National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Manipur NHIDCL Tender
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Nhidcl/manipur/ Ae/y-f/nh-202/2020
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHIDC_556694_1Bid Award Id
ViewTender No
NHIDCL/Manipur/ AE/Y-F/NH-202/2020Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Bridge/Structural Engineer
24
-
-
... More
Senior Pavement Specialist
24
-
-
... More
Senior Quality cum Material Expert
24
-
-
... More
Road Safety Expert
24
-
-
... More
Sub-Professional Staff
-
-
-
... More
Survey Engineer
24
-
-
... More
Assistant Quality cum Material Engineer
54
-
-
... More
Lab Technician
24
-
-
... More
Quantity Surveyor
84
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager cum Accountant
84
-
-
... More
Steno cum Computer Operator
84
-
-
... More
Office Boy
84
-
-
... More
Transportation (Fixed Costs)
-
-
-
... More
Innova/scorpio or equivalent (not more than 2 years old) (2 nos during Construction Period), 2*24=48
Rate per month
48
-
-
... More
Innova/scorpio or equivalent (not more than 2 years old) (1 nos during Maintenance period/DLP), 1*60=60
Rate per month
60
-
-
... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
-
-
-
... More
For 12 round trip to Employer's Head Office
12
-
-
... More
For 12 round trip to Employer's regional office.
12
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
... More
During Construction period
24
-
-
... More
During Maintenance /DLP period
60
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
... More
Office Supplies (1*24+1*60)=84
84
-
-
... More
Drafting Supplies (1*24+1*60)=84
84
-
-
... More
Computer Running Costs (1*24+1*60)=84
84
-
-
... More
Domestic and International Communication (1*24+1*60)=84
84
-
-
... More
Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
-
-
-
... More
During Construction period
24
-
-
... More
During Maintenance /DLP period
60
-
-
... More
Reports and Document Printing ( rate as per copy)
-
-
-
... More
Monthly reports
(Design and Construction)
252
-
-
... More
Half yearly Reports
42
-
-
... More
Various others reports as provided in the Concession Agreement such as Completion Report
1
-
-
... More
Road Survey Equipment, Rate per Km
-
-
-
... More
Surface defects detection and roughness measurement using Network Survey Vehicle
340.67
-
-
... More
Pavement strength measurement using FWD
154.85
-
-
... More
Road signs inspection using Retro Reflectometer
340.67
-
-
... More
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements