Rural Development Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Rural Development Department - RDD Tender

Works
Eprocure
Opening Date4 Feb 2020
Closing Date19 Feb 2020
Tender Amount₹ 5,99,363 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Royalty Charges : Supply of Rubble, Murum, soil, 60mm/40mm. metal (hand broken), royalty charges are not included in the rates. (As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No. 67 Dt. 15 May, 2015. States that the Royalty charges of Rs. 141.34 / cum) are considered. The surcharge levied on Royalty shall also be payable to the contractor.

37.66

-

141.34

... More
For Sand add Surcharge 2%

18.86

-

2.82

... More
Add 10% D.M.F. On Sand

18.86

-

14.13

... More
For other MInarals Add 2% Surcharge

18.8

-

2.82

... More
Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by vigilance & quality control, circle, for the current year and shall form part of tender testing of material by quality control and certified quality must be use by contractors. Sieve Analysis

1

-

650

... More
Compressive Strength of Cement Concrete Cubes

1

-

650

... More
ADD 12 % GST B) A.SATHE NAGAR

1

-

31173.36

... More
ADD 1 % FOR LABOUR INSURANCE

1

-

2597.78

... More
B) AMBEDKAR NAGAR Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). As directed by Engineer-in-charge

30.15

-

1069.32

... More
Supplying crusher broken 6mm of trap/granite/quartzite/gneiss stone metal at the road side including conveying and stacking for use in bituminous road surface work etc complete.

10.049

-

1101.03

... More
Spreading 80/40 mm metal for road work including sectioning etc. complete. as directed by Engineer in charge. SSR of 2018-19 Item No. 50.58 page No. 442.

30.15

-

85

... More
Spreading hard murum/ soft murum/ gravel or kankar for side width complete.SSR of 2018-19 Item No. 2.30 Page No. 31

10.049

-

63

... More
Providing and fixing heavy duty inter locking concrete coloured paving blocks of 60 mm thickness of having a strength of 300 kg/sq.cm. of approved quality and shape on a bed of crushed sand of 25 to 30mm thick including skirting joints and cleaning etc. complete. SSR of 2018-19 Item No. 33.51 & page No. 273.

201

-

894.51

... More
Providing and laying Cast in situ/Ready Mix cement concrete in M-15 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, plywood/Steel, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc)

5.632

-

5659.06

... More
Royalty Charges : Supply of Rubble, Murum, soil, 60mm/40mm. metal (hand broken), royalty charges are not included in the rates. (As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No. 67 Dt. 15 May, 2015. States that the Royalty charges of Rs. 141.34 / cum) are considered. The surcharge levied on Royalty shall also be payable to the contractor.

32.628

-

141.34

... More
For Sand add Surcharge 2%

2.478

-

2.82

... More
Add 10% D.M.F. On Sand

2.478

-

14.13

... More
For other MInarals Add 2% Surcharge

30.15

-

2.82

... More
Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by vigilance & quality control, circle, for the current year and shall form part of tender testing of material by quality control and certified quality must be use by contractors. (Compressive strength of C.C. Cube (Set of 3 cubes) Compressive Strength of Cement Concrete Cubes

1

-

2350

... More
ADD 12 % GST B) AMBEDKAR NAGAR

1

-

30980

... More
ADD 1 % FOR LABOUR INSURANCE

1

-

2582



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.