Bhabha Atomic Research Centre Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Bhabha Atomic Research Centre - BARC Tender

Works
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date6 Dec 2024
Closing Date21 Jan 2025
Tender Amount₹ 1,99,90,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Boring vertically through all kinds of soils, weathered rock and soft rock, boulders, if any met during drilling with suitable and adequate equipment as required for the depth as measured below existing ground level.Note:(1) RQD of 10% and less will be considered as weathered/soft rock. (2) The soft or weathered rock underlying hard rock with thickness greater than 0.5 M will be considered as soft or weathered rock. (3) Core recovery of 20% and less also considered as soft rock at appropriate depth. 4) Bore holes , location, depth as specified in the drawing and as specified by Engineer in charge.

-

-

-

... More
0 m to 10 m. From G.L

310

-

-

... More
10 m to 20 m from G.L.

310

-

-

... More
20 m to 30 m from G.L.

310

-

-

... More
30 m to 40 m from G.L.

135

-

-

... More
40 m to 50 m from G.L.

30

-

-

... More
Drilling vertically through bedrock strata (Hard rock), using Nx size diamond bit, using double tube core barrel with suitable core catcher, including collection and logging of cores, placing them in approved wooden core boxes made up of 25mm thick planks with partitions of 12mm thick as per relevant IS with a coat of Anti Termite chemical in a proper sequence, numbering each core, noting the lithology, colour photographs (100X150mm size) of rock cores, locking arrangements, labeling and transporting the boxes to core store/laboratory as directed by EIC etc., all as per specifications for the following depths measured from existing ground level :Note:(1) RQD of 10% and less will be considered as weathered/soft rock. (2) The soft or weathered rock underlying hard rock with thickness greater than 0.5 M will be considered as soft or weathered rock. (3) Core recovery of 20% and less also considered as soft rock at appropriate depth. 4) Bore holes , location, depth as specified in the drawing and as specified by Engineer in charge.

-

-

-

... More
0 m to 20 m. From G.L

570

-

-

... More
20 m to 40 m. From G.L

450

-

-

... More
40 m to 50 m from GL

30

-

-

... More
Obtaining 90 mm diameter, 450 mm long undisturbed soil samples (UDS ) from boreholes WITH JARRING LINK in soil, soft and weathered rock and collecting packaging and labeling.

820

-

-

... More
Conducting Standard Penetration Tests (SPT) in soil, soft and weathered rock and collecting, packaging and labelling disturbed soil/rock samples there from all as per IS:2131-1981(reaffirmed in 2002).

230

-

-

... More
Conducting Standard Penetration Tests (SPT) as in Item No. 7 above but with part of the distrubed soil samples of medium stiff to hard cohesive soils to be coated with paraffin wax and sealed immediately on collection to completely retain all moisture within the sample, and part of the sample to be collected, packaged and sealed as in item No. 7 above.

185

-

-

... More
Conducting SPT in rock with RQD greater than 10% and less than 25% all as per specifications, including replacement of SPT shoe by a new SPT shoe for each SPT as per specifications.

185

-

-

... More
Collection of ground water samples for evaluation of ground water level and their variation as per IS:1892-1979 (reaffirmed in 2002), IS:6935-1973 (reaffirmed in 2012) from each borehole at specified depths (minimum 1 litre) including all provisions of sampling, packing, sealing and labeling as specified and including handling charges etc. all as per specifications.

20

-

-

... More
Conducting cross borehole test comprising of five boreholes, one source and four receiver bore holes (two in X-direction and two in Y-direction) for evaluation of Dynamic modulli ,dynamic Poisson's ratio,shear and compression wave velocity variation with depth . The test shall be conducted as per IS 13372(Part 2):1992 (reaffirmed in 2001),ASTM:D4428,ASTM:D7400 at specified location and depth as per direction of EIC excluding cost of drilling of appropriate size bore holes required for test upto 50 m depth, which will be paid under relevant Item No.4 and 5 of this bill of quantity, PVC/Aluminum pipe casing, grouting and backfilling complete as per specifications and as directed by Engineer-in-charge.

3

-

-

... More
Backfilling of boreholes with 1:1 cement : bentonite/ mud grout as per specification. Operating of this item is must for satisfactory completion of work.

36

-

-

... More
Conducting Plate Load Test ( asper IS: 1888-1982 reaffirmed 2007) at foundation level using 600mm x 600mm test plate including cost of excavation, dewtering, all arrangement for reaction loading, testing depth, all as per the specifications and as directed by Engineer in Charge.

-

-

-

... More
Upto 5.00 Metre depth level.

2

-

-

... More
Carrying Electrical resistivity test for evaluating ground water level and its variation along with subsurface stratification,ground profiling by Schlumberger four electrode method including submission of comprehensive report with interpreted results for layer thickness and resistivities in triplicate. The test is to be conducted as per IS:1892 -1979(Reaffirmed in 2002), IS:15736-2007(Reaffirmed in 2012) covering whole plan area of building upto depth of exploration as specified & recommended by Engineer in charge below existing ground level.

3

-

-

... More
Carrying out Core cutter method (CCM) test (for fine grained cohesive soils) as per IS:2720(Part XXIX)-1975 (Reaffirmed 2005) to evaluate Bulkdensity,dry density.The test is to be conducted on one or more UDS(undisturbed sample) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

55

-

-

... More
Carrying out Sand replacement method test (for medium&coarse grained soil) as per IS:2720(Part XXVIII)-1974 (Reaffirmed 2010) to evaluate Bulkdensity,dry density.The test is to be conducted on one or more DS(disturbed sample )collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

65

-

-

... More
Conducting Pressure meter test in NX size borehole in soft rock & hard rock with electronic probe for pressure up to 200 bar or failure which occures earlier and submitting the test data and computed parameters (like Em,PL,Creep etc.)as per IS12955(Part-2)1990 reaffirmed in 2001. at specified bore holes .( One set of test consistes of testing at 4 elevations in boreholes)

-

-

-

... More
At depth corresponding to RQD-25%

60

-

-

... More
At depth corresponding to RQD-50%

60

-

-

... More
At depth corresponding to RQD-75%

60

-

-

... More
Carrying out Sand bath method Alcohol Method test as per IS:2720 (Part II)-1973 (Reaffirmed 2010) to evaluate Water content .The test is to be conducted on one or more DS (disturbed sample )collected from each borehole or alternate&staggered boreholes and representative of each soil stratum as directed by the EIC.

60

-

-

... More
Section II -Laboratory tests on Soil Determination of Grain size distribution,percent fines of soil sample by conducting Grain Sieve analysis & Hydrometer analysis as per IS:2720(PART 4) -1985(Reaffirmed in 2006) . The test is to be conducted on one or more DS(disturbed sample ) & UDS (undisturbed sample) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

-

-

-

... More
Sieve analysis.

60

-

-

... More
Hydrometer or Pipette analysis

60

-

-

... More
Determination of soil classification,identification, evaluating percent fines as per IS:1498-1970(Reaffirmed in 2007). The test is to be conducted on one or more DS(disturbed sample) & UDS(undisturbed sample) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC, submission of test result as directed by EIC.

60

-

-

... More
Determination of Specific gravity, natural moisture content, voids ratio by conducting Density bottle method , Pycnometer method test as per IS2720(Part III/Sec1 or Sec2 )-1980 (reaffirmed in 2002)along with submission of test result as directed by EIC. The test is to be conducted on one or more DS(disturbed sample ) &UDS(undisturbed sample) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

60

-

-

... More
Water content from UDS by oven drying method as per IS : 2720(Part II) - 1973.

60

-

-

... More
Determination of Liquid limit, plastic limit atterberg limits and plasticity index of soil sample as per IS: 2720 (part5)-1985 Reaffirmed in 2006. The test is to be conducted on one or more DS(disturbed sample ) &UDS(undisturbed sample) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

60

-

-

... More
Determination of Shrinkage limit and shrinkage ratio of soil sample as per IS: 2720 (part-VI)-1972 Reaffirmed in 2001. The test is to be conducted on one or more DS(disturbed sample ) &UDS(undisturbed sample) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

60

-

-

... More
Carrying out Chemical analysis of sub soil samples to evaluate chemical characteristics of soil including pH,Sulphates(SO3&SO4),chloride and nitrate contents,organic matter, chemicals salinity and any other chemicals harmful to the foundation material as per IS: 2720 (Part 23,24,25,26 and 27) in an approved laboratory, complete as per specifications, including submission of test report .The test is to be conducted on one or more DS(disturbed sample) &UDS(undisturbed sample) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

60

-

-

... More
Same as in Item No. 25 above, but on 2:1 water:soil extract of the soil samples, giving sulphates as SO3 only.

58

-

-

... More
Chemical analysis of sub-soil, ground water&soil-water mixture as per relevant IScodes for determining chemical characteristics of water&soil such as colour,odour,turbidity ,pHvalueand specific conductivity at 25deg.Cand chemical contents such as carbonates,sulfates (both SO3and SO4), chlorides,nitrates,organic matter and any other chemical harmful to the foundation material . The test is to be conducted on one or more water samples collected from each borehole. water samples, including alkalinity sulphates as SO3 & SO4, chlorides, Nitrates, pH, turbidity, flouride, free and saline ammonia content, hardness etc., organic content ,soluble salt content and any other chemical & harmful chemicals . etc

60

-

-

... More
Conducting In-situ Pump-in Permeability test by double packer cyclic method in weathered and hard rock of 3m test section upto maximum presssure of 10Kg/sq.cm,all as per IS: 5529 (Part 2)-2006 to evaluate permeability.Each unit of this item shall consist of a series of tests with pressure of three(3) equal increments to the maximum and three(3) equal decrements etc., as per specifications. The test is to be conducted in specified boreholes at specified depths as per direction of EIC.

33

-

-

... More
Carrying out Direct Shear Test (UU,CU,CD) (for cohesionless soil) as per IS:2720 (Part 13)-1986 (Reaffirmed 2002) to evaluate Cohesion and Angle of internal friction (CD test), Shear Strength, Shear Modulus (Static), ELastic Modulus (Static) Coeficient of Consolidation (for CD test) .The test is to be conducted on one or more UDS (undisturbed sample ) collected from each borehole or alternate&staggered boreholes and representative of each soil stratum as directed by the EIC.

-

-

-

... More
Cohesion and Angle of internal friction

53

-

-

... More
Shear Strength

53

-

-

... More
Shear Modulus

53

-

-

... More
Elastic Modulus

53

-

-

... More
Coeficient of Consolidation

53

-

-

... More
Triaxial compressive Strength Test on undisturbed soil samples or on soil samples compacted to specified density on cohesive as well as cohesionless soil. Tests to be conducted asper IS:2720 (Part11)-1993 (Reaffirmed in 2002).

-

-

-

... More
Unconsolidated Undrained

55

-

-

... More
Consolidated Undrained, including bore water pressure measurement

55

-

-

... More
Unconfined compressive strength test as per IS: 2720 (Part10) 1991 (Reaffirmed in 2006) on undisturbed soil samples or soil samples compacted to specified density to determin safe bearing capacity, compressive & shear strength of soil.

53

-

-

... More
Consolidation tests on undisturbed soil samples or on soil samples compacted to specified density, giving full test results including unit weights, specific gravity, e-log p curve, virgin curve, P0, eo, Cc, Cv and mv for all pressure increments etc. (Tests without presentation of these results will not be paid for.)

53

-

-

... More
Carrying out Proctor Density Test as per IS:2720 (Part 7)-1980 to evaluate Bulk density, Dry Density, Optimum Moisture Content. The test is to be conducted on one or more DS (undisturbed sample ) collected from each borehole or alternate & staggered boreholes and representative of each soil stratum as directed by the EIC.

55

-

-

... More
Evaluation of Liquefaction Potential based on the other tests conducted in laboratory on undisturbed or remoulded samples of soil. ' NOTE: The UDS shall correspond to each soil stratum. Hence can be decided only after receipt of borelog data. Test to be done in each or alternate boreholes and 2 samples assumed per borehole.and as decided by the design Engineer.

55

-

-

... More
Section (III) Laboratory tests on Rock Carrying out petrographic examination of rock sample as per ASTM: C-295 for determination of core recovery, rock quality designation and rock mass rating in each borehole, for each rock stratum and submission of test result as directed by EIC.

55

-

-

... More
Determination of water content, Porosity and density [saturated surface dry &wet condition], specific gravity by conducting Caliper,Buoyancy,Mercury Displacement techniques as per IS: 13030-1991(Reaffirmed 2001) . The test is to be conducted on one or more rock sample representative of each rocky stratum collected from each borehole.

55

-

-

... More
Conducting Water absorption test as per IS: 1124-1974( Reaffirmed 2003) to evaluate water absorption . The test is to be conducted on one or more RS representative of each rocky stratum collected from each/alternate borehole.

55

-

-

... More
Carrying out Unconfined compression strength (UCS) test on soaked & unsoaked samples for determination of Poisson's ratio,modulus of elasticity ,shear modulus as per IS:9221-1979(reaffirmed 2001)along with unconfined compressive strength,safe bearing pressure of rock sample as per IS: 9143-1979(reaffirmed2001)in each borehole and submission of test result as directed by EIC.

-

-

-

... More
without saturation

55

-

-

... More
with atleast 7 days saturation

55

-

-

... More
Brazilian test on rock core as per IS:10082-1981 (Reaffirmed 2001)to evaluate tensile strength, in boreholeand submission of test result as directed by EIC.

55

-

-

... More
Detremination of Safe bearing pressure by conducting Point load strength test of rock sample as per IS:8764 - 1998 (reaffirmed 2008) & IS:10082 - 1981 (reaffirmed 2001) in each borehole at 3.0m,6.0m,9.0m,12.0m,15.0m, 18.0m,21.0m,24.0m,27.0m,30.0m and submission of test result as directed by EIC.

55

-

-

... More
Carrying out triaxial compression test for determination of triaxial compressive strength, cohesion and angle of internal friction as per IS:13047-1991(reaffirmed 2010) along with modulus of elasticity, stress-strain behavior as per ISRM- SM 1983 ,ASTM:D2664 and submission of test result as directed by EIC.

55

-

-

... More
Construction of pillars at as directed in Brick work in CM 1:5 of size 345 mm X 345 mm with plain cement concrete of 1:5:10 base coarse of 100 mm thick. Brick work shall be 200 mm height below ground level and 400 mm height above ground level .Top surface of the pillar shall be plaster with CM 1:5 12 mm thick with floating coat of neat cement slurry and marking the co-orinates in paint. The rate includes required earth work etc complete .The work shall be as per specification and as per direction of Engineer in charge

45

-

-

... More
Section (IV) Reports 'Preparation and submission of Three (3) hard & soft copies(on DVD) of Draft reports as specified followed by Five (5) hard copies of Final report of Geotechnical Investigations as detailed in specifications along with 6 soft copies of the same on the DVD. 'Note: 1. Final Report to be submitted shall include recommendations for the geotechnical investigation consisting of deliverables as per FORMAT - 2 which will be issued to the successful bidders. '2. Geotech Investigations for Soils and Rock will be carried out to evaluate the different type of test values as per FORMAT - 1 which will be issued to the successful bidders.

5

-

-

... More
PART-B-Geophysical Investigation: Conducting streaming potential method consists of measuring the electrical potential by flowing water within a structure or subsurface till existing Aquifer. The tests at each locations shall be conducted as a series of tests with appropriate electrodes array. All as per the specification and as directed by Engineer. Setting up equipment at each location including moves between positions, locating and marking the location on the ground by actual survey (by using precision position instruments such as GPS and Total Station), setting up all field test equipment, making area good for setting up etc.

1100

-

-

... More
The report should provide a clear explanation of the data interpretation methodology, including how raw data was processed and any assumptions made. All raw and interpreted data, including measurements and test results, must be provided in a readable digital format, along with any supporting data files. It should summarize the key findings, such as the groundwater table depth, direction of groundwater flow, and aquifer characteristics, supported by relevant charts, tables, and visual aids. The report must also include an analysis of the groundwater table depth at the subject site, based on field measurements or other reliable data sources, and determine the direction of groundwater flow using appropriate hydrological methods. Additionally, the report should outline the experimental procedures used to assess the aquifers' hydrological parameters, including the instruments and techniques for data collection, as well as the steps taken to analyze groundwater movement, permeability, and storage properties.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.