Bhabha Atomic Research Centre Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Bhabha Atomic Research Centre - BARC Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date2 Dec 2024
Closing Date17 Jan 2025
Tender Amount₹ 3,84,59,000
AI Insights
Technical
Technical
Financial
Additional Eligibility
Work Experience Requirements
... View More
Bidders must have satisfactorily completed three similar projects valued at no less than ₹181.53 lakhs each; or two similar projects valued at no less than ₹272.29 lakhs each; or one similar project valued at at least ₹363.05 lakhs. These projects must have been completed within the last seven years. If projects weren't for Central/State Government, Public Sector Undertaking, or Central Autonomous bodies, income tax records must be provided upon request. Similar work includes any civil work with chemical-based waterproofing, executed in India. Proof of payment from clients is required.
Class Of Bidder
... View More
Bidders must meet the mandatory Local Content (LC) requirement to qualify as a 'Class I Local Supplier' or provide clarification and declaration from the relevant government department/ministries to demonstrate eligibility as a 'Class II' local supplier.
Bid Capacity
... View More
Bidding capacity must equal or exceed the estimated project cost. Bidding capacity is calculated as: [A x N x 2] – B, where A is the maximum value of works executed in any one year during the last five years (including completed and in-progress works), N is the number of years prescribed for project completion, and B is the value of existing commitments and ongoing works to be completed during the project's timeframe. Supporting data must be provided.
Technical Capacity
... View More
Assessment considers technical capabilities relevant to the work, nature of works executed in the last seven years, organizational structure, necessary resources, time and quality consciousness, history of extraneous claims and disputes, site planning ability, and tendency to sublet work.
Technical Specification
... View More
Technical specifications may suggest makes and brands as general recommendations. Bidders can suggest alternatives, subject to achieving performance parameters and providing substantiating technical details. The pre-bid clarification stage is for suggesting alternate makes/brands. After award, delays due to alternate make acceptance/rejection are the contractor's responsibility. Extra cost due to superior specifications/performance is not payable.
Costs
EMD
₹ 9,07,633Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BARC_837512_1Bid Award Id
ViewTender No
BARC/CED/ET/38/2024-2025 Dated 25/11/2024Tender Authority
Bhabha Atomic Research Centre ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
PROFORMA OF SCHEDULES ET38 2024-2025
BOQ Items
... More
Dismantling old plaster / skirting carefully , raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead
200
-
-
... More
Providing structural repairs in old damaged concrete structures / surfaces with approved Polymer with following operations 1) Removal of loose/Spalled or damaged concrete by chipping and cleaning the concrete surface and reinforcement steel with wire brush and with water 2) Cleaning the re bars with Acetone for complete rust removal and washing with water to make the surface clean. 3) Applying protective coat / bond coat using polymer and cement in the proportion of 1; 1.5 (1 part of polymer and 1.5 parts of cement in synthetic enamal paint like consistancy with brush 4) Reinstate the area with polymer modified mortar in layers of maximum 20 mm with the proportion of Cement 50 Kg : washed and dried river sand 87.50 kg ; silica sand 37.50 Kg. mixed with 10 litres of Polymer (or 1 Kg cement : 1.75 kg washed and Quartz Sand ; 0.75 Kg silica sand : 200 ml polymer) 5) If thickness of repair exceeds 20mm , after every 20 mm thick repair, bond coat as per 2 above to be applied and further thick of repair to be continued for each layer. This work is inclusive of all materials, labour, complete all as directed at site using approved polymer suitable for structural repair shall be used).
Note : (1) Scaffolding will be paid separately under relevant item.
(2) This item shall be executed as per the directions of the Engineer-in charge and measurements for any polymer repair work covered/ required under Item No 2 & 3 will not be carried out under this item and whereas the same shall be deemed to be included in the quoted rates of Item No. 2 & 3 above.
300
-
-
... More
Providing SFMC Micro concrete for strengthening of structural members including mixing, pouring, curing as per manufacturer specifications and as directed by the Engineer-in-charge. Using 100% SFMC.
Note : This item shall be executed as per the directions of the Engineer-in charge and measurements for any polymer repair work covered/required under Item No 2 & 3 will not be carried out under this item and whereas the same shall be deemed to be included in the quoted rates of Item No. 2 & 3 above
2000
-
-
... More
Providing 20 mm thick plastering using Ready mix external plastering compound of approved make for external faces of brickwork / concrete surfaces including preparation of the surface, curing, cleaning scaffolding up to 10 metres height complete.all as per specifications including forming drip moulds wherever necessary and as directed by the Engineer-in-charge.
Note :This item shall be executed as per the directions of the Engineer-in charge and measurements for any polymer repair work covered/required under Item No 2,3 & 5 will not be carried out under this item and whereas the same shall be deemed to be included in the quoted rates of Item No. 2 ,3 & 5 above.
200
-
-
... More
Extra for Plastering exterior walls of height more than 10 m from ground level (Plastering works above 10 metres height from Ground level alone will be measured in this item).
200
-
-
... More
Providing and Laying cement concrete 1:2:4 in super structure (1 cement, 2 crushed sand, 4 brick aggregates 20 mm to 40 mm) for filling sunken floors of toilet bath & kitchen admixed with proprietary water proofing compound as per manufacturer's specifications and approved by Engineer-in-charge including scaffolding, consolidation, finishing curing etc.
25
-
-
... More
Lead charges for lead Exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
Debris Beyond 2 Km but up to and including 3 km. Note: The rate is applicable for NET Quantities arrived at after making deduction for voids @ 30% from corresponding TRUCK Measurement
600
-
-
... More
Providing and fixing double tubular scaffolding system using H-frames with cup lock type on the exterior side upto seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevational area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding. Note: (1) The elevational area of the scaffolding shall be measured for payment purposes. (2) For all items under this work order which require scaffolding, the Scaffolding will be measured and paid only once, irrespective of duration of scaffolding for the entire work and shall not be seperately paid for each item. (3) Scaffolding shall be removed only after completion of all works. (4) The scaffolding once provided shall be removed after the entire work is neatly completed in all respects and payment shall be made after completion of all works and measurement will be taken only once.
(5) Necessary aluminium/ M.S. ladder/staircase module shall be provided at the cost of the contractor, upto the full height of scaffolding at required locations around the building to enable department Engineer/Supervisor to closely supervise the repair work at heights.The cost of the same shall be deemed to be included in the quoted rate. (6)Contractor has to make arrangement at his own expenses for temporary sealing of windows/openings with plywood, to avoid breaking of windows panes, and covering outdoor ac units during the progress of work (7) Wherever scaffolding has to be erected over existing lawns or flowerbeds, then all such locations shall be completely covered with tarpaulins before erecting scaffolding. (8) Safety nets and nylon screens shall be provided for full height of scaffolding to prevent falling of debris and the cost of the same shall be deemed to be included in the quoted rate. (9) Scaffolding shall be erected as per the provisions of IS 3697 (10) All safety precautions and measures shall be taken as per BARC Construction safety Manual.
1000
-
-
... More
Supplying man power alongwith necessary pans, spades, brooms, shoval, pickaxe, punjas, ropes, small specials spade, rain coats, safety shoes etc., minimum two number of labour per day upto maximum any number of labours and when decided by Engineer-in-charge to work for eight hours per day or monsoon peiod to carry out the cleaning of chocked drain gratings grills / hume pipes/chamber/Gully traps, footpath by removing the dry leaves silt etc., and also carry out seasonable departmental work/ miscellaneous works allotted by Engineer-in- charge from time to time.
300
-
-
... More
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works, and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note :
(1) Each Job shall be carried out by one qualified Degree holder with 2 (two ) year experience or Diploma holder with 5 (five) year experience (Licentiate in Civil/Construction Engineering / Technology) conducted by Board of Technical Examinations / University/ Autonomous Govt / Govt recognized recognized Polytechnic/ Institute. (2) Deployment: The contractor shall deploy one Engineer for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the Engineer will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account.
(3) Period of work: The contractor shall carry out number of Jobs per month as directed by Engineer-In-Charge.
(4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one Engineer exclusively for the particular job.
(5) Engineer should be engage after scrutiny by EIC of CED,BARC and approved by Competent authority and the deployed engineer will report to BARC Engineer/EIC. (6) The minimum notice period before the change of engineer is 1 (one) month; failing which a compensation, for not providing technical support, of Rs. 1693/- per day shoftfall in notice period will be levied on the contractor.
72
-
-
... More
Carrying out Data Entry operations and assisting departmental Officer / Engineers, preparation of monthly and quarterly statements, dispatching and delivering documents/file movement and maintaining registers and documents, checking/preparation of agreements etc. as instructed by Engineer-In-charge.
Notes :
(1) Qualification: Each job shall be carried out by one data entry operator having minimum HSC pass (12th Standard) with complete knowedge of computer (like MS office etc.) and should also be well conversant in English and Hindi language. (2) Deployment : The contractor shall deploy one Data entry operator for each job as Single Day work for 6 working days per week for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. (3) Period of work: The contractor shall carry out number of Jobs per day as directed by Engineer-in -Charge.
(4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one Data entry operator exclusively for the particular job.
(5) The Data entry operator should be engaged after scrutiny by EIC of CED, BARC and approved by Competent authority and the deployed Data entry operator will report to BARC Engineer/ EIC. (6) The minimum notice period before change of Data entry operator is 1 (one) month; failing which a compensation, for not providing technical support, of Rs. 1,151/- per day of shortfall in notice period will be levied on the contractor.
1000
-
-
... More
Providing and fixing anodized aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections / Z sections and other sections of approved make conforming to IS 733 and IS 1285 fixed with rawl plugs and screws or with fixing clips or with expansion hold fastners including necessary filling up of gaps at junctions, at top, bottom and sides with required PVC / neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically whereever required including cleat angle, aluminium snap beading for glazing / panelling, C.P brass / stainless screws all complete as per drawings and and directions of Engineer-in-charge including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of PVC / neoprene gasket required filling the gaps using silicon grout sealent etc. (fittings glazing and panelling shall be paid for separately)
Anodised Aluminium sections (Minimum anodizing thickness of 15 micron) Notes : 1) The rates for aluminium is inclusive of all fastners required for fabrication and fixing in the walls. 2) All joints shall be of mittered Joints.
3) A long M.S. rod threaded at both ends to be provided in all aluminium door shutters in Top & bottom Horizontal members internally connecting Vertical members and fixed with M.S washers & nuts. 4) Only Aluminium members alone shall be measured and paid for.
300
-
-
... More
Extra over for Item No. 15 for colour anodizing.
300
-
-