Bhabha Atomic Research Centre Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Bhabha Atomic Research Centre - BARC Tender

Works
Eprocure
Opening Date4 Sep 2024
Closing Date18 Sep 2024
Tender Amount₹ 4,54,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2 seating cum 1 standing twister

1

-

-

... More
Fun walker double

1

-

-

... More
Chest press cum shoulder press

1

-

-

... More
Leg press double

1

-

-

... More
Shoulder twril double

1

-

-

... More
Shoulder press double

1

-

-

... More
Providing, Fixing, installation of multi play fun system (MPFS) consisting of following components in it. The scope of work includes designing, providing, execution, fixing and installations of multi play fun system at BARC staff colony Tarapur as per specification and direction of Engineer- In -Charge.

-

-

-

... More
Duplex multi play fun system consisiting of following components a) Roto tile canopy 1 No b) Roto house canopy with chimany 1 No c) Roto slant bridge 8' ft long 1 No d) Roto cross railing 1 No e) Roto cross & zero railing 1 No f) Roto single slide entry 2 Nos g) Roto shrimp slide 3' ht 1 No h) Roto zigzag slide 7' ht 1 No i) Roto spiral tube slide 9' ht 1 No j) G staircase 3' ht 1 No k) FRP rock climber 7' ht 1 No l) Army net climber 1 No m) Double post swing 2 Nos n) Roto palm tree 2 Nos o) Roto sparrow 1 No p) Roto honey bee 1 No q) Roto square deck platform 3' ht (4x4) 1 No r) Roto square deck platform 7' ht (4x4) 1 No s) Roto square deck platform 9' ht (4x4) 1 No

2

-

-

... More
Roto multi play fun system consisiting of following components a) Roto house canopy with chimney 1 No . b) Roto arch canopy 1 No . c) GI trapizium platform 5' ht (4x4) 1 No . d) Roto split levl ladder 1 No . e) Roto step bridge 8' ft long 1 No . f) Roto single slide entry 2 Nos . g) Roto zigzag slide 5' ht 1 No . h) Roto straight open slide 5' ht 1 No . i) Roto spiral tube slide 7' ht 1 No . j) Roto curve slide 5' ht 1 No . k) FRP ladder 7' ht 1 No . l) FRP rock climner 7' ht 1 No . m) Net climber 5' ht 2 Nos . n) Double post swing 2 Nos . o) Roto palm tree 1 No . p) Roto sparrow 1 No . q) Roto leaf 1 No . r) Roto sunflower 1 No . s) Roto square deck platform 5' ht (4x4) 1 No . t) Roto square deck platform 7' ht (4x4) 1 No . u) Loop climber 1 No .

2

-

-

... More
Design, supply & installation/surfacing of EPDM (Ethylene Propylene Diene Monomer) M- Class rubber of 30 mm thickness on concrete surface of open gym equipment area etc. complete as per specifications and directions of Engineer-In-Charge.

8100

-

-

... More
Providing and fixing of following children play eqipment as per details and as per drawing shown in Annexure etc. complete in the garden areas of BARC Staff Colony, Tarapur as per the specifications and directions of Engineer-In-charge.

-

-

-

... More
FRP roller slide 1.5 meter height

20

-

-

... More
double arc swing

20

-

-

... More
Standard See-Saw

10

-

-

... More
Four seater Merry Go Round

6

-

-

... More
Digging in ordinary soil to a depth of 0.30m including breaking of clods removing & disposal of stones, roots & other debris to a initial lead of 50 m and stacking the same.

3053

-

-

... More
Soil preparation works by rough dressing excavated area, spreading of red soil in layer of 0.10 m (excluding cost of red soil)spreading of vermicompost manure over red soil @ 2Kg/m2 (Excluding cost of vermicomost)mixing of soil & manure thoroughly to a depth of 0.25m consolidating with water (excluding cost of water ) and fine dressing as per specifications and directions of Engineer-In-charge.

10180

-

-

... More
Supply & plantation of ornamental edge & hedge plants by excavation of trenches of 0.50 m width or shapes as per design of depth 0.30 m adding vermi compost @ 2 Kg/M2(excluding cost of vermicompost ) , mixing of soil & manure , filling of mixed soil in trenches, consolidating it with water, dressing, supply of well grown true to type hedge plants as per Annexure -I at plantation site , planting of hedge plants followed by watering ( excluding cost of water ) , etc .complete as per specifications and directions of Engineer-In-Charge.

3420

-

-

... More
Maintaining the newly planted edge and hedge plants for Eighteen month by regular watering of plants every alternate day by hose pipe / rose can , earthing up , water basin preparation and weeding once in a month , clipping of hedges to give desired shape as and when required etc complete as per specifications and directions of Engineer-In-Charge.

61560

-

-

... More
Providing and plantation of healthy, rooted true to type Paspalum lawn grass (Paspalum notatum) in slabs/ tiles of size 2feet x 1 feet or other suitable size by placing it perfectly on finely dressed soil using turf plastering method, filling the joints of lawn slabs with mixture of soil and manure in 2: 1 proportion (excluding cost of soil and manure) ramming it properly with wooden log,watering once immediately after plantation etc. complete as per specifications and directions of Engineer - In - Charge.

7830

-

-

... More
Maintaining the newly planted lawn areas for 18 months regularly by watering the lawn area every alternate day by hose pipe & sprinkler system, trimming/moving of lawn areas by kerosene/petrol/diesel operated mechanical lawn mover once in a month , weeding out unwanted weeds, grass etc. from lawn area once in fortnight & sweeping of lawn areas once in a week for including removal of paper plastic waste, dried leaves etc. & its disposal at designated places within lead of 2.0 km as per directions & specifications of departmental engineers. (Note The maintenance period will start after complete plantation of lawn areas in item no 9 ).

140940

-

-

... More
Supply & plantation of ornamental shrubs of height 0.3 m to 2.0 m height ( as per list attached ) by excavation of pits of size 0.60 m dia and 0.60 m deep , removing of stone debris etc. from excavated area to a level of 50 m, adding vermicompost @ 2 kg / pit mixing of soil & manure in pit & consolidating it, dressing , supplying of well grown healthy shrubs as per Annexure – II at plantation site, planting of shrubs in pit, watering once ( excluding cost of water ) stacking of plants if required with bamboo sticks etc. complete as per specifications and directions of Engineer-In-Charge.

1500

-

-

... More
Maintaining the newly planted shrubs for Eighteen month by regular watering of shrubs every alternate day by hose pipe / rose can , earthing up , water basin preparation and weeding once in a month , stacking of plants as and when required with bamboo poles of height up to 2.0 m etc complete as per specifications and directions of Engineer – In – Charge

27000

-

-

... More
Providing and plantation of ornamental trees by excavation of pits of size 0.60 m dia. and 0.60 m deep, removing of stone debris etc. from excavated area to a level of 50 m, adding vermicompost @ 2 kg / pit mixing of soil & manure in pit (excluding cost of vermicompost & Red soil ) & consolidating it, plantation of well grown healthy trees of variety mentioned in specification at plantation site in pit, watering once ( excluding cost of water ) stacking of plants if required with bamboo sticks of suitable height etc. complete as per specifications and directions of Engineer-In-Charge.

120

-

-

... More
Maintenance of trees for period of 18 months by watering every alternate day, ring making & weeding once in a month etc. complete as per directions of engg. In charge by as per specifications and directions of Engineer-In-charge.

2160

-

-

... More
Supplying ,transporting and stacking of good quality red garden soil free from stones, murrum, weeds ,stubbles and other foreign material etc. at site with all leads & lifts as per directions of Engineer-In-Charge. ( Note : red soil measured in stacks will be reduced by 20 % for payment.)

2542

-

-

... More
Supplying of well rotten decomposed vermicompost manure in sealed bags of 50 kg capacity, free from clumps, sand & other foreign material etc. at plantation site. The sample of vermicompost should be got approved by the Engineer In Charge before supply of material .

78

-

-

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of Nost more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge (a) From 0.00 to 1.50 m depth from Average Ground Level

450

-

-

... More
Lead charges for lead exceeding 1 KM but Nost exceeding 2 KM, by mechanical transport including loading, unloading, stacking / levelling etc. (a) for soil

227

-

-

... More
Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge 30mm With outside material

900

-

-

... More
Murum filling under floors of specified thickness in layers of not more than 150 mm thickness including supplying required materials and consolidation etc. complete (Murum to be brought from outside campus of BARC) Note: a) The contractor's quoted rate shall include royalty as per the prevailing government rates .Any increase in prevailing rate of royalty shall be borne by the contractor at no extra costto the owner b) Only compacted volume will be measured and paid )

135

-

-

... More
Providing and laying in position cement concrete of 1:3:6 (1cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels and as directed by the engineer.

90

-

-

... More
Providing , centering ,shuttering Form work by using steel plates, timber planks for PCC and miNosr structures including necessary strutting, proping, without staging, supports etc and deshuttering the same after the specified time all as per drawings,specifications and as directed by the Enginner-in-charge

12

-

-

... More
Providing and fixing of rigid ISI marked socketed Unplasticised PVC pipes along withall required fittings and accessories etc.complete . The job also includes jointing of pipes with UPVC solvent cement solution ,trenching refilling and testing and testing the joints complete as per specifications and directions of Engineer-In-Charge.

-

-

-

... More
uPVC SELFIT pipes 140 mm diameter , 6 Kg/cm2

140

-

-

... More
uPVC SELFIT pipes 110 mm diameter , 6 Kg/cm2

240

-

-

... More
uPVC SELFIT pipes 63 mm diameter , 6 Kg/cm2

150

-

-

... More
uPVC SELFIT pipes 50 mm diameter , 6 Kg/cm2

150

-

-

... More
uPVC SELFIT pipes 40 mmdiameter , 6 Kg/cm2

150

-

-

... More
Providing , fixing & commissioning of following valves at proper location in irrigation system

-

-

-

... More
PVC ball valve 110 mm diameter ,

8

-

-

... More
PVC ball valve 63 mm diameter ,

12

-

-

... More
3/4 " barrel nipple piece thread outside of 1 feet length

30

-

-

... More
Brass ball valve 3/4 " along with 3/4 " G.I. Bend

30

-

-

... More
Providing services for display of potted plants in various location, shifting of potted plants from various location to nursery and from nursery to various location, watering of potted plants in various location, plantation of plants as and when required,preparation of flower vase , bouquets , display of flowers , Shifting/ rearrangement of material as and when required, dressing and leveling of areas as and when required, preparation of new plants by plant propagation methods in nursery area as and when required ,segregation and composting of garden waste and executing any other horticultural works as directed by deparment engineers etc. complete as per specifications and directions of Engineer-In-Charge.

624

-

-

... More
Resurfacing of basketball court by providing and applying 5 layer uv resistant ,water resistant all weather suitable synthetic acrylic court flooring on levled concrete /asphalt surface . etc. complete as per specifications and directions of Engineer-In-Charge.

8400

-

-

... More
Renovation of damaged / weed infested lawn areas by uprooting of rank vegetation ,and weeds by digging the areato a depth of 60 cm ,removal of all weeds and other growth along with roots by forking repeatedly, breaking of clods, rough dressing ,flooding with water , uprooting the fresh growth after 10 to 15 days and then fine dressing , for planting of new grass including disposal of debris with all leads and lifts, spreading of red soil(excluding cost of red soil ) ,applying vermicompost@2Kg /m2 (excluding cost of vermicompost ) mixing thoroughly,providing and grassing with selection No 1 doob grass including watering and maintenance of lawn for 30 days or more till grass form thick lawn free from weeds and fit for mowing including spreading of red soil in depressions ( if any )if needed etc. complete as per specifications and directions of engineer in charge .

23497

-

-

... More
Hiring of hydraulic excavator for site clearance works by cutting & uprooting of wild thorny bushes ,excavation of pits for waste disposal ,filling back pits of waste from etc. complete as perspecifications and directions of Engineer-In-Charge .

80

-

-

... More
Hiring of dumper at BARC plant site as and when required during contract period for transporting & dumping excavated soil at designated places, disposal of debris ,uprooted plants ,root portion etc. at designated places within a lead of 3.0 km etc. complete as per specifications and directions of Engineer -In-charge

160

-

-

... More
Hiring of 10.00 MT capacity Mobile crane for shifting of material , lifting of tree logs ,etc. complete. The entire work shall be done as per direction & specifications of engineer in charge .

24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.