National Highways And Infrastructure Development Corporation Limited Tender

Download documents of Manipur NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Works
Consultancy Services
Eprocure
Opening Date29 May 2023
Closing Date12 Jul 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nhidcl/manipur/dpr/nh-02/ccpur To Tipaimukh /2023

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Night Watchman (1 No.)

10

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Final Environmental Assessment report & RAP

6

-

-

... More
Office Manager (1 No.)

10

-

-

... More
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.

1

-

-

... More
Office Boy (1 No.)

10

-

-

1

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.

1

-

-

... More
Senior Survey Engineer

7

-

-

... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)

9

-

-

... More
Inception Report & QAP

3

-

-

... More
Utility Expert

4

-

-

... More
Duty Travel to Site (Fixed Costs)

-

-

-

... More
Team Leader Cum Senior Highway Engineer (1 no)

9

-

-

... More
Traffic and Safety expert

4

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
A. Topographical Survey (Fixed Rate)

-

-

-

... More
Draft EMP

4

-

-

... More
Environmental Specialist

3

-

-

... More
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (2 Vehicle for 9 months each)

20

-

-

... More
Survey and Investigation

-

-

-

... More
Typist (1 No.)

10

-

-

... More
Final Bidding Documents

6

-

-

... More
Land Acquisition Team including support staff and logistics/transportation

-

-

-

... More
Land Acquisition Expert

10

-

-

... More
Senior Bridge Engineer (1 no)

5

-

-

... More
Transportation (Fixed costs)

-

-

-

... More
Ex-Kanoongo/ Girdawar or equivalent

8

-

-

8

-

-

... More
Network Survey and GPR

-

-

-

... More
Printers (2 nos)

8

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Office Furniture and Equipment

1

-

-

... More
A. Land acquisition Team including support staff

-

-

-

... More
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.

1

-

-

... More
Office Furniture and Equipment (Fixed costs)

-

-

-

... More
Typist

8

-

-

... More
B. Logistics for Land acquisition Team

-

-

-

... More
Monthly Report (3 sets per month) i.e 10*3=30

30

-

-

... More
Sub-soil Investigation & Other Works

-

-

-

1

-

-

... More
Strip Plan with L.A. Reports

6

-

-

... More
Material cum Geotechnical Engineer-Geologist (1 no)

6

-

-

... More
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate, Minimum 7 to be deployed)

-

-

-

... More
Final EMP

6

-

-

1

-

-

... More
Grand Total (Schedule A+B)

-

-

-

... More
Draft Environmental Assessment report & RAP

4

-

-

... More
Schedule A (Fixed Lumpsum Cost)

-

-

-

... More
Schedule B (Item rate costs)

-

-

-

... More
Support Staff (Fixed Rates)

-

-

-

... More
All Trips

1

-

-

1

-

-

... More
B. Investigation (Fixed cost)

-

-

-

... More
Office Rent (Fixed Costs)

-

-

-

... More
A. KEY PROFESSIONALS

-

-

-

... More
b) Boring in hard rock

300

-

-

1

-

-

... More
LA & Clearances II Report

6

-

-

1

-

-

... More
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1 no)

8

-

-

... More
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.

10

-

-

... More
Cost of supply and fixing Boundary Pillars

-

-

-

... More
Remuneration for Local Staff (including per diem allowance)

-

-

-

1

-

-

... More
Computer including necessary peripherals (2 nos)

8

-

-

... More
Ex-Patwari or equivalent

8

-

-

... More
Draft Feasibility Report

4

-

-

... More
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, etc.

1

-

-

... More
Highway cum Pavement Engineer (1 no)

5

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication

10

-

-

... More
Draft Bidding Documents

4

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Ex-Land Revenue Inspector/Officer or equivalent

8

-

-

... More
Quantity Surveyor / Documentation Expert

6

-

-

... More
Reports and Document (Fixed costs)

-

-

-

... More
Draft Detailed Design Report & Drawings etc.

4

-

-

... More
a) Boring in all type of soils (other than hard rock)

2000

-

-

... More
Sub-Soil Investigation

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.