National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Manipur NHIDCL Tender
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/manipur/ae/ Utt1-yuj3-yuj4/2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NHIDC_800221_1Bid Award Id
ViewTender No
NHIDCL/Manipur/AE/ UTT1-YUJ3-YUJ4/2024Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Bridge/Structural Engineer (1 No.)
28
-
-
... More
Senior Pavement Specialist (1 No.)
24
-
-
... More
Senior Quality Cum Material Expert (1 No.)
24
-
-
... More
Road Safety Expert (1 No.)
12
-
-
... More
Sub-Professional Staff
-
-
-
... More
Survey Engineer, 2 Nos.
52
-
-
... More
Assistant Highway Engineer, (1 No).
84
-
-
... More
CAD Expert, 1 No.
6
-
-
... More
Environmental Engineer, 1 No.
6
-
-
... More
Assistant Bridge Engineer, 1 No.
24
-
-
... More
Assistant Quality cum Material Engineer, 2 Nos.
48
-
-
... More
Electrical Engineer, 1 No.
6
-
-
... More
Quantity Surveyor, 2 Nos.
58
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (1 No)
84
-
-
... More
Accountant Cum Cashier (1 No)
84
-
-
... More
Steno cum Computer operator (1 No)
84
-
-
... More
Office Boy (1 No)
84
-
-
... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
-
-
-
... More
Scorpio or equivalent 4x4 vehicle (not more than 3 years old).
28
-
-
... More
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 no during Maintenance Period.)
108
-
-
... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 24 round trip to Employer's Head Office and 45 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
1
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
... More
Minimum 200 sqm area of office shall be rented.One Office during Construction period should be rented only after the conultaion of ED(P) regarding the location of the same.
24
-
-
... More
Maintenanance Period - One Office should be rented only after the consultation of ED(P) regarding the location of the same.
60
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
-
-
-
... More
During Construction Period
24
-
-
... More
During Maintenance Period
60
-
-
... More
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (5 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-8GB, HDD-1 TB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
-
-
-
... More
During Construction Period
24
-
-
... More
During Maintenance Period
60
-
-
... More
Reports and Document Printing
-
-
-
... More
Monthly reports (Construction and Maintenance)
720
-
-
... More
Half yearly Reports
120
-
-
... More
Various other reports as provided in the Concession Agreement such as Completion Report
18
-
-
... More
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
-
-
-
... More
Surface defects detection and roughness measurement
using Network Survey Vehicle
11
-
-
... More
Pavement strength measurement using FWD
6
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit
11
-
-
... More
Road signs inspection using Retro Reflectometer
11
-
-
... More
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements