Tata Memorial Centre Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Tata Memorial Centre Tender
Eprocure
Opening Date12 Nov 2024
Closing Soon2 Dec 2024
Tender Amount₹ 55,00,000
Costs
EMD
₹ 1,10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Supply, Installation, Testing And Commissioning Of Gas Distribution System For Cgmp Centre Of Cellular Immunotherapies At Actrec
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TMC_834552_1Tender No
ET-105/GAS distribution system for CGMP/2024Tender Authority
Tata Memorial Centre ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
SITC of Indoor Fully Automatic 2 source (HPxHP) conforming to NFPA 99, to give flow of CO2 gas & minimum input to panel at HP-175 psig 4 cylinder LHS HP cylinder Manifold as Primary & 4 cylinder RHS HP as Secondary source. It shall be complete with source cut off & check valve,pressure gauge, presure switch, pressure transducer, first level diaphragm regulator, line diaphragm regulator with gauge, line shut off valve, relief valve, vent valve, LED for Use-Ready-Empty etc. complete prewired & prepiped, dry contacts for wiring to Central Alarm Panel
1
-
-
Supply, Installation, Hook up, Testing , Commissioning Zone Alarm Panel Touch screen NFPA 99 compliant, located in each wing of each floor, to give view of services of a). Co2 b). O2 c) N2. The factory shall be panel shall be NFPA 99 compliant, floor mounted mounted in corrosion proof enclosure. The gas labels shall colour coded by gas type-service parameter-unit - Normal/Alarm (Lo&Hi)-Location. Panel indicators shall be Power On & Normal, System Fault warning, Each self test, Mute for 80 dBA Audible & Visual alarm, field programmable & readily connectible to Central Alarm Panel through 4-20mA/Potential free contacts.
-
-
-
3 gas
2
-
-
Supply/ Installation/ Testing/ Commissioing of Medical Gas Distribution Zone / Area Valve Box, NFPA 99 compliant, for local isolation of service distributors on floor, factory made in corrosion proof enclosure with hinged temper proof door in 18 swg 1 coat of surface tolerant primer & 2 coat of polyurathene with marine grade heat resistance thickness having opaque door with pull ring & gauge window complete with gas labels, Piping, pressure/ vacuum gauges and Valves.
-
-
-
3 gas
8
-
-
SITC of SINGLE STAGE GAS PURIFICATION CONTROL PANEL FOR CO2,O2 & N2GAS.
Which consist of:
1. Moisture Trap: - 50:50% Molecular Sieve & Silica Gel.
2. Hydrocabon Trap: - Activated Charcoal
3. Pressure Regulators
4. Pressure Gauges: 10.6 KG/CM2 -
5. On/off Toggle valves etc. 1/8” ALL FITTINGS or as per requirement.
with all necessary hardware, supperts etc as per instructed and as directed by OIC-ES.
24
-
-
SITC of CONTROL BOX WITH PRESSURE GAUGE, TOGGLE VALVE AND PRESSURE REGULATOR FOR
N2, O2 and CO2 gases with all necessary hardware, supperts etc as perinstructed and as directed by OIC-ES. NoTE:- PVC flexible tube with brass nozzle for Connection to the units should be included. no additional cot given for the same.
126
-
-
Suuply and installation of Cylinder Mounting powder coated Bracket with SS chain
With SS BRACKET with all necessary hardware, supperts etc as per instructed and as directed by OIC-ES.
20
-
-
Supply, Installation, Testing, Commissioing of SS 304 Seamless pipe as per EN 10216-5 / ISO 9626 Gas distribution piping larger sizes in ready made built up trenches as per applicable standard, open execution on internal / external walls, in vertical shafts, above false ceilings as also inside removable trunking, in walls by chasing cutting compelete with factory made fittings such as tee/ elbow/ crossover/ wall sleeves etc., complete with vertical & horizontal supports and termination at both ends, colour coded painting etc.
-
-
-
12mm ID x 0.9 mm thick
50
-
-
15 mm ID x 1.2 mm thick
300
-
-
22mm ID x 1.2 mm thick
600
-
-
28 mm ID x 1.2 mm thick
400
-
-
35 mm ID x 1.2 mm thick
50
-
-
35 mm ID x 1.2 mm thick
80
-
-
Supply, Installation, Testing, Commissioing of SS isolation valve ISO 17292 with all necessary hardware, supperts etc as per instructed and as directed by OIC-ES.
-
-
-
15mm
6
-
-
22mm
6
-
-
28mm
6
-
-
MGPS consultancy charges alongwith provsion of co-ordinated drawings with civil and MEP for complete design for MGPS system and vetting of BOQ and monitoring the work and issuance of final completion of project as per the requirement of CGMP.
1
-
-
SITC of Vertical outlet panel which will be sandwiched between two puff panels at specified locations. The thickness of the panel will be 80 mm. Flushed and seamless from the external surface. The vertical panel will be made of aluminum extrusion. The vertical length will be measured in a running meter. Any grooves or joints generated should be treated and flushed by the contractor which will maintain the iso CLASS 7 rooms. As per instruction of engineer in charge.
200
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%