Bhabha Atomic Research Centre Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Bhabha Atomic Research Centre - BARC Tender

Works
Solid Waste Management
Eprocure
Opening Date24 Oct 2024
Closing Date20 Nov 2024
Tender Amount₹ 60,42,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and supplying of Dumper for the collection and transportation of scrap items, unserviceable equipments, furniture, debris, garbage at various location inside BARC Trombay, Mumbai as instructed by Engineer Incharge.

150

-

-

... More
Collecting of structural steel scrap and cutting into pieces and stacking the same as instructed by Project Engineer at various locations of BARC, Trombay, Mumbai as instructed by Engineer Incharge.

5

-

-

... More
Supplying man power along with necessary spades, shovels, punjas, ropes, small special spades, rain coats, broom, mop etc, minimum two labours per day and maximum any number of labour as and when decided by Engineer Incharge to work for eight hours per day to carry out the cleaning work, loading work etc as directed by Engineer Incharge.

1500

-

-

... More
Lead charges for disposal of debris, surplus earth etc. With a Lead Exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc.

50

-

-

... More
Lead charges for disposal of debris, surplus earth etc. With a lead Exceeding 3 KM but not exceeding 4 KM, by mechanical transport including loading, unloading, stacking / levelling etc. Note : The rates in respect of Item Nos. 7 to 8 are applicable for the NET Quantity arrived at after making deductions for voids @ 30% from the corresponding STACK / TRUCK measurements.

50

-

-

... More
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note : (1) Each Job shall be carried out by one qualified Degree holder Civil Engineer with 2 (Two) years experience or Diploma holder with 5 (Five) years experience (Licentiate in Civil/Construction Engineering / Technology) conducted by Board of Technical Examinations / University / Autonomous Govt. / Govt. recognized recognized Polytechnic/ Institute. (2) Deployment: The contractor shall deploy one Engineer for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the Engineer will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out number of Jobs per month as per requirement at site for the period mentioned in NIT. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one Engineer exclusively for the particular job. (5) Engineer should be engaged after scrutiny by EIC of CED, BARC and approved by Competent authority and the deployed Engineer will report to BARC Engineer/ EIC. (6) The minimum notice period before change of engineer is 1 (one) month; failing which a compensation, for not providing technical support, of Rs. 1,915/- per day of shortfall in notice period will be levied on the contractor.7: The Engineer may be deployed at any site of BARC and no additional cost whatsoever will be paid in this regard.

36

-

-

... More
Carrying out Data Entry operations and assisting departmental Officer / Engineers, preparation of monthly and quarterly statements, dispatching and delivering documents/file movement and maintaining registers and documents, checking/preparation of agreements etc. as instructed by Engineer-In-charge. Notes: (1) Qualification: Each job shall be carried out by one data entry operator having minimum HSC pass (12th Standard) with complete knowedge of computer (like MS office, etc.) and should also be well conversant in English and Hindi language. (2) Deployment : The contractor shall deploy one Data entry operator for each job as Single Day work for 6 working days per week for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. (3) Period of work: The contractor shall carry out number of Jobs per day as directed by Engineer-in -Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one Data entry operator exclusively for the particular job. (5) The Data entry operator should be engaged after scrutiny by EIC of CED, BARC and approved by Competent authority and the deployed Data entry operator will report to BARC Engineer/ EIC. (6) The minimum notice period before change of Data entry operator is 1 (one) month; failing which a compensation, for not providing technical support, of Rs. 1,103/- per day of shortfall in notice period will be levied on the contractor.

900

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.