National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Manipur NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Other Consultancy Services
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date13 Apr 2021
Closing Date11 Jun 2021
Tender Amount₹ 55,89,10,000
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Consultancy Services For Ae For Supervision Of Widening To 2 (two) Lane With Paved Shoulder Of Imphal To Jiribam Section Of Nh-37 (pkg- 1,2 And 3)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NHIDC_626684_1Bid Award Id
ViewTender No
NHIDCL/Manipur /AE/IJ(Pkg-1,2,3) IB/2021Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Bridge/Structural Engineer (1 No)
1*18=18
18
-
-
Senior Pavement Specialist (2 Nos)
2*18=36
36
-
-
Senior Quality cum Material Expert (2 Nos)
2*18=36
36
-
-
Road Safety Expert (1 No)
1*18=18
18
-
-
Sub-Professional Staff
-
-
-
Survey Engineer (2 Nos)
2*18=36
36
-
-
Assistant Bridge Engineer (2 Nos)
(2*18+ 1*60)=96
96
-
-
Assistant Quality cum Material Engineer (2 Nos)
(2*18+ 1*30)=66
66
-
-
Lab Technician (2 Nos)
2*18=36
36
-
-
Quantity Surveyor (2 Nos)
(2*18+ 1*120)=156
156
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager cum Accountant (1 Nos)
(1*18+ 1*120)= 138
138
-
-
Steno cum Computer Operator (2 Nos)
(2*18+ 1*120)= 156
156
-
-
Office Boy (2 Nos)
(2*18+ 1*120)= 156
156
-
-
Transportation (Fixed Costs)
-
-
-
Innova/scorpio or equivalent (not more than 2 years old) (4 nos during Construction Period), 4*18=72
Rate per month
72
-
-
Innova/scorpio or equivalent (not more than 2 years old) (1 nos during Maintenance period/DLP), 1*120=120
Rate per month
120
-
-
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
-
-
-
For 9 round trip to Employer's Head Office
18
-
-
For 9 round trip to Employer's regional office.
18
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
During Construction period (1 Nos) 1*18=18
18
-
-
During Maintenance /DLP period (1 No)
1*120=120
120
-
-
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
Office Supplies during construction period 1*18=18
18
-
-
Office Supplies during Maintenance /DLP period 1*120=120
120
-
-
Drafting Supplies during construction period 1*18=18
18
-
-
Drafting Supplies during Maintenance /DLP period 1*120=120
120
-
-
Computer Running Costs during construction period 1*18=18
18
-
-
Computer Running Costs during Maintenance /DLP period 1*120=120
120
-
-
Domestic and International Communication during construction period 1*18=18
18
-
-
Domestic and International Communication during Maintenance /DLP period 1*120=120
120
-
-
Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
-
-
-
During Construction period 1*18=18
18
-
-
During Maintenance /DLP period 1*120=120
120
-
-
Reports and Document Printing ( rate as per copy)
-
-
-
Monthly reports
(Design and Construction)
414
-
-
Half yearly Reports
69
-
-
Various others reports as provided in the Concession Agreement such as Completion Report
1
-
-
Road Survey Equipment, Rate per Km
-
-
-
Surface defects detection and roughness measurement using Network Survey Vehicle
508.9
-
-
Pavement strength measurement using FWD
254.45
-
-
Bridge inspection using Mobile Bridge Inspection Unit
1.01
-
-
Road signs inspection using Retro Reflectometer
508.9
-
-
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000) and to be entered by bidder
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements