Military Engineer Services Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Military Engineer Services - MES Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Sep 2024
Closing Date14 Sep 2024
Tender Amount₹ 1,10,00,000
Costs
EMD
₹ 1,85,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_664363_2Tender No
8052/CWE (NW) Mumbai/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
(b) Condenser Pump Set of 40 HP motor capacity- 4 Nos.
Condenser water pump with 3 phase induction motor, butterfly valve NRV and strainer etc with head of 25mtr, discharge 306cum/hr make GEC, motor rating 30KW, 1465RPM, 47 Amps, 415V Make Kirloskar.
(c) Chiller Pump Set of 100 HP motor capacity -4 Nos
Chilled water pump set with 3phase, 415V,Induciotn motor Make Kirloskar including butterfly valve, NRV and strainer etc, with pump head of 60mtr, discharge 3445 LPM, rating 55KW, 1465RPM.
(d) Cooling Tower (FRP) with 15/20 HP blower motor - 4 Nos.
Cooling tower with motor fan, sump, butterfly valve NRV, strainer makeup tank of capacity 10000 litres pvc syntex tank, motor capacity of 15/20HP Make 04 Nos of Advance cooling tower ltd. (e) 37 Nos AHUs, 09 FCUs, 09 Nos RUs, 10 Nos Ductable ACs of various capacity including all connected accessaries.
-
-
-
(ii ) Rates quoted by the contractor shall be deemed to be included cleaning of installation & surrounding area of AC Plant, taking care from any pilferage/damage of installation & maintening documents/registers, duty roster & attendence register complete all as specified & directed. (iii) The rates quoted by contractor shall be deemed to be included provision of all the latest labour laws / regulation including all relevent taxes as applicable.
(c) Contractor shall quoted the rates considering their monthly leaves, reliever etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/ tradesman from duty, payment of that day will not be paid, In addition of that a penalty of Rs 1500/- per day per person will be recovered from contractor dues. also in case of long absence continuously (more than one week) of staff/tradesman, The payment of that day will not be paid. The contractor shall have to claim on this account.
(iv) Contractor has to supply three sets of tools and plant to the labour employed by him and should be placed with the safe custody of department, rates quoted shall be deemed to be inculded the above of provision.
-
-
-
(v ) Surprise check will be carried out by department representative and if any emplyoes is not availabe at his working place, he will be treated as absent. (vi) Contractor has to submit the list of employes including reserve along with police verification, Adhar card, Adhar card linked bank account No and relevant documents as mentioned in PS to the Engineer-in-Charge along with performance security before issue work order.
(vii) The payment shall be made to employes on or before 10th of every calender month. Payment to employes shall be done by crossed cheque/RTGS/NEFT/IMPS through Adhar card linked Bank Account only and it shall not be less than minimum fair wages as per act in vogue.
(viii) Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement.
-
-
-
(ix) In case any variation in manpower as indicated in Column No 4 of BOQ due to any reasons/ or any manpower held in department or any policy change contractor should have no claim on that account (x) Contractor will render a certificate/ confirmation every month that minimum wages act is not violated and every employee engaged have been paid their wages only through individual bank account laborers in full and receipts there on obtained.(xv) If the quoted amount is less than the estimated cost given at SCH A Note at Page No 14 the lowest bidder will have to depost FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (cover No 2).
(xi) The deposited amount shall be the difference between estimated cost given at SCH A Note at Page No 14 and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to with hold the said amount which will beverified by GE. The decision of Accepting Officer regarding amont to be withheld shall be final and binding. The withheld amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall submit 03 Nos of BGNs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be 04 months, 08 month & 12 months respectively for the purpose of encashment release as the case may be. (xii) The rates quoted shall be inclusive of suitable reliever wherever sundays & holidays are mentioned for working.
-
-
-
Repair/Routine maintenance of Central Air conditioner plant (Make: DAIKIN)to entire hospital, maintained 24 hrs for desire temperature of 25 degree +/-2 degree celcious & humidity of 55 +/-% without interruption including repairing/replacement of damage/unsrv of valve, chiller pipe, condenser pipe, cooling towers, insulation of chilled water pipe line, greasing of motor & pumps complete all as specified & as directed.
-
-
-
Chilled pump set of 100 HP motor capacity - 04 Nos
11
-
-
Cooling Tower (FRP) with 15/20 HP blower motor - 04 Nos
11
-
-
Comprehensive maintenance day to day including repair /routine maintenance of DAIKIN make Chiller No. 01 Model No. PFS4302DBRY,Sl No 0000110 of capacity 400 TR screw type double compressor including replacement of damaged part like electronic, electric parts, equipment motor and connected parts, compressor & connected parts including all parts of chiller units excluding compressor oil and filters complete all as specified and as directed.
11
-
-
Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 02 Model No. PFS4302DBRY,Sl No 0000132 of capacity 400 TR screw type double compressor including replacement of damaged part like electronic, electric parts, equipment motor and connected parts, compressor & connected parts including all parts of chiller units excluding compressor oil and filters complete all as specified and as directed.
11
-
-
Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 03 Model No. PFS4302DBRY,Sl No 0000131 of capacity 400 TR screw type double compressorincluding replacement of damaged part like electronic, electric parts, equipment motor and connected parts, compressor & connected parts including all parts of chiller units excluding compressor oil and filters complete all as specified and as directed.
11
-
-
Comprehensive maintenance including repair /routine maintenance of DAIKIN make Chiller No. 04 Model No. PFS 430B, of capacity 400 TR screw type double compressorincluding replacement of damaged part like electronic, electric parts, equipment motor and connected parts, compressor & connected parts including all parts of chiller units excluding compressor oil and filters complete all as specified and as directed. (Note: Maintenance time period from Oct 2024 to Feb 2025)
5
-
-
Descaling of condenser shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace U/s gasket including testing with nitrogen gas after completion of work complete all as specified and directed
1
-
-
Descaling of evapourator or chiller shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace U/s gasket including testing with nitrogen gas after completion of work complete all as specified and directed
1
-
-
Taking down old U/s duct insulation, cleaning the duct surface with steel brushto remove dirt/dust and make it free of mill scale , greases and foreign matter, applying two coats of bituminous paint (taking special care over non galvanised parts) , applying rubber based adhesive CRPX compound manufactured by shalimar Tar product on ducts sticking the fiber glass section in the form of pad with the density 24 Kg/Cum shall be fixed tightly to the surface & all joints to be sealed properly by using sealing compound, cover with aluminium foil kraft paper laminate with minimum overlap of 50mm, cover with Glasswool seal each lap joint with self adhesive aluminium foil tape 50mm wide complete all as specified and directed
310
-
-
Supply & fixing in repairs wire netting of galvanised steel wire 24 guage fixed with tinned tacks of wire staples mesh size 12mm aparture over entire duct insulation with 50mm overlap for preventing rat bites.
250
-
-
Taking down old rectangular square duct including insulation, wire net & all connected accessories and making good disturbed surfaces as per existing complete all as specified & directed by Engr-in-charge.
210
-
-
Supply and errect factory fabricated Rectangular square Duct made out of 24 gauge GI sheet in L shaped hollow profile including all accessories such as corner, carriage bolt hangers, gasket and seal the longitudinal joints with and including approved sealant complete all as specified and directed by Engineer-in-Charge.
180
-
-
Supply and fix in repair Sensar of Model Name- PFS4302DBRY of Daikin for chiller of 400 TR capacity (Chilled water/Condensor water/ oil temp / bearing temp) complete all as specified and directed.
15
-
-
Supply and Charging of Gas R 134a complete all as specified and directed
300
-
-
Material & labour for rewinding of electric motor of 943.2 Horse power (200TR) screw compressor motor make-Diakin , 3phase 50hz, 415V with super enamelled copper winding wire of existing guage including dismantling, assembling after rewinding to its original location complete all as specified and directed
1
-
-
Material & labour for rewinding of electric motor of the following capacity, 3phase 50hz, 415V with super enamelled copper winding wire of suitable guage including dismantling, assembling after rewinding to its original location of capacity 100 Horse power (400 TR) complete all as specified and directed
4
-
-
All as per Srl Item No. 17.00 here in before but 20 HP
1
-
-
All as per Srl Item No. 17.00 here in before but 15 HP
1
-
-
Taking down old unsrv insulation over the chiller pipe line, cleaning water pipe surface with steel brush remove dirt/dust, Material & labour for chilled pipe line insulation by applying a coat of zinc chromite primer & apply a two coats of cold setting adhesive compound (CRPX) on pipes for sticking the insulation bonded mineral wool of density 144 Kg/cum, 50mm thikness tightly pressed on the pipe upto 250mm dia seal all the joint with adhesive compound wrap the insulation surface by using one layer of polythene sheet 50mm wide PVC tape cover the entire with chicken mesh finish the surface, of density 144 Kg/Cum and cover 26 gauge alluminium GI cladding of approved colour & cover with Glasswool complete all as directed.
310
-
-
Supply & fill compressor lubricating oil for chillers, Alkyl Benzene bases with ISO viscosity grade 86.
150
-
-
Supply & fixing in repairs filter drier 5/8" MFL suitable for filteration of R-134A gas suitable for Daikin make chiller.
5
-
-
Supply & fixing in repair retainer for collecting the oil from the chiller in recirculation line of Daikin make chiller.
5
-
-
Supply & fixing in repairs filter core multilayered filtration medium 3/8" suitable for R-134A Gas suitable for Daikin make Chiller.
5
-
-
Supply & fixing in repairs filteration kit CI body suitable for 4-1/2" flare connection both sides
3
-
-
Supply & fixing in repairs filter (low side and oil reclaim) suitable for Daikin Chiller Alkene benzene based compressor oil with suitable flare connection on both ends.
5
-
-
Material & labour for complete recovery of existing gas using recovery pump from the chiller unit, supply & charging Nitrogen gas at 150 PSIG pressure for testing the chiller for 24 hrs, vaccumising the gas upto 500 micron and again fill R-134A gas to required level complete all as per instructions and directions of Engineer-in-charge.
Note: (a) R-134A gas will be measured and paid seperately.
(b) Contractor shall be arrange for R-134A empty gas cyllinders, Recovery pump, Nitrogen gas cylinder and all other Materials as per sitre requirement.
The work shall be carried out in the presence of OEM Daikin Engineer.
1
-
-
Material & labour for 40 mm bore GI tubing medium grade with all fittings such as bends, socket, tees, elbows, unions, barrel, nipple, plugs, etc fixed to walls and ceiling with suitable size GI clamps or laid in floors complete all as specified & as directed.
60
-
-
Material & labour for preparation of old painted steel surfaces of any description of iron Brackets, Iron Cantilever Beams, Rail sections, cleaning the surface with steel brush to remove dirt/dust etc and applying two coats of black synthetic enamel paint over a coat of red oxide zinc chrome primer including every joints, corners complete all as specified & as directed by Engr-in-charge.
50
-
-
Supply and fixing in repairs aluminium rectangular grills complete with wooden frame work made out of II nd class hard wood, volume control damper including gasket and connected accessories complete all as directed by Engineer-in-Charge.
90
-
-
Taking down carefully existing false ceiling of any description and refixing the same after completion of work all as specified & as directed by Engr-in-charge.
60
-
-
PART-II (Cooling Tower)
-
-
-
Supply and fixing in repairs advance cooling tower nozzles as per existing in Advance cooling tower model No- AL-091 complete all as specified and directed.
40
-
-
Dismantling/Taking down old unservicable FRP body structure of cooling tower carefully and cleaning the sump with chemical and supply and fixing of new FRP sheets as per size existing at site including all fixing material such as m seal other water resistance adhesives and make the cooling tower structure leak proof complete all as specified and directed.
50
-
-
Supply and fixing in repairs 40mm dia gun metal Gate/Globe valve ISI marked complete all as specified and directed.
3
-
-
Supply and fixing in repairs 25mm dia gun metal Gate/Globe valve ISI marked complete all as specified and directed.
3
-
-
Supply and fixing in repairs 250mm bore CI Butter fly valve slim seal design with nitrile rubber lined seat with clutch lever (p10) conforming to IS 13095 complete all as specified and directed.
3
-
-
Supply and fixing in repairs 150mm bore CI Butter fly valve slim seal design with nitrile rubber lined seat with clutch lever (p10) conforming to IS 13095 complete all as specified and directed.
5
-
-
Supply , lay in repairs including welding 300mm bore MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc.complete all as specified and directed.
40
-
-
Supply , lay in repairs including welding 250mm bore MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc.complete all as specified and directed.
40
-
-
Supply , lay in repairs including welding 150mm bore MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc.complete all as specified and directed.
15
-
-
Supply , lay in repairs including welding 100mm bore MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc.complete all as specified and directed.
40
-
-
Supply , lay in repairs including welding 65mm bore MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc.complete all as specified and directed.
35
-
-
Material & labour for mild steel clamps, supports, brackets etc fabricated from structural steel sections including nuts, bolts,washers, welding ,bending cold or hot, drilling holes for bolts, in any shape or size as directed including applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer complete all as specified.
200
-
-
Supply and fixing in repair of 4-1RM91 PVC Fills 300 Nos made of Virgin rigid PVC fiims, vaccum formed in shape and design of honey comb constn, even distribution of water to achieve maximum heat exchange, larger wetted surface area and high efficiency water to air heat transfer complete all as specified and as directed.
1
-
-
Taking out old unservicable Louvers from Advance cooling tower model No- AL-091 at the site and Supply and fixing of new louver set containing 80 nos of same size, quality for cooling tower as per the existing at the site complete all as specified and directed.
1
-
-
Supply & Installation in repairs Hot Dip Galvanised GI Cable tray 300mm with collar height of 16 SWG thickness with Cover suitable for laying refrigerant pipes and Power & control cables, including providing support, clamps, rods, bolts, nuts, washers, fastners etc complete all as specified and as directed by Enginner-in-Charge.
200
-
-
Supply & fixing in repairs MCCB 3P, 415 V, Adjustable type, 25 - 100 Amps with breaking capacity 16KA, Including making suitable fixing arrangement with all connected accessories in existing LT panel of Cooling Tower complete all as specified and as directed.
6
-
-
Taking down old U/s insulation over the cooling tower pipe line, cleaning water pipe surface with steel brush to remove dirt/dust etc applying insulation of rubber based adhesive CRPX compound manufactured by shaimar tar product , sticking the fiber glass cloth by mixing of Star bond material in the form of pad with the density 24 Kg/Cum fixed tightly to the surface complete all as specified and as directed.
150
-
-
Supply, installation, testing in repairs chrome steel fan hub assembly with appropriate size suitable for cooling tower & fixed with suitable size nut, bolts & washers with complete accessories all as specified & as directed.
1
-
-
Supply, fixing, testing in repairs iron base channel for mounting of cooling tower fan hub assembly of appropriate size as per existing including nut, bolts & washers with complete accessories all as specified & as directed by Engr-in-charge.
2
-
-
Supply, fixing, testing in repairs cooling tower fan belt as per existing size and make complete all as specified & as directed by Engr-in-charge.
7
-
-
Supply and fixing in repairs pressure gauge 4" dial 0-20 Kg rating complete all as specified & as directed by Engr-in-charge.
10
-
-
Supply and fixing in repairs contactor 3 pole, MNX 25, AC-1 rating of 45 Amps complete all as specified & as directed by Engr-in-charge.
8
-
-
Supply and fixing in repairs 50mm dia gun metal Gate/Globe valve ISI marked complete all as specified and directed.
4
-
-
S&F in repairs ball valves, high pressure of PTMT with epoxy coated aluminum rod and high density plastic ball screwed for iron pipe and fixed to 25mm bore pipe (minimum weight 455 gms).
4
-
-
Supply and fixing in repairs anti vibration pads suitable for supporting combined weight of pump - motor assembly to absorb the vibrations encountered during operation of chilled motor pump of capacity 100 HP complete all as specified and directed.
14
-
-
M&L for PCC 1:2:4 type B-1 (using 20mm graded stone aggregate) as in foundation including necessary form work complete all as specified.
1.5
-
-
M& L for Nitrile rubber insulation of 19mm thickness sticking on surface by using approved adhesive and sealing the joints by weather proof tape complete all as specified.
3
-
-