Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

CA NO CEPZ/MUM/TOKEN-27 OF 2018-19 SERIAL PAGE NO. 155 YARDSTICK LT SUB STN BLDG Sl. No. 01 of Sch ‘A’ Part-1 Ser No Description of items Yard stick % 1 Excavation and earthwork incl PCC in fdn ,ATT complete 2.00 2 Rcc coloumn footing, formwork & reinforcement 4.00 3 RCC M-30 design mix as in column incl formwork and reinforcement complete 12.50 4 RCC M-30 design mix as in lintel chajjah incl formwork and reinforcement complete 1.50 5 RCC M-30 design mix as in PB/tie beam incl formwork and reinforcement complete 9.50 6 RCC M-30 design mix as in roof beam and slab incl formwork and reinforcement complete 14.00 7 Rcc M-30 design mix as in RCC duct incl formwork and reinforcement complete 8 mm thick chequred plate cover 11.50 8 Pre cast cement concrete block mesonary 14.50 9 Internal & external plastering complete 5.50 10 Water proofing treatment complete 6.50 11 Flooring,(soling , subbase & PCC 1:2:4) 4.50 12 Joineries(rolling shutters, ventilators& windows) 6.25 13 Internal & external painting complete 2.25 14 Misc items, incl plinth protection ,RCC ramp, including site clearance 5.50 TOTAL 100% Asst Dir (Contracts) (Signature of Contractor) For Accepting Officer Dated : ____________ CA NO CEPZ/MUM/TOKEN-27 OF 2018-19 SERIAL PAGE NO. 156 YARDSTICK PUMP HOUSE Sl. No. 02 of Sch ‘A’ Part-1 Ser No Description of item Yardstick (%) 1 Excavation ,earthwork,lean concrete& ATT complete 4.5% 2 RCC coloumn,footing,formwork& reinforcement 7.0% 3 RCC column incl formwork & reinforcement 13.00% 4 RCC M- 30 design mix as in lintel chajjas incl formwork, & reinforcement 5.00% 5 M&L M-30 Design mix as in plinth beam incl formwork& reinforcement 6.00% 6 M&l m-30 design mix as in roof beam& slab 20.00% 7 Pre cast cement concrete block mesonary 13.50% 8 Internal /external plastering complete 5.5% 9 Internal /external painting complete 2.00% 10 Flooring incl soling sub base & flooring 4.50% 11 Joineries complete 9.50% 12 Misc. items incl plinth protection & site clearance 5.50% 13 Roof treatment 4.00% TOTAL 100% Asst Dir (Contracts) (Signature of Contractor) For Accepting Officer Dated : ____________ CA NO CEPZ/MUM/TOKEN-27 OF 2018-19 SERIAL PAGE NO.157 YARDSTICK UG SUMP OF CAPACITY -100 Cum Sl. No. 03 of Sch ‘A’ Part-1 Ser No Description of item Yardstick 1 Excavation, earth work & lean concrete 12.50 % 2 Design Mix M 30 as in beam , form work & RCC Infra 7.50% 3 Design Mix M30 as in roof slab, form work & reinforcement 12.50% 4 Design Mix as in wall, form work & reinforcement 37.50% 5 Design mix as in RCC slab, form work& reinforcement 17.50% 6 Retaining filling ,removal of surplus soil & plinth protection 7.50% 7 Misc. items & site clearance 5.00% TOTAL 100% Asst Dir (Contracts) (Signature of Contractor) For Accepting Officer Dated : ____________

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.