Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Western Railway

  • Opening Date

    18 Jul 2019

  • Closing Date

    19 Aug 2019

  • Tender Amount

    ₹ 28,21,19,487

  • EMD

    ₹ 15,60,600

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Tender for Earthwork In Filling In Embankment, Guide Bunds, etc

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

DY CE BRIDGE DADAR acting for and on behalf of The President of India invites E-Tenders against Tender No DYCE-B-DDR-2019- 29R Closing Date/Time 19/08/2019 15:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work Vaitarana- Proposed additional span of 18 meter (3 Nos) along with guide bund on the north side East/west approaches of bridge no.92.(On Virar- Surat section)(Two packet system). Bidding type Normal Tender Tender Type Open Bidding System Two Packet System Tender Closing Date Time 19/08/2019 15:00 Date Time Of Uploading Tender 18/07/2019 13:21 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 282119487.61 Tendering Section MUMBAI Bidding Style Single Rate for Each Schedule Item Bidding Unit Earnest Money (Rs.) 1560600.00 Validity of Offer ( Days) 60 Tender Doc. Cost (Rs.) 10000.00 Period of Completion 18 Months Contract Type Works Contract Category Expenditure Bidding Start Date 05/08/2019 Are Joint Venture (JV) firms allowed to bid Yes Ranking Order For Bids Lowest to Highest Expenditure Type Capital (Works) 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A-Description of items 14269832.05 1 013120 20000.00 cum 129.35 2587000.00 130.00 5950100.00 Above/ Below/Par Item Description:- Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, rain bunds if provided, platforms etc. with earth excavated from outside railway boundary entirely arranged by the contractor at his own cost as per RDSO's latest guidelines and specifications and special condition of contract including all leads, royalty, lifts, ascents, descents, crossing of nallahs or any other obstructions. The rates shall include all dressing of bank to final profile, demarcation and setting out of profile, site clearance, removing of shrubs, roots of vegetations growth, heavy grass, benching of existing slope of old bank, all handling/re-handling. taxes, octroi and royalty etc. as a complete job. Cut trees shall be property of railways and to be deposited in the railway godown unless specified otherwise in the Special conditions of contract 2 013130 20000.00 cum 13.30 266000.00 130.00 611800.00 Above/ Below/Par Item Description:- Extra for mechanical compaction of earth/blanketing material filled in embankment with contractor's rollers of suitable capacity, type and size to achieve specified density as per specification, testing as per IS codes incl. cost of water, T&P consumable material and all labour as a complete job. The work is to be executed as per Latest edition of "Guidelines for Earthwork in Railway Projects" issued by RDSO, Lucknow 3 043011 895.00 cum 2430.31 2175127.45 130.00 5002793.14 Above/ Below/Par Item Description:- Providing, hoisting and fixing in position upto floor two level M20 Grade precast RCC work including setting in cement mortar 1:3 (1 cement : 3 coarse sand) and finishing smooth with 6mm thick cement plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete including cost of centering, shuttering, finishing, Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability, excluding cost of cement and steel reinforcement, as per approved plan & direction of Engineer incharge. In string courses, bands, coping, bed plates, anchor blocks, plain window sills, and the like 4 048100 92.00 Each 59.24 5450.08 130.00 12535.18 Abov

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.