Military Engineer Services Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Military Engineer Services - MES Tender

Works
Furnitures and Fixtures
Eprocure
Opening Date13 Jan 2022
Closing Date12 Feb 2022
Tender Amount₹ 39,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(c) Removing the unserviceable shelf and S & F new shelf in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

110

-

-

... More
(d) Removing the unserviceable cleat for shelf in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

220

-

-

... More
(e) Removing the unserviceable hinge and S & F new hinge in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

110

-

-

... More
(f) Removing the unserviceable shutters left/right sheet and S & F new shutters left/right in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

55

-

-

... More
(g) Removing the unserviceable handle and S & F new handle in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

130

-

-

... More
(h) Removing the unserviceable locks and S & F new locks in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

130

-

-

... More
(j) Removing the unserviceable locking vertical rod complete assembly and S & F new locking vertical rod complete assembly in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

130

-

-

... More
(k) Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of red oxide primer with spray machine in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed.

135

-

-

... More
(l) M & L for repairs of dents on steel surfaces of furniture complete all as specified and as directed.

550

-

-

... More
(II) Almirah Medium Steel with four shelf : DRG NO FD-1032

-

-

-

... More
(a) Removing the unserviceable leg and S & F new leg in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

60

-

-

... More
(b) Removing the unserviceable shelf and S & F new shelf in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

80

-

-

... More
(c) Removing the unserviceable cleat for shelf and S & F new shelf in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

155

-

-

... More
(d) Removing the unserviceable hinge and S & F new hinge in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

110

-

-

... More
(e) Removing the unserviceable shutters left/right sheet and S & F new shutters left/right sheet in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

55

-

-

... More
(f) Removing the unserviceable handle and S & F new handle in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

130

-

-

... More
(g) Removing the unserviceable locks and S & F new locks in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

130

-

-

... More
(h) Removing the unserviceable locking vertical rod complete assembly and S & F new locking vertical rod complete assembly in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

130

-

-

... More
(j) Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of red oxide primer with spray machine in the furniture (Almirah small/medium steel) as per drawing No FD-1032 complete all as specifed and as directed.

130

-

-

... More
(III) Locker Steel with four shelf : DRG NO FD-1029

-

-

-

... More
(a) Removing the unserviceable leg and S & F new leg in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.

35

-

-

... More
(b) Removing the unserviceable shelf and S & F new shelf in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.

35

-

-

... More
(c) Removing the unserviceable cleat for shelf and S & F new cleat for shelf in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.

120

-

-

... More
(d) Removing the unserviceable conduit pipe and S&F new conduit pipe in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.

25

-

-

... More
(e) Removing the unserviceable handle and S & F new handle in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.

70

-

-

... More
(f) Removing the unserviceable hasp & staple and S & F new hasp and staple in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.

70

-

-

... More
(g) Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of red oxide primer with spray machine in the furniture (locker steel) as per drawing No FD-1029 complete all as specifed and as directed.

120

-

-

... More
(IV) Charpoy steel with hard top : DRG NO FD/MAP-II/01

-

-

-

... More
(a) Removing the unserviceable stiffener and S & F new stiffener in the furniture (charpoy steel hard top) drawing No FD/MAP-II/01 complete all as specified and as directed.

140

-

-

... More
(b) Removing the unserviceable long rail and S&F new long rail in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.

70

-

-

... More
(c) Removing the unserviceable short rail and S&F new short rail in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.

70

-

-

... More
(d) Removing the unserviceable leg and S&F new leg in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.

140

-

-

... More
(e) Removing the unserviceable top ply wood and S&F new top ply wood 12mm thick in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.

180

-

-

... More
(f) Preparing steel or wooden surfaces and applying French polich (glossy finish) to all exposed wooden surfaces and two coats of synthetic enamel paints over one coat of primer including scrapping old paint, sanding, applying putty to steel surfaces in the furniture (charpoy hard top) as per drawing No FD/MAP-II/01 complete all as specified and as directed.

210

-

-

... More
(V) Charpoy GI pipe FD-220/similar pattern

-

-

-

... More
(a) Removing the existing all unserviceable ply from frame of charpoy, Tightening/refixing the serviceable Loose parts of frames. Supply & fixing 1948mm Long x 868mm wide single piece fresh new plywood 12mm thick MR grade Along with flush/countersunk bolt (06 Nos in Qty ) of dia 10mm, length 50mm and bolt top shall be flat and of dia 25mm. Each bolt must consist two cup washers & one nut. Hole on plywood for fixing bolt shall be made at a distance of two inch from centre of long rail, complete all as specified and directed.

450

-

-

... More
(b) Removing the existing all unserviceable all MS cleats and supply and fixing MS cleats of size 60mmx30mmx5mm.

1500

-

-

... More
(c) Removing the existing unserviceable all MS angles, and supply & fixing MS angles of size 25mmx25mm having 5mm thickness and of length 868mm.

280

-

-

... More
(d) Removing the existing unserviceable Niwar from frame of charpoy, Tightening/refixing the serviceable Loose parts of frames. Supply and fixing bright white colour vergin new fresh niwar of 50 mm to 55 mm width, and must be without joints. weight of niwar1.5 Kg per charpoy complete all as specified and directed.

250

-

-

... More
(e) Removing the existing unserveceable long rail from charpoy GI pipe, tightening all loose parts and S&F long rail made of GI pipe 32mm dia medium Grade ISI marked duly threaded both ends and fixing to charpoy complete all as per Drg FD-220/Similar pattern complete all as specified and directed.

80

-

-

... More
(f) Manufacturing of short rail made out of unserveceable long rail , duly threaded both ends and proper fixing in charpoy GI and tightening all loose parts after removing existing unserveceable short rail carefully without damaging/disturbing other parts all as per Drg FD-220/Similar pattern complete all as specified and directed.

160

-

-

... More
(g) Manufacturing of legs made out of unserveceable short rail , duly threaded one end and proper fixing in charpoy GI and tightening all loose parts after removing existing unserveceable Leg rail carefully without damaging/disturbing other parts all as per Drg FD-220/Similar pattern.all as directed.

320

-

-

... More
(h) Removing unserveceable elbow and S&F GI elbow 32 mm bore and tightening all loose parts as per Drg FD-220/Similar pattern all as directed.

380

-

-

... More
(j) Removing unserveceable check nut and S&F GI check nut and tightening all loose parts as per Drg FD-220/Similar pattern all as directed.

820

-

-

... More
(VI) Table 3'x2' steel FD-1008, 1007 similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg

-

-

-

... More
(a) Hard top sheet

70

-

-

... More
(b) Leg

140

-

-

... More
(c) Rubber shoe

140

-

-

... More
(d) Top/Bottom long stifner

110

-

-

... More
(e) Top/Bottom short stifner

110

-

-

... More
(f) Drawer for FD -1008 only

35

-

-

... More
(g) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba and all as directed.

110

-

-

... More
(h) Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed.

150

-

-

... More
(VII) Table 3'x3' steel FD-1009/ similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg

-

-

-

... More
(a) Hard top sheet

50

-

-

... More
(b) Rubber shoe

110

-

-

... More
(c) Leg

110

-

-

... More
(d) Stifner

110

-

-

... More
(e) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba and all as directed.

70

-

-

... More
(f) Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed by BSO

125

-

-

... More
(VIII) Table office clerk steel FD-1004/ similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg

-

-

-

... More
(a) Hard Top sheet

47

-

-

... More
(b) Drawer

75

-

-

... More
(c) Locks

23

-

-

... More
(d) Leg

98

-

-

... More
(e) Top/Bottom long stifner

47

-

-

... More
(f) Top/Bottom short stifner

47

-

-

... More
(g) Rubber shoe

98

-

-

... More
(h) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba and all as directed.

75

-

-

... More
(j) Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed.

150

-

-

... More
(IX) Chair CB steel with arm FD-75/similar pattern, removing the existing unserviceable part and S&F following similar new part as per Drg

-

-

-

... More
(a) Complete seat frame with canning

340

-

-

... More
(b) Complete back frame with canning

340

-

-

... More
(c) Arm rest

340

-

-

... More
(d) Frame for arm rest

340

-

-

... More
(e) Leg

717

-

-

... More
(f) Rubber shoe

680

-

-

... More
(g) S&F MS plate of size 15mm width, 3mm thickness and full length to be welded at centre of seat as support parallel to front/rear rail all as directed.

170

-

-

... More
(h) S&F MS plate of size 15mm width, 3mm thickness and full length to be welded at centre of back as support parallel to front/rear rail all as directed.

170

-

-

... More
(j) Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/MD/OTM buildings under GE (W) Colaba

490

-

-

... More
(k) M&L for spot welding (not exceeding one inch) of steel items including scraping, preparing surface of welded portion, grinding complete all as directed.

1630

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.