Western Coalfields Limited Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Western Coalfields Limited - WCL Tender
Civil And Construction
Excavation
Eprocure
Opening Date5 Jun 2023
Closing Date15 Jun 2023
Tender Amount₹ 6,80,000
Costs
EMD
₹ 8,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WCL_280869_4Bid Award Id
ViewTender No
wn4650-civ-e009-2023-24 dt.03.06.2023Tender Authority
Western Coalfields Limited ViewPurchaser Address
-Website
http://http://www.westerncoal.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying in position specified grade of reinforced
cement concrete, excluding the cost of centering,
shuttering, finishing and reinforcement- All work up to
plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from
natural sources: 3 graded stone aggregate 20 mm nominal
size derived from natural sources).
21.32
-
-
... More
Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. above plinth level up to floor five level, excluding
cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from
natural sources : 3 graded stone aggregate 20 mm nominal
size derived from natural sources).
4.85
-
-
... More
Centering and shuttering including strutting, propping etc.
and removal of form for Foundations, footings, bases of columns, etc. for mass
concrete
18
-
-
... More
Centering and shuttering including strutting, propping etc.
and removal of form for Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.
64.68
-
-
... More
Centering and shuttering including strutting, propping etc.
and removal of form for Suspended floors, roofs, landings, balconies and access
platform
2.49
-
-
... More
Reinforced cement concrete work in beams, suspended
floors, roofs having slope up to 15° landings, balconies,
shelves, chajjas, lintels, bands, plain window sills, staircases
and spiral stair cases above plinth level up to floor five level,
excluding the cost of centering, shuttering, finishing and
reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand
(zone-III)derived from natural sources: 3 graded stone
aggregate 20 mm nominal size derived from natural
sources).
1.29
-
-
... More
Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or
more.
1258.45
-
-
... More
Providing and fixing mild steel round holding down bolts
with nuts and washer plates complete.
603.28
-
-
... More
Structural steel work riveted, bolted or welded in built up
sections, trusses and framed work, including cutting,
hoisting, fixing in position and applying a priming coat of
approved steel primer all complete.
656
-
-
... More
Filling available excavated earth (excluding rock) in trenches,
plinth, sides of foundations etc. in layers not exceeding
20cm in depth, consolidating each deposited layer by
ramming and watering, lead up to 50 m and lift upto 1.5 m.
18.66
-
-
... More
Carrage of material including loading and unloading. Murrum, Building Rbish, Earth Lead 1 KM
15.09
-
-
... More
Finishing walls with water proofing cement paint of
required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
68.58
-
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements