Military Engineer Services Tender

View complete overview of Manipur MES Tender

Military Engineer Services - MES Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date3 Sep 2024
Closing Date2 Oct 2024
Tender Amount₹ 30,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
REPAIR/MAINT OF CENTRIFUGAL / SUBMERSIBLE PUMP SETS, MOTORS STARTERS AND CLEANING OF UG SUMPS, STORAGE SUMPS, FILTERS OF WATER SUPPLY INSTALLATIONS AND WATER TESTING AT UPPER LEIMAKHONG, LOWER LEIMAKHONG, CENTRAL SECTOR AND KOIRENGI
Amendment to tender documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (c) Semi under ground sump of capacity 50000 Gallon 3 nos Near Capt Qtr (High Lift Pump House), 01 no KLP Pump House & 01 no at 183 MH. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge

20

-

-

... More
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (d) Semi under ground sump of capacity 25000 Gallon at High Lift pump house-01, KLP pump house-01 (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge

8

-

-

... More
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (e) Semi under ground sump open type of capacity 50000 Gallon at Low Lift Pump house. (Every Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge

11

-

-

... More
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (f) Semi under ground sump open type of capacity 10000 Gallon at Low Lift Pump house. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge

4

-

-

... More
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (h) OHT 50000 Gallon capacity at inf Bn. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge

4

-

-

... More
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (i) OHT 25000 Gallon capacity MH Bn. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge

4

-

-

... More
Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 100HP / 120HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.

1

-

-

... More
Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 60HP / 50HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.

1

-

-

... More
Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 20 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.

2

-

-

... More
Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 15 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.

1

-

-

... More
Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 7.5 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.

1

-

-

... More
Supply only the following spares for pump sets of capacity 120 / 100 HP (Note: Make of spares shall be of the original make of the pump) Make :- Kirloskar/ CG (14.01) Pump Shaft

1

-

-

... More
(14.02) Bronze impeller 1st stage

1

-

-

... More
(14.04) Wear ring Bronze

1

-

-

... More
(14.05) Inter stage ring Bronze

1

-

-

... More
(14.06) Water deflector rubber

1

-

-

... More
(14.07 ) Bearing cartridge cast iron drive end

1

-

-

... More
(14.08 ) Bearing cartridge cast iron non drive end

1

-

-

... More
(14.09) Shaft sleeve bronze drive end

1

-

-

... More
(14.10) Shaft sleeve bronze non drive end

1

-

-

... More
(14.11) Spacer sleeve drive end

1

-

-

... More
(14.12) Spacer sleeve non drive end

1

-

-

... More
(14.13) Key for impeller and sleeve

1

-

-

... More
(14.14) Bearing lock nut

1

-

-

... More
(14.15) Stuffing box bush

1

-

-

... More
(14.16) O' ring for shaft sleeve

1

-

-

... More
(14.17) Cast iron gland (Set of 2 halves)

1

-

-

... More
(14.18) Eye bolt for gland with nut and washer

1

-

-

... More
(14.19) Gland guide bush large

1

-

-

... More
(14.20) Gland guide bush small

1

-

-

... More
(14.21) Center link bush

1

-

-

... More
(14.22)Check nut

1

-

-

... More
(14.23) Shaft Pulley

1

-

-

... More
Supply only the following spares for pump sets of capacity 60HP / 50 HP (Note: Make of spares shall be of the original make of the pump) Make :- Kirloskar/ CG (38.01) Pump Shaft

1

-

-

... More
(38.02) Bronze Impeller 1st stage

1

-

-

... More
(38.03) wear ring Bronze

1

-

-

... More
(38.04) Inner stage ring Bronze

1

-

-

... More
(38.05) Water deflector rubber

1

-

-

... More
(38.06) Bearing cartridge cast iron drive end

1

-

-

... More
(38.07) Bearing cartridge cast iron non drive end

1

-

-

... More
(38.08) Shaft sleeve bronze drive end

1

-

-

... More
(38.09) Shaft sleeve bronze non drive end

1

-

-

... More
(38.09) Spacer sleeve drive end

1

-

-

... More
(38.10) Spacer sleeve non drive end

1

-

-

... More
(38.11) Key for impeller and sleeve

1

-

-

... More
(38.12) Bearing lock nut

1

-

-

... More
(38.13) Stuffing box bush

1

-

-

... More
(38.14) O' ring for shaft sleeve

1

-

-

... More
(38.15) Cast iron gland (Set of 2 halves)

1

-

-

... More
(38.16) Eye bolt for gland with nut and washer

1

-

-

... More
(38.17) Gland guide bush large

1

-

-

... More
(38.18) Gland guide bush small

1

-

-

... More
(38.19) Center link bush

1

-

-

... More
(38.20) Check nut

1

-

-

... More
(38.21) Shaft Pulley

1

-

-

... More
Supply only the following spares for pump sets of capacity 20HP / 15 HP (Note: Make of spares shall be of the original make of the pump) Make :- Kirloskar/ CG (38.01) Pump Shaft

1

-

-

... More
(38.02) Impeller

1

-

-

... More
(38.03) Casing wear ring

1

-

-

... More
(38.04) Casing cover

1

-

-

... More
(38.05) Lantern ring

1

-

-

... More
(38.06) Gland collar

1

-

-

... More
(38.07) Liquid deflector

1

-

-

... More
(38.08) Bearing housing

1

-

-

... More
(38.09) Support foot

1

-

-

... More
(38.10) Bearing cover

1

-

-

... More
(38.11) Shaft sleeve

1

-

-

... More
(38.12) Key for impeller

1

-

-

... More
(38.13) Key for coupling

1

-

-

... More
(38.14) Impeller nut

1

-

-

... More
(38.15) Washer for impeller

1

-

-

... More
(38.16) Gland packing

1

-

-

... More
(38.17) Grease Nipple

1

-

-

... More
(38.18) Gasket for casing cover

1

-

-

... More
(38.19) Gasket for shaft sleeve and shaft

1

-

-

... More
(38.20) O' ring for sleeves & impeller

1

-

-

... More
(38.21) Tie rod

1

-

-

... More
Supply only the following spares for pump sets of capacity 7.5 HP (Note: Make of spares shall be of the original make of the pump) Make :- Kirloskar/ CG (60.01) Pump Shaft

1

-

-

... More
(60.01) Impeller

1

-

-

... More
(60.02) Rotor

1

-

-

... More
(60.03) Spacer

1

-

-

... More
(60.04) Gland Collar

1

-

-

... More
(60.05) Lantern ring

1

-

-

... More
(60.06) Water deflector

1

-

-

... More
(60.07) Shaft Sleeve

1

-

-

... More
(60.08) Key for impeller

1

-

-

... More
(60.09) Gland packing

1

-

-

... More
(60.10) Priming plug

1

-

-

... More
(60.11) Washer for impeller nut

1

-

-

... More
(60.12) Gasket for casing cover

1

-

-

... More
(60.13) Split cotter Pin

1

-

-

... More
Supply only Ball bearing / Roller bearing for the following pumpsets: Pump Capacity 120HP / 100HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only Ball bearing / Roller bearing for the following pumpsets: Pump Capacity 60HP / 50HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only Ball bearing / Roller bearing for the following pumpsets: Pump Capacity 20HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only Ball bearing / Roller bearing for the following pumpsets: Pump Capacity 15HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only Ball bearing / Roller bearing for the following pumpsets: Pump Capacity 7.5HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only drive end bearing for the following pumpsets: Pump Capacity Pump Capacity 120HP / 100HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only drive end bearing for the following pumpsets: Pump Capacity Pump Capacity 60HP / 50HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only drive end bearing for the following pumpsets: Pump Capacity Pump Capacity 20HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only drive end bearing for the following pumpsets: Pump Capacity Pump Capacity 15HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only drive end bearing for the following pumpsets: Pump Capacity Pump Capacity 7.5HP (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 100HP / 120HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

1

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 60HP / 50HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

3

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 20HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

2

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 15HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

1

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 7.5HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

1

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 5HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

1

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 3HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

1

-

-

... More
Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 1HP Note : (i) The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii) The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii) The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back. (v) The cost of spares for pump considered separately under appropriate items here-in-after.

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric motor, 3 phase 120HP / 100HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric motor, 3 phase 60HP / 50HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric motor, 20 HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric motor, 15 HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric open well submersibile, 15HP / 20 HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Submersible Electric motor, 7.5 HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric motor, 5 HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric motor, 3 HP capacity

1

-

-

... More
Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelled copper winding wire complete including varnishing and heating all as specified and directed of the following sizes: (a) Electric motor, 1 HP capacity

1

-

-

... More
Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor. Electric motor, 3 phase 120 HP / 100 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor. Electric motor, 3 phase 60 HP / 50 HP HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor. Electric motor, 3 phase 20 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor. Electric motor, 15 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor. Electric motor, 7.5 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor. Electric Submersible motor, 5 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor. Electric motor, 3 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing ( Drive end bearing) for the following electric motor. Electric motor, 120 HP / 100 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing ( Drive end bearing) for the following electric motor. Electric motor, 60 HP / 50 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing ( Drive end bearing) for the following electric motor. Electric motor, 20 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing ( Drive end bearing) for the following electric motor. Electric motor, 15 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing ( Drive end bearing) for the following electric motor. Electric motor, 7.5 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
Supply only ball bearing/ roller bearing ( Drive end bearing) for the following electric motor. Electric motor, 5 HP capacity (Make: SKF/FAG/Rolon/NRB)

1

-

-

... More
S&F rubber star coupling high speed suitable for centrifugal pumpset (5 HP to 10 HP)

1

-

-

... More
S&F rubber star coupling high speed suitable for centrifugal pumpset (15 HP to 20 HP)

1

-

-

... More
S&F rubber star coupling high speed suitable for centrifugal pumpset (30 HP)

1

-

-

... More
S&F rubber star coupling high speed suitable for centrifugal pumpset (50/60 HP)

1

-

-

... More
S&F rubber star coupling high speed suitable for centrifugal pumpset (100/120 HP)

1

-

-

... More
S&F rubber tyre coupling high speed suitable for centrifugal pumpset (up to 50/60 HP)

1

-

-

... More
S&F rubber tyre coupling high speed suitable for centrifugal pumpset (up to 100/120 HP)

1

-

-

... More
S&F gallon dori of any size suitable for centrifugal pumpset

1

-

-

... More
M & L for painting of pump set of capacity up to 120HP, including connected starter inside pump house with two coats of anti corrosive synthetic enamel paint over a coat of red oxide primer as per existing colour after preparation of old painted surfaces complete all as specified and directed.

10

-

-

... More
Testing of water for potability test by chemical and bacteriological from any Govt. laboratory such as PH value, Total dissolved solids, hardness as CaCOᶟ, Calcium, Magnesium, Chlorides, Sulphates, Nitrate, Alkalinity, Iron, Turbidity NTU, Mineral oil, Colur hazen units, Taste, Odour, Residual free Chlorine, Total Coliform per 100ml (Microbiologocal test) & E Coli per 100ml (Microbiological test) complete and report to be submitted to the department in triplicate in hard bound copy complete all as specified and as directed

12

-

-

... More
M&L for serviceing / cleaning of RO plant of capacity 60 ltr per hour including replacement of all filter candle complete all as specified and as directed.

10

-

-

... More
S&F inrelacement damaged/burnt 10 sqmm single core copper cable complete all as spcified and directed by Engr-in-Charge.

100

-

-

... More
Supply Only Sodium Hypochloride complete all as specified directed

1000

-

-

... More
Supply Only Alum (crystel type) complete all as specified directed

700

-

-

... More
Supply and fix in replacement relay for pressure pump of any size and capacity complete all as specified directed

1

-

-

... More
S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 100 HP/120 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves

1

-

-

... More
S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 60/50 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves

1

-

-

... More
S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 20/15 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves

1

-

-

... More
S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 10 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves

1

-

-

... More
S&F in repair DOL starter in sheet enclosure suitable for 7.5 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves

1

-

-

... More
S&F in repair 3 pole Power Contractorss -Type MNX , Conforms to IS /IEC 60947-4-1& IEC 60947-4-1, Click fit type consuction up to 40a, MNX 140/150 Complete all as specified and directed.

1

-

-

... More
S&F in repair for 3 pole Power Contractorss -Type MNX , Conforms to IS /IEC 60947-4-1& IEC 60947-4-1, Click fit type consuction up to 40a, MNX 110/115 Complete all as specified and directed.

1

-

-

... More
S&F in repairs cast iron flanged type foot valve 200mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainer complete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)

1

-

-

... More
S&F in repairs cast iron flanged type foot valve 150mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainer complete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)

1

-

-

... More
S&F in repairs cast iron flanged type foot valve 100mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainer complete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)

1

-

-

... More
S&F in repairs cast iron flanged type foot valve 80mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainer complete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)

1

-

-

... More
S&F in repairs cast iron flanged type foot valve 50mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainer complete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.