Maharashtra Industrial Development Corporation Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Maharashtra Industrial Development Corporation - MIDC Tender
Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date5 Feb 2025
Closing Date13 Feb 2025
Tender Amount₹ 7,11,19,644
AI Insights
AI Insights
Technical
Financial
Bid Capacity
The bid capacity required in the given tender to bid can be calculated using the formula:
Assessed Available Bid capacity = (A*N*2 - B)
Where:
A = Maximum value of civil/electrical/mechanical engineering works executed in anyone year during the last five years (updated at 10% per annum (Compounded) by multiplying values with applicable factor i.e. 1.1, 1.21, 1.33, 1.46 & 1.61 as the case may be)
N = Number of years prescribed for completion of the works for which bids are invited.
B = Value (updated at 10% per annum (Compounded) by multiplying values with applicable factor i.e. 1.1, 1.21, 1.33, 1.46 & 1.61 as the case may be) of existing commitments and on-going works to be completed during the next … Years (period of completion of the Works for which bids are invited)
Alternatively, the bid capacity required in the given tender to bid can also be calculated using the formula:
(A x N x 2) – B
Where:
A = Maximum of the updated values of works executed in one of the preceding 5 years.
B = Value of existing commitment of works (on-going or to be completed in the period stipulated for completion of the work in the present tender).
N = Number of years prescribed for completion of the project for this work.
The value of A is updated by multiplying the original value with a factor of 1.1, 1.21, 1.331, 1.46, or 1.61, depending on the number of years since the work was executed.
Additionally, the bidder should have a minimum bid capacity of more than the total bid value, and the available bid capacity should be more than the total bid value.
Also, the bidder should have liquid assets and/or availability of credit facilities of not less than 25 % of contract value indicated in tender document.
The bidder should also demonstrate availability of key and critical equipment for this work, and personnel with adequate experience as required.
The annual turnover of the bidder should not be less than 75% of Annual Cost of the work. (Only for unregistered contractor)
(Annual cost of Work = Estimated Cost of work/ Time limit in years)
Technical Capacity
The required prior work experience for the bidder includes satisfactorily completing CI/ DI/MS/ HDPE /MDPE/ LDPE/GRP pipeline works in Govt./Semi Govt. Dept./Local bodies during the last five financial years. The specific requirements are as follows:
A. Cost of single work of any pipeline of Water supply/Sewage/ Drainage shall not be less than Rs. 355.60 lakhs.
OR
More than 750 mm diameter and having total length more than 167.50 meter of any pipe line of Water supply/ Sewage/ Drainage.
B. Total cost of 2 works of any pipeline of Water supply/ Sewage/ Drainage shall not be less than Rs. 497.84 lakhs.
OR
More than 750 mm diameter and having total length of two works more than 234.50 meter of any pipe line of Water supply/ Sewage/ Drainage.
C. Total cost of 3 works of any pipeline of Water supply/Sewage/ Drainage shall not be less than Rs. 568.96 lakhs
OR
More than 750 mm diameter and having total length of three works more than 268.00 m of any pipe line of Water supply/ Sewage/ Drainage.
For private works experience, only 50% amount or magnitude of the work completion certificate issued by private entity will be considered as work done amount or magnitude.
The annual turnover of the bidder should be at least 75% of the Annual Cost of the work. The maximum of the turnover of the last 5 financial years shall not be less than 75% of the Annual Cost of the work.
The value of completed work should be updated at 10% per annum (compounded) by multiplying the values with applicable factors such as 1.1, 1.21, or 1.331.
However, specific details on the percentage of similar works completed are not mentioned, except that the experience of private work of CI/DI/MS/HDPE/MDPE/LDPE/GRP pipeline work will also be considered subject to the above conditions, with only 50% amount or magnitude of the work completion certificate issued by private entity considered as work done amount or magnitude.
Costs
EMD
₹ 3,55,600Document Cost
₹ 30,680Tender Fee
₹ 500
Summary
Dc Work... Lowering Down Midcs And Jindals Water Supply Pipeline For Making Approaches.....
Description
Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MIDC_1146042_1Bid Award Id
ViewTender No
ETN No.74/1 for 2024-2025Tender Authority
Maharashtra Industrial Development Corporation ViewPurchaser Address
-Website
mahatenders.gov.in
Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document
BOQ Items
Item | Quantity | Units | Rate | Amount |
---|---|---|---|---|
User do not have access to view details | Invalid | Invalid |
Evaluation Notes How It Works ?
Result
No Result Available
Click here to view all tender results of this authority
Potential Partner
Select Your Requirements