Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Military Engineer Services - MES Tender
Civil Works Others
Eprocure
Opening Date3 May 2018
Closing Date29 May 2018
Tender Amount₹ 44,32,800 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,33,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_MES_190793_1Bid Award Id
ViewTender No
8109/CWE (NW) MUMBAI/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
(c) 9th floor to upto and including 12th floor
70
-
-
... More
(d) 13th floor to upto and including 14th floor
25
-
-
... More
Cutting grooves 75mm wide and 65mm deep in brick wall/RCC surfaces at any location shaping harizontal face with mechanical cutter and grooves filled with PCC 1:2:4 type B-0 (using 12.5mm graded stone aggregate) mixed with chemical compound SUPER LATEX OR DR FIXIT OF PIDILITE INDUSTRIES LTD or SBR LATEX of STP LTD mixed with proportion 200ml per 50 Kgs cement as per manufacturers instruction all as specified and directed
-
-
-
... More
(a) Height upto and including 4th floor
115
-
-
... More
(b) 5th floor to upto and including 8th floor
100
-
-
... More
(c) 9th floor to upto and including 12th floor
85
-
-
... More
(d) 13th floor to upto and including 14th floor
30
-
-
... More
Material and labour for filleting in any position and to any shape of section area not exceeding 25 Sqcm in cement sand mortar 1:4 including all mitres, stops etc complete all as specified and directed
-
-
-
... More
(a) Height upto and including 4th floor
115
-
-
... More
(b) 5th floor to upto and including 8th floor
100
-
-
... More
(c) 9th floor to upto and including 12th floor
85
-
-
... More
(d) 13th floor to upto and including 14th floor
30
-
-
... More
Supply and fix MS angle framed for brackets cut to shape drilled and counter sunk for screws including bending welding angles as necessary confirming to FE-410-0 or FE-310-0 brackets shall be fixed with 10mm dia 150mm long (04 Nos each brackets) dash through fastners in concrete or brick work all as specified and directed
-
-
-
... More
(a) Height upto and including 4th floor
500
-
-
... More
(b) 5th floor to upto and including 8th floor
600
-
-
... More
(c) 9th floor to upto and including 12th floor
700
-
-
... More
(d) 13th floor to upto and including 14th floor
300
-
-
... More
Supply and fix rolled section as in purlin cut to shape including welding to angle iron bracket as necessary cleats complete all as specified and directed
-
-
-
... More
(a) Height upto and including 4th floor
300
-
-
... More
(b) 5th floor to upto and including 8th floor
400
-
-
... More
(c) 9th floor to upto and including 12th floor
500
-
-
... More
(d) 13th floor to upto and including 14th floor
100
-
-
... More
Supply and fix wind ties of FI 40 x 6mm fixed with 'J' hook etc complete using FE-290 or E-165
-
-
-
... More
(a) Height upto and including 4th floor
150
-
-
... More
(b) 5th floor to upto and including 8th floor
220
-
-
... More
(c) 9th floor to upto and including 12th floor
280
-
-
... More
(d) 13th floor to upto and including 14th floor
65
-
-
... More
Supply and fix 10mm dia 100mm long dash through fastners bolts in concrete and brick work
-
-
-
... More
(a) Height upto and including 4th floor
130
-
-
... More
(b) 5th floor to upto and including 8th floor
205
-
-
... More
(c) 9th floor to upto and including 12th floor
275
-
-
... More
(d) 13th floor to upto and including 14th floor
40
-
-
... More
Supply and fixing in position pre painted galvanlume sheet aluminium zinc coating GI based corrugated steel sheet 0.50mm thick of any colour as in roof covering/clading to wall, fixed with self tapping screws, having tensile strength of 550 MPA yield strength and zinc (galvanised) + aluminium combined coating of 150 GSm/PM2 (AZ-150) of 50mm TCT having top colour coat of regular modified polyester/silicon modified polyester/HDEP polyester of 18 to 20 micron and back coat of 5 to 7 micron epoxy primer fixes. RMR 1040 profile width 1125mm Note :- The sheets shall be fixed to MS angle with or 'J' hook with including wind ties etc. Wind ties shall be measured seperately all as specified and directed
-
-
-
... More
(a) Height upto and including 4th floor
70
-
-
... More
(b) 5th floor to upto and including 8th floor
80
-
-
... More
(c) 9th floor to upto and including 12th floor
100
-
-
... More
(d) 13th floor to upto and including 14th floor
30
-
-
... More
Chipping removing carefully old broken concrete work by low impact hammer breaker without damaging the structure and cleaning and disposal of debris out side the premises etc complete as directed by Enginee-in-Charge. Hard concrete shall not be removed by force & work is to be carried out without damaging to adjucent elements/structure
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Material and labour for applying the rust remover alkaline in nature having specific gravity 1.1 Kg/Ltr to the existing/additional rebars including wire brushing manually or by mechanical tools, after cleaning the disturbed surface etc complete by draining water. Rust remover shall be procured from one of manufacturer given below (Make :- Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite) Note :- Measurement applicable only on the basis of area of concrete exposed
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Material and labour for applying two coats of anti-rust protective coating in the form of acrylic polymer with a minimum solid content to 40% solids mixed with cement in 1:1:5 proportion (1 part polymer and 1.5 parts cement) on rebars after cleaning of rust scales as per manufacturer's instruction. Ani-rust protective shall be procured from on of manufacturer given below Make :- Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite.
Note :- Measurement applicable only on the basis of area of concrete exposed
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Material and labour for TMT bars 10mm dia and over cut to length bent to shape required including cranking spirally and binding with MS wire (annealed) not less than 0.9mm dia by placing in position new reinforcement bars including tack welding to existing reinforcement bars all complete as specified and as directed
-
-
-
... More
(a) Height upto and including 4th floor
200
-
-
... More
(b) 5th floor to upto and including 8th floor
250
-
-
... More
(c) 9th floor to upto and including 12th floor
350
-
-
... More
(d) 13th floor to upto and including 14th floor
100
-
-
... More
Providing bonding coat of SBR polymer over the exposed steel/welded mesh/concrete in ratio 1:1 to 1:1:5 of polymer complete as directed by the consultant SBR polymer to be procured from one of the manufacturer's given below. Make :- Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite)
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Material and labour for repairing the damaged concrete portion by SBR polymer with a minimum soild content to 40% cement mortar in proportion 1:5:15 i.e (1 part SBR polymer : 5 part OPC cement and 15 parts of graded quartz aggregate) (sand) upto 25mm thickness as directed by the manufacturer's instruction including necessary curing etc, complete all as specified and as directed . SBR polymer shall be procured from one of manufacturer given below. Make :- Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite)
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Material and labour for casting and repairing of excessively damaged menbers with micro concrete at all levels with all leads and lift as directed including mixing, laying, leveling, finishing including curing complete. Grade of micro concrete to be M-40 at 28 days and same shall be procured from one of manufacturer given below.
Make :- Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite)
-
-
-
... More
(a) Height upto and including 4th floor
70
-
-
... More
(b) 5th floor to upto and including 8th floor
9
-
-
... More
(c) 9th floor to upto and including 12th floor
10
-
-
... More
(d) 13th floor to upto and including 14th floor
4
-
-
... More
Material and labour for providing form work of single length to pour the concrete/micro concrete using water proofing film coated ply wood complete all as specified and as directed
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Taking down cement plaster of any description in any positon including racking out joints making key scrubbing down with water etc all complete
-
-
-
... More
(a) Height upto and including 4th floor
840
-
-
... More
(b) 5th floor to upto and including 8th floor
1010
-
-
... More
(c) 9th floor to upto and including 12th floor
1170
-
-
... More
(d) 13th floor to upto and including 14th floor
380
-
-
... More
Material and labour for 20mm thick plastering in two coats 15mm thick backing coat in CM 1:6 and 5mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, safety net etc all complete as directd by Engineer-in-Charge.
(Note :- WPC shall be measured and paid seperately)
-
-
-
... More
(a) Height upto and including 4th floor
740
-
-
... More
(b) 5th floor to upto and including 8th floor
890
-
-
... More
(c) 9th floor to upto and including 12th floor
1040
-
-
... More
(d) 13th floor to upto and including 14th floor
330
-
-
... More
Material and labour for plastering in CM (1:3), 5mm thick finished even and smooth for ceiling complete all as specified and directed by Engineer-in-Charge
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Supply only integral water proofing compound of approved make as per ISI
-
-
-
... More
(a) Height upto and including 4th floor
74
-
-
... More
(b) 5th floor to upto and including 8th floor
89
-
-
... More
(c) 9th floor to upto and including 12th floor
104
-
-
... More
(d) 13th floor to upto and including 14th floor
33
-
-
... More
Material and labour for preparing newly plastered or unplastered surfaces and applying two coats of acrylic based exterior paint over a coat primer and bio wash on wall including necessary scaffolding complete
-
-
-
... More
(a) Height upto and including 4th floor
740
-
-
... More
(b) 5th floor to upto and including 8th floor
890
-
-
... More
(c) 9th floor to upto and including 12th floor
1040
-
-
... More
(d) 13th floor to upto and including 14th floor
330
-
-
... More
Material and labour for preparing new plastered surfaces of ceilings and applying two coats of acrylic base paint exterior grade (100% acrylic) including bio washing etc, complete all as specified.
Note :- Work to be carried out upto 14th floor of wall)
-
-
-
... More
(a) Height upto and including 4th floor
100
-
-
... More
(b) 5th floor to upto and including 8th floor
120
-
-
... More
(c) 9th floor to upto and including 12th floor
130
-
-
... More
(d) 13th floor to upto and including 14th floor
50
-
-
... More
Material and labour preparation of old decorated surfaces of wall including washing and applying two coat of acrylic emulsion paint exterior grade (100% acrylic) over one coat of primer including necessary scaffolding, safety net etc all complete as directed by Engineer-in-Charge
-
-
-
... More
(a) Height upto and including 4th floor
2000
-
-
... More
(b) 5th floor to upto and including 8th floor
2200
-
-
... More
(c) 9th floor to upto and including 12th floor
3000
-
-
... More
(d) 13th floor to upto and including 14th floor
800
-
-
... More
All as per item No 14 above but on ceiling
-
-
-
... More
(a) Height upto and including 4th floor
120
-
-
... More
(b) 5th floor to upto and including 8th floor
140
-
-
... More
(c) 9th floor to upto and including 12th floor
165
-
-
... More
(d) 13th floor to upto and including 14th floor
75
-
-
... More
Material and labour for preparation of new steel surfaces exceeding 10cm width or grith and applying two coats of synthetic enamal paint over a coat of red oxide complete all as specified and as directed
-
-
-
... More
(a) Height upto and including 4th floor
25
-
-
... More
(b) 5th floor to upto and including 8th floor
33
-
-
... More
(c) 9th floor to upto and including 12th floor
40
-
-
... More
(d) 13th floor to upto and including 14th floor
12
-
-
... More
Hacking out broken glass panes of any description from wooden frames fixed with beads not exceeding 0.5 Sqm panes all complete
-
-
-
... More
(a) Height upto and including 4th floor
50
-
-
... More
(b) 5th floor to upto and including 8th floor
65
-
-
... More
(c) 9th floor to upto and including 12th floor
80
-
-
... More
(d) 13th floor to upto and including 14th floor
35
-
-
... More
Supply and fix sheet glass 3mm thick ordinary quality fixed with wooden beads in Sqm not exceeding 0.50 Sqm in each panes
-
-
-
... More
(a) Height upto and including 4th floor
50
-
-
... More
(b) 5th floor to upto and including 8th floor
65
-
-
... More
(c) 9th floor to upto and including 12th floor
80
-
-
... More
(d) 13th floor to upto and including 14th floor
35
-
-
... More
Removing demolished material exceeding 5 Km but not exceeding 15 Km and deposting where directed
-
-
-
... More
(a) Height upto and including 4th floor
20
-
-
... More
(b) 5th floor to upto and including 8th floor
25
-
-
... More
(c) 9th floor to upto and including 12th floor
35
-
-
... More
(d) 13th floor to upto and including 14th floor
Note for all items :- The work is to be carried out upto 14th floor and rate quoted shall be inclusive of steel scaffolding, safety net etc and no additional payment of any kind is admissible
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements