Military Engineer Services Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Military Engineer Services - MES Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Feb 2025
Closing Date13 Mar 2025
Tender Amount₹ 35,00,000
Costs
EMD
₹ 70,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MES_699108_1Tender No
81932/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply & fixing PVC fills of cooling tower 20 to 100 TR as per OEM standard fixing secquance including cutting & filling the gaps so that the water of cooling tower spread equally includng refixing motor, pipe, sprinkler complete all as specified and directed by Engr-in-charge.
2
-
-
... More
M&L for replacement of defective temp sensor of chiller line as per existing make & model complete all as specified & directed by Engr - in- Charge.
20
-
-
... More
M&L for replacmnet of defective temperature controller with sensor including making proper wiring & connections complete all as specified suitable for existing & directed by Engr - in- Charge.
4
-
-
... More
M&L for replacmnet of defective humidity controller with sensor including making proper wiring & connections complete all as specified & directed by Engr in Cahrge.
4
-
-
... More
M&L for replacment of unsv flow switch of chiller & condensor line 63 to 200mm dia line , including making all control conections suitable for existing complete all as specified & directed by Engr in Charge.
3
-
-
... More
M&L for cleaning of Y strainer & Pot strainer of central AC plant 65 to 250mm of Chiller line, condensor line by carefully opening the top & taking out the strainer and refixing after clening/wash out the line durt/sludge & replacment of defective nut,bolts, rubber gasket, dameged strainer as per existting size if required. After clening filling water in condenser/ chiller line by using additional pump, taking out the air in chiller & condensor line complete all as reqd at site & directed by Engr in Charge
12
-
-
... More
M&L for taking out three way actuator valve 65mm to 125mm of chiller line & refiixing duly carry out its servicing , replacing its defective parts including checking the control wiring with humidistat and making setting to control the desired temp & RH complete as reqd at site and to maintain desired RH& Temp of central water cooled AC palnts up to 200 TR complete all as specified and directed by Engr-in-charge.
4
-
-
... More
M& L for servicing of outdoor (condenser) unit of air cooled central/ Package type AC plant of any capacity by cleaning of fins by water jet of suitable pressure or cleaning by using chemical if reqd, including combing of fins by using fins comb to making straight the fins, checking electrical wiring, servicing, oiling of condenser motor, etc. complete as specified and directed by Engr-in-charge.
20
-
-
... More
M&L for replacement of unserviceable fan blade of outdoor condenser unit of air cooled package/ central type AC plant (5 to 7.5TR) as per existing make, model and type complete all as specified and directed by Engr-in-charge.
2
-
-
... More
S&F in replacement of blower belt of AHU/Compressor belts as per existing model and type ISI marked including re-alignment of the motor and blower if required for proper tension of belts complete all as specified and directed by Engr-in-charge.
25
-
-
... More
M&L for servicing of electric control panel of AHU central/Package type AC Plant by cleaning the panel with blower, checking of electric circuits/connections, replacement of unsv burnt wire, cables with existing size & length including proper numbering, replacement of u/s fuse link, lugs, washer, nuts, bolts, checking proper electrical connection, connectivity etc. & find out defective parts and making the panel functional by replacing the unsv item (taken as supply only) complete all as specified and directed by Engr-in-charge.
Note:(i) Unserviceable parts as MCB, MCCB, contactor, relay etc. will be measure and paid separately.
(ii) Minor parts like thimbles, tags, nut, bolts, washers etc shall be deemed to be included in quoted rate.
6
-
-
... More
M&L for taking down existing wiring & S&F for re-wiring of existing of Main Electric Panel board/Control panel board of Central/Package type AC Plant with replacement of wiring cable with existing size, & length including proper numbering, replacement of fuse link, lugs, washer, nuts, bolts, checking proper electrical connection, connectivity etc. & find out defective parts and making the panel functional by re-wiring, complete all as specified and directed by Engr-in-charge.
Note: (i) Unserviceable parts as MCB, MCCB, contactor, relay, MPD, etc. will be measure and paid separately.
(ii) Minor parts like thimbles, tags, nut, bolts, washers etc shall be deemed to be included in quoted rate.
12
-
-
... More
Supply only the following items (for use in Ser item No. 15 whereever required) complete all as specified and directed by Engr-in-charge.
-
-
-
... More
MCB 6-32 Amp SP C series
5
-
-
... More
MCB TPN 40 to 63Amp C series
5
-
-
... More
MCB TPN 10 to 32 Amp C series
5
-
-
... More
Power contactors 415 V, AC, 9 to 25 Amps, 3ph
4
-
-
... More
Power contactor 415 V, AC, 32 to 40 Amps, 3ph
6
-
-
... More
Power contactor 415 V, AC, 45 to 60 Amps, 3ph
5
-
-
... More
Power contactor 415 V, AC, 63 to 75 Amps, 3ph
5
-
-
... More
Add on Auxiliary contact block (MNX A-2 /MNX A-1/TA1-DN22)
3
-
-
... More
Voltage selector switch
3
-
-
... More
HRC fuse link RH type having breaking capacity 80 kA ( 2-32 amps)
10
-
-
... More
HRC fuse link bottle/Din type having breaking capacity 80 kA (36 to 63 amps) (L&T)
7
-
-
... More
HRC fuse link bottle/Din type having breaking capacity 80 kA (80 to 125 amps)
7
-
-
... More
Contactor three pole 415 v , 50 HZ, 9 Amp current rating.
8
-
-
... More
Contactor three pole 415 v , 50 HZ, 18 Amp current rating.
8
-
-
... More
Contactor three pole 415 v , 50 HZ, 25 Amp current rating.
7
-
-
... More
Contactor three pole 415 v , 50 HZ, 32 Amp current rating.
8
-
-
... More
Contactor MNX three pole 415 v , 50 HZ, 70 Amp current rating.
4
-
-
... More
Thermal Over Load Relay (Auto/Manual reset) suitable for contractors (Relay range 2.5-t to 9-13 Amps )
5
-
-
... More
Thermal Over Load Relay (Auto/Manual reset) suitable for contractors (Relay range 23-32 to 30-40 Amps
5
-
-
... More
PVC connector 15 to 60 Amps
10
-
-
... More
Electronic Timers 110/240/360/415Volts 50 Hz for (3-10/ 9-30/36-120 Sec)
4
-
-
... More
Single phase preventer suitable for 3 HP to 15 HP Monoblock pump sets
4
-
-
... More
R/Y/Phase/On/Trip indicating lamps (as per colour code)
7
-
-
... More
M&L for descaling of condenser with dilute sulphuric acid solution (as per OEM manufacturers specification) by using descaling pump for circulation of solution and brushing with nylon brush by opening both side covers and cleaning/flushing out the dirt, sludge with water up to satisfaction of Engr in charge and re-fixing the side cover with new gasket, replacement of worn out nut, bolts & washers and leak detection testing complete all as specified and directed by Engr-in-charge. for following capacity :-
-
-
-
... More
Capacity up to 10TR
10
-
-
... More
Capacity up to 11 to 20 TR
15
-
-
... More
Capacity from 31 TR to 100TR
6
-
-
... More
M&L for replacement or top-up of u/s burnt compressor oil and charging with new lubricant oil suitable for open type reciprocating compressor and up to 18 TR scroll compressure as per manufacturer's instruction complete all as specified and directed by Engr-in-charge.
110
-
-
... More
M&L for refrigerant gas R-22 including charging in compressors as per OEM specification complete all as specified and directed by Engr-in-charge.
280
-
-
... More
M&L for refrigerant gas R-407 including charging in compressors as per OEM specification complete all as specified and directed by Engr-in-charge.
60
-
-
... More
Material and labour for taking out unsv burnt electric motor of (compressor/Monoblock pump set /Blower/condenser/cooling tower) and rewinding the same by removing the burn out copper coil cleaning the motor and winding with super enameld copper wire of same gauge & turns including varnishing, providing new insulation sheet, heating the winding including replacement of unsv both end bearings, bush of existing size etc reqd at site, refixing to its original place and testing after repair complete all as specified and directed by Engr in charge for following capacity:-
-
-
-
... More
Up to 2 HP single /three Phase
6
-
-
... More
3 HP 3 phase
5
-
-
... More
5 HP 3 phase
10
-
-
... More
7.5 HP 3 phase
6
-
-
... More
10 HP 3 phase
2
-
-
... More
12.5 HP 3 phase
2
-
-
... More
15 HP 3 phase
2
-
-
... More
M&L for servicing and repairing of Monoblock Centrifugal pump set by greasing, cleaning the shaft, replacing unsv gland packing, bush, water seal, bearing etc of existing size, replacement of unserviceable nut, bots & washers, gasket etc. as required at site 3 to 15 HP pump set complete all as specified and directed by Engr-in-Charge.
25
-
-
... More
M&L for servicing of pan type humidifier floor mounted/ installed at duct of capacity 6 /12 kW including cleaning of tank, checking of all inlet & outlet connection, checking and repair of all electrical control connections and making the pan type humidifier functional including replacement of heating elements of existing make & model, replacment of minor parts complete all as specified and directed by Engr-in-charge.
8
-
-
... More
M&L for repair of existing unsv micro processor card through OEM service Center, Type MPD / μ-MVPD/M3PD 30-220 Amps, 230 V of control panel of chiller unit 15 to 100 TR including replacement of u/s parts like push button/ Key board, indicating light, display board, mother board etc. and testing, calibrating the functions with plant after repair etc complete all as specified and directed by Engr-in-charge.
4
-
-
... More
M&L for repair of existing unsv VLRP controller of chiller unit 15 to 100 TR cap including replacement of u/s parts like push button/ Key board, indicating light, display board, mother board etc. and testing, calibrating the functions with plant after repair etc complete all as specified and directed by Engr-in-charge.
4
-
-
... More
M&L for servicing, cleaning of Cooling tower of AC plant 10 to 200 TR Cap including cleaning the storage tank, removal of all sludge , servicing, greasing of cooling tower motor with hub assembly etc complete all as specified and directed by Engr-in-charge.
20
-
-
... More
M&L for leak detection of central/package type Ac plant 6.5 TR to 50TR cap,water/Air cooled including vaccum the refrigrent gas by using vaccum pump, giving suitable nitrogen pressure as per site condition holding the nitrogen pressure, detection of leakage by soap foam test, cutting, brazing to leak condenser coil, refrigrent piping & testing after brazing work after holding pressure again vaccum the system etc complete all as specified & directed by Engr in charge. Note: Refrigrant gas & Oil shall be measured & paid separatly.
8
-
-
... More
M&L for leak detection of central/package type Ac plant 75 TR to 100TR cap water/air cooled , including vaccum the refrigrent gas by using vaccum pump, giving suitable nitrogen pressure as per site condition holding the nitrogen pressure, detection of leakage by soap foam test, cutting, brazing to leak condenser coil, refrigrent piping & testing after brazing work after holding pressure again vaccum the system etc complete all as specified & directed by Engr in charge. Note: Refrigrant gas & Oil shall be measured & paid separatly.
4
-
-
... More
M&L for replacement of fan propellor 36" (914.4mm) 28mm bore suitable for 3 HP motro of out door 75 TR condenser unit of air cooled AC plant of cap 225 R voltas motor installed at 2402 complete all as specified and direted by Engr-in-Charge.
4
-
-
... More
M&L for replacment Air cooled condensor fan motor of cap 2.2KW / 3 HP suitable for working on 3 phase 415V, 50 Hz Ac supply induction motor having IP 55, Ins Cl -F, 945 RPM, Frame 112MV for AC plant suitable for existing fan motor complete all as specified and directed by Engr-in-charge.
2
-
-
... More
M&L taking out unsv MPD/VLRP and its control panel of package type AC plant (5.5/7.5/11 TR) air cooled for carry out repair through service center including replacement of unsv parts of MPD and refixing to its original place after carry out repair and testing the plant complete all as specified and directed by Engr-in-charge
5
-
-
... More
S&F in replacement of blower belt for package unit(5.5 to 11TR) as per existing type & model and type ISI marked complete all as specified and directed by Engr-in-charge
4
-
-
... More
M&L for replacement of HP/LP cut out suitable for compressor (5 to 18 TR) of package/central type AC plant including cutting, brazing and leakage testing complete as required at site and testing after replacement complete all as specified and directed by Engr-in-charge
6
-
-
... More
M&L for replacement of unsv scroll type compressor of package type ac plant of cap 5.5 TR capacity suitable for working on 380-415V, 3 phase, 50 Hz, having lubricant oil-PVE, heater including cutting brazing to inlet out let refrigerant piping, , nitrogen pressure test for leakage testing, vacuum the system and charging suitable Refrigerant gas and testing after replacement , complete all as specified suitable model for existing AC Plant and directed by Engr-in-charge .
Note:- Refrigerant gas shall be measured and paid in respective item.
1
-
-
... More
M&L for replacement of crank case heater of scroll type compressor suitable for 5 to 18 TR capacity as per existing type capacity and model complete all as specified and directed by Engr-in-charge.
8
-
-
... More
M&L for servicing of Hot water generator of AC plant of capacity up to 200 TR, by strip opening & removing sludge deposits etc including replacement of unsv heaters of existing model, size & capacity including replacement of connection copper fire resistant links of existing size & length, replacement of unsv indicator & selector switches complete all as specified and directed by Engr-in-charge.
12
-
-
... More
M&L for repairing of PCB control & monitoring card, replacment of temp sensor as per existing type & model of hot water generator and making hot water generator functional in auto mode with cutoff complete all as specified and directed by Engr-in-charge.
1
-
-
... More
M&L for refrigerant gas R-134a including charging in compressors as per OEM specification for 300 TR Plant complete all as specified and directed by Engr-in-charge.
62
-
-
... More
M&L for servicing of compressor by disconnecting /detaching from motor after pump down the system and taking out the parts after strip opening of compressor of Make: Voltas, Model: 06D18 capacity 6.5 TR.) Cleaning the parts of compressor & segregation of serviceable/unserviceable parts, keeping serviceable parts aside for reuse and replacing the worn out parts (taken as supply only), turning, lathe work on crank shaft if required, Reassembling the complete compressor parts, including checking leak test by using nitrogen pressure test at suitable pressure, vacuumed the compressor by using vacuum pump & filling oil and charging of gas R-22, testing and commissioning of complete system as per OEM complete all as specified and directed by Engr-in-charge.
Note: (i) Work shall be carried out through Mechanic having 10 Years experience of repair of the compressor, contractor should experience of mechnic in respective field.
(ii) Unserviceable nut, bolts, washers, springs etc. found unserviceable will be replaced and deemed to be included in quoted rate. (iii) Major spare parts, compressor oil and Frozen gas shall be measured and paid separately.
2
-
-
... More
Supply only the following spare parts suitable for compressor for existing compressor of Voltas Model: 06D18 (6.5 TR)) complete all as specified and directed by Engr-in-charge
-
-
-
... More
Connecting rod with bearing.
4
-
-
... More
Piston with pin and ring
4
-
-
... More
Such/ Discharge valve assly complete.
4
-
-
... More
Shaft seal assly
2
-
-
... More
O' ring set.
2
-
-
... More
Gasket set.
2
-
-
... More
Oil pump assembly
1
-
-
... More
Suction strainer filter
1
-
-
... More
Oil strainer filter
1
-
-
... More
Solenoid valve
2
-
-
... More
Crank case heater
1
-
-
... More
HP/LP cut-out switch
1
-
-
... More
M&L for servicing of compressor by disconnecting /detaching from motor after pump down the system and taking out the parts after strip opening of compressor of Make: Voltas Model: 5F40-1009 capacity 15 TR existings at site including Cleaning the parts of compressor & segregation of serviceable/unserviceable parts, keeping serviceable parts aside for reuse and replacing the worn out parts (taken as supply only), turning, lathe work on crank shaft if required, Reassembling the complete compressor parts, including checking leak test by using nitrogen pressure test at suitable pressure, vacuum the compressor by using vacuum pump & filling oil and charging of gas R-22, testing and commissioning of complete system as per OEM complete all as specified and directed by Engr-in-charge.
Note: (i) Work shall be carried Mechanic having 10 Years experience of repair of the compressor, contractor shall submit experience certificate for mechnic in respective field. (ii) Unserviceable nut, bolts, washers, springs etc. will be replaced and deemed to be included in the job work rate. (iii) Major spare parts, compressor oil and Frozen gas shall be measured and paid separately.
3
-
-
... More
Supply only the following parts (for Srl item No- 41 above) complete all as specified and directed by Engr-in-charge.
-
-
-
... More
Connecting rod with bearing
4
-
-
... More
Piston with pin and ring
4
-
-
... More
Suc/ Discharge valve assly
4
-
-
... More
Shaft seal assly
2
-
-
... More
O' ring set
2
-
-
... More
Gasket set
2
-
-
... More
Oil pump assembly
1
-
-
... More
Suction strainer
1
-
-
... More
Oil strainer
1
-
-
... More
Solenoid valve
2
-
-
... More
Crank case heater
1
-
-
... More
Pressure sensor
4
-
-
... More
M&L for servicing of compressor by disconnecting /detaching from motor after pump down the system and taking out the parts after strip opening of compressor (Make: Voltas Ltd, 5040S, 1x30 TR) Cleaning the parts of compressor & segregation of serviceable/unserviceable parts, keeping serviceable parts aside for reuse and replacing the worn out parts (taken as supply only), turning, lathe work on crank shaft if required, Reassembling the complete compressor parts, including checking leak test by using nitrogen pressure test at suitable pressure, vacuum the compressor by using vacuum pump & filling oil and charging of gas R-22, testing and commissioning of complete system as per OEM complete all as specified and directed by Engr-in-charge
Note: (i) Work shall be carried out through OEM Mechanics or Mechanic having 10 Years experience of repair of the compressor. (ii) Unserviceable nut, bolts, washers, springs etc. will be replaced and deemed to be included in quoted rate. (iii) Major spare parts, compressor oil and Frozen gas shall be measured and paid separately.
1
-
-
... More
Supply only the following items (for Srl item No-53 above) complete all as specified and directed by Engr-in-charge
-
-
-
... More
Connecting rod with bearing
4
-
-
... More
Piston with pin and ring
4
-
-
... More
Suc/ Discharge valve assly
4
-
-
... More
Shaft seal assly
2
-
-
... More
O' ring set
2
-
-
... More
Gasket set
2
-
-
... More
Oil pump
1
-
-
... More
Suction strainer
1
-
-
... More
Oil strainer
1
-
-
... More
Solenoid valve
2
-
-
... More
Crank case heater
1
-
-
... More
Pressure sensor
4
-
-
... More
M&L for taking out existing Unsv scroll compressor and replace with new compressor 18 TR suitable for existing AC plant working on 380-415V 3 phase , 50Hz, LR 270A, Max Oper-58A, thermally protected system, LP side (PS 20 bar, TS max 53oC TS min-35oC, Vol 32.8I) HP side (PS 29.6 bar, TS max 68.3oC TS min-35oC, Vol 2.oI), having lubricant POE320SZ, heater etc including making connections inlet outlet refrigerant piping, nitrogen pressure test for leak testing , vacuum the system and charging suitable Refrigerant gas and testing after replacement complete all as specified and directed by Engr-in-charge. Note:- Refrigerant gas shall be measured and paid in respective item.
3
-
-
... More
S&F for in replacement of existing unsv VLRP controller of chiller unit 15 to 36 TR cap testing, calibrating the functions with plant after replacement complete all as specified and directed by Engr-in-charge.
2
-
-
... More
M&L for repair/replacement of existing chiller of AC plant by disconnecting /detaching from motor after pump down the system and taking out the parts after opening of chiller (Make: Voltas 10 to 100 TR) Cleaning the parts of Chiller & segregation of serviceable/unserviceable parts, keeping serviceable parts aside for reuse and replacing the worn out parts, turning, lathe work if required, Reassembling the complete chiller parts, including checking leak test by using nitrogen pressure test at suitable pressure, vacuum the compressor by using vacuum pump & filling oil and charging of gas R-22, testing and commissioning of complete system as per OEM complete all as specified and directed by Engr-in-charge
Note: (i) Work shall be carried out through OEM Mechanics or Mechanic having 10 Years experience of repair of the chiller . (ii) Unserviceable nut, bolts, washers, springs & cutting/welding/heating etc. will be replaced and deemed to be included in quoted rate. (iii) Major spare parts, Frozen gas shall be measured and paid separately.
1
-
-
... More
M & L for attending emergant complaints by experienced refregeration machanic i.e. partaining to Centre AC Plant / Packages Type AC plant/ VRF / Type AC plant of any Capacity including carry out minor repairs etc as required to system in order/functional complete all as specified and direted by Engr-in-Charge.
90
-
-
... More
M&L for replacement of unserviceable Hot water Genrator heater Coils type 2 KW/ 3KW capacity as per existing make & model complete all as specified and directed by Engr-in-charge.
10
-
-
... More
M&L for replacement of unserviceable Hot water Genrator heater Coils type 9KW capacity as per existing make & model complete all as specified and directed by Engr-in-charge.
4
-
-
... More
M & L for replacement of unserviceable fire damper controler as per existing make & model
5
-
-
... More
S&F in replacement of Condensser copper Coil ( set of 2 Coils ) of Voltas Air cooled Central AC Plant 75 Tr capacity incl all accessories such as brazing leak testing & gas charging with suitabe refrigent including all accessories complete all as specified and direced by Engr in Charge.
2
-
-
... More
M&L for repair/replacement of existing blower by disconnecting/detaching/cutting /lapping etc from package type unit (upto 11 TR) replacement of unserviceable nut bolts & Washers, gasket etc as required at site complete all as specified anddirected by Engin-in-charge.
3
-
-
... More
S&F for in replacement of existing unsv VLRP controller of chiller unit 40 to 100 TR cap testing, calibrating the functions with plant after replacement complete all as specified and directed by Engr-in-charge.
2
-
-
... More
M&L for fixing rubber coupling Model No unique TC-K-019.3902DE/unique rubber U-26-2514-PX
6
-
-
... More
M&L for replacement of unsv fusible link for fire dampers, UL listed fusible link complete all as specified and directed by Engr-in-charge.
2
-
-
... More
S&F in replacement of AHU hot water copper coil of suitable ( size 4x4 feet) for existing Voltas water cooled Central AC plant 8.75 TR capacity, incl all accessories such as brazing, leak testing to achieve desired heating effect & connected with hot water pine line includiing all accessories complete all as specified and directed by Engr in Charge
1
-
-
... More
M&L for replacment of unsv flanged type EU-4 grade Filters for AHU, having aluminum MOC casing, HDPE+NW+HDPE Mesh fileter media , filtration effiency 90% down to 10 Micron, size 610x545x50mm, Air flow 1000CFM , complete all as specified and directed by Engr-in-Charge.
10
-
-
... More
M&L for taking out existing Unsv scroll compressor and replace with new compressor of cap12 TR suitable for existing AC Plant working on 380-415V 3 phase , 50Hz, LR 175A, Max Oper-35A, thermally protected system, LP side (PS 25 bar, TS max 63oC TS min-35oC, Vol 31.oI) HP side (PS 27.8 bar, TS max 68oC TS min-35oC, Vol 2.oI), having lubricant Mineral Oil 160P, heater etc including making connections inlet outlet refrigerant piping, nitrogen pressure test for leak testing , vacuum the system and charging suitable Refrigerant gas and testing after replacement complete all as specified and directed by Engr-in-charge. Note:- Refrigerant gas shall be measured and paid in respective item.
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%