Soil And Water Conservation Department Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Soil And Water Conservation Department Tender
Eprocure
Opening Date28 May 2018
Closing Date29 Jun 2018
Tender Amount₹ 67,69,232 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 60,210Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_SSIP_320888_2Bid Award Id
ViewTender No
Tender_Notice_No_02_2018_19Tender Authority
Soil And Water Conservation Department ViewPurchaser Address
-Website
http://https://waterconserve.maharashtra.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in Hard Rock of all toughness by blasting including boulders above 0.6 m diameter (0.113cum) minimizing damages to side slopes of excavation in water prism area by adopting any one of the combination of line drilling/presplitting/smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all material ,machinery, labour ,leveling bed etc complete with leads up to 15 m. and lift 6 m.
406.085
-
250.3
... More
Providing & laying in situ cement concrete grade M15 (40MSA)of trap/granite/quartzite/graded metal for PCC with or without surface reinforcement/RCC concreting requiring heavy type of shuttering for works of gallery sluices, spillway crest, spillway downstream face, energy disciplitting structures, intake structures, training walls, piers, abutments etc. with concrete Mixer considering lead of 56m. with shuttering. And scaffolding, placing, compaction & curing (MSA 40 mm) with all leads & lifts etc complete.
1107.767
-
3734.44
... More
Providing & laying in situ cement concrete grade M15 (20MSA) of trap/granite/quartzite/graded metal for PCC with or without surface reinforcement/RCC concreting requiring heavy type of shuttering for works of gallery sluices, spillway crest, spillway downstream face, energy disciplitting structures, intake structures, training walls, piers, abutments etc. with concrete Mixer considering lead of 50 m. with shuttering and scaffolding, placing, compaction & curing (MSA 40 mm) with all leads & lifts etc complete.
22.75
-
3856.5
... More
Providing reinforcement for RCC works with M.S./H.Y.S.D./TMT bars including cutting, bending & placing at proper places etc complete with initial lead of 50m & lift1.5m etc complete.
8.512
-
40384.31
... More
Compaction of embankment of guide bund with selected material from borrow area including transporting the material up to lead of 15m &lift uptol.5m, laying in layers ,Leveling ,spreading, breaking clods including watering, consolidations etc. complete. From Available Material.
1980
-
31.3
... More
providing & laying M.S. channel of size 100x80x60 mm. Including keeping in position with help of M.S. bars welded to the channel 30 cm. Etc. staggered including welding, transporting material with all leads and lifts.
109.8
-
475.2
... More
Manufacturing with QAP & fabrication of K.T.Weir needle gate Straight type of size including painting including fabricating, transporting material with all leads and lifts etc. Complete
6.204
-
74768.9
... More
providing & fixing in position Notice Board to work site including oil painting, lettering etc. complete
1
-
5000
... More
Dewatering During Execution of Work is 3% on Cost of Work up to Riverbed Level .
0.03
-
2681266.67
... More
Nalla deepenng
5400
-
27
... More
Royalty Charges
3506.2
-
141.34
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements