Western Coalfields Limited Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Western Coalfields Limited - WCL Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date31 Dec 2018
Closing Date17 Jan 2019
Tender Amount₹ 8,28,466 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position specified grade of cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : *1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

2.05

-

-

... More
Steel work in built up tubular (round,square or rectangular hollow tubes etc.) trusses etc. including cutting, hoisting fixing in position & applying a priming coat of approved steel primer, including welding & bolted with special shaped washers etc. all complete HOt finished welded type tubes:

2865

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:

2545

-

-

... More
Providing & fixing mild steel round holding down bolts with nuts & washers plates etc. complete

56

-

-

... More
Providing & fixing bolts with nuts & washers etc. complete

18

-

-

... More
Providing & fixing plain lining with necessary screws/nuts & bolts/nails including a coat of approved primer on one face & fixed on wooden/ steel frame work complete as per EIC (Frame work shall be paid separately) 12mm thick commercial ply confirming to IS:1328 BWR type

3.75

-

-

... More
Painting of new structural steel work in two or more coats (but excluding the one coat of priming) of enamel paint of approved brand of of any shade as required & directed including cleaning the surface of all dirt & dust etc. all complete as per instruction of EIC

5.41

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. * All kinds of soil

3.24

-

-

... More
Providing and laying in position specified grade of cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : *1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

4.54

-

-

... More
Centring and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete.

8.64

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

12.88

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: * 1:3:6 ( 1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

5.33

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:

1650

-

-

... More
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50mm +/- 5% total coated thickness (TCT) Zinc coating 120gms as per IS: 277 in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester rop coat 15-18 microns, sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation and should be supplied in single length upto 12metre or as directed by Engineer-in-charge. The sheet shall be fixed using self drilling / self tapping screws of size ( 5.5 x 55mm ) with EPDM seal or with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and GI limpet washers or with GI limpet washers filled with white lead complete upto any pitch in horizontal / vertical or curved surfaces excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.

145

-

-

... More
Painting of new structural steel work in two or more coats (but excluding the one coat of priming) of enamel paint of approved brand of of any shade as required & directed including cleaning the surface of all dirt & dust etc. all complete as per instruction of EIC

1.65

-

-

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.