National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Manipur NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Consultancy Services
Eprocure
Opening Date4 Oct 2023
Closing Date30 Oct 2023
Tender AmountRefer Documents
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/assam/ae /tamenglong - Mahur Pkg-7 And 8
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NHIDC_774602_1Bid Award Id
ViewTender No
NHIDCL/Assam/AE /Tamenglong - Mahur Pkg-7 and 8 /2Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Bridge /Structural Engineer (1Nos) 1*24+1*12=36
36
-
-
Senior Pavement Specialist (1 No) 1*24=24
24
-
-
Senior Quality cum Material Expert (2 Nos)
(2*24)=48
48
-
-
Road Safety Expert (2 Nos)
1*8=8
8
-
-
Sub-Professional Staff
-
-
-
Survey Engineer (2 Nos)
(2*24+1*8)=56
56
-
-
Assistant Highway Engineer (2 Nos.) 2*24+1*60=108
108
-
-
CAD Expert (1 Nos).1*8+1*4=12
12
-
-
Assistant Bridge Engineer (2 Nos)
(2*24)=48
48
-
-
Assistant Quality cum Material Engineer (2 Nos) 2*24=48
48
-
-
Lab Technician (4 Nos) 4*24=96
96
-
-
Quantity Surveyor (2 No)
(2*24+ 1*8)=56
56
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager (2 No)
(2*24+ 1*60)=108
108
-
-
Accountant cum Cashier (2No)
(2*24+ 1*60)=108
108
-
-
Steno cum Computer Operator (2 No)
(2*24+ 1*60)=108
108
-
-
Office Boy (2 No)
(2*24+ 1*60)=108
108
-
-
Transportation (Fixed Costs)
-
-
-
Bolero or equivalent (not more than 2 years old) (2 nos during Construction Period), 2*24=28
Rate per month
48
-
-
Innova/scorpio or equivalent (not more than 2 years old) (1 nos during Maintenance period/DLP), 1*60=60
Rate per month
60
-
-
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
-
-
-
For round trip to Employer's Head Office
24
-
-
For round trip to Employer's regional office.
24
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
During Construction period (2 Nos) 2*24=48
48
-
-
During Maintenance /DLP period (1 No)
1*60=60
60
-
-
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
Office Supplies during construction period for 1offices
2*24=48
48
-
-
Office Supplies during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Drafting Supplies during construction period for 2 offices
2*24=48
48
-
-
Drafting Supplies during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Computer Running Costs during construction period for 2 offices
2*24=48
48
-
-
Computer Running Costs during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Domestic and International Communication during construction period for 1 offices
2*24=48
48
-
-
Domestic and International Communication during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
-
-
-
During Construction period for 2 nos of offices
2*24=48
48
-
-
During Maintenance /DLP period for 1 no of office
1*60=60
60
-
-
Reports and Document Printing ( rate as per copy)
-
-
-
Monthly reports
(Design and Construction)
504
-
-
Half yearly Reports
84
-
-
Various others reports as provided in the Concession Agreement such as Completion Report
84
-
-
Road Survey Equipment
-
-
-
Surface defects detection and roughness measurement using Network Survey Vehicle
311
-
-
Pavement strength measurement using FWD
156
-
-
Bridge inspection using Mobile Bridge Inspection Unit
7
-
-
Road signs inspection using Retro Reflectometer
311
-
-
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements