton E.O.T crane and electric control panel wiring newly & replace all parts, Main hoist brake Drum & Motor servicing CT gear box, motor and brake, all limit Switch and crane wheels checking, servicing, LT Gear Box, Motor Checking and servicing. Control panel install and connection properly including load testing on Completion and entire Satisfaction of Engineer-in-Charge with replacement of following items:
Note- (i) The Cost of Spares is deemed to be included in the quoted rate. (ii) All T&P items and Transportation required is deemed to be included in quoted rate. (iii) Load testing Certificate duly Vetted by Manufacturer/Govt organisation Shall be Produced by the Contractor after the Successful Completion of the work.
(i) Supply and fix in replacement 63 A 3P 110VAC Contactor, complete all as specified and directed.
(ii) Supply and fix in replacement 2 NO 2 NC Add Block, complete all as specified and directed.
(iii) Supply and fix in replacement 40 A 3P 110VAC Contactor, complete all as specified and directed.
(iv) Supply and fix in replacement1 NO 1 NC Add Block, complete all as specified and directed.
(v) Supply and fix in replacement 32 A 3P 110VAC Contactor, complete all as specified and directed.
(vi) Supply and fix in replacement 8 Way Pendent Switch off ,Up down,left right and cross left right, complete all as specified and directed.
2
-
-
Schedule of Credit
-
-11970
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements