Airports Authority Of India Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Airports Authority Of India - AAI Tender
Eprocure
Opening Date18 Sep 2020
Closing Date29 Sep 2020
Tender Amount₹ 1,87,41,560 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 4,50,320Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_AAI_57692_1Bid Award Id
ViewTender No
AAI/PUNE/ENGG-C/GRANITE FLOORING/2020Tender Authority
Airports Authority Of India ViewPurchaser Address
-Website
http://https://www.aai.aero/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Upgradation of flooring in Terminal Building at Pune Airport.
Upgradation of flooring in Terminal Building at Pune Airport.
BOQ Items
... More
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.
a) Granite of any colour and shade
Area of slab upto 0.50 sqm
(Note: Agency has to quote considering basic rate of stone Rs. 1600/- per sqm landed at site excluding GST. Any difference in rate of stone is payable or recoverable separately. Sample shall be approved by E.I.C.)
25
-
-
... More
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including grouting the joints with white cement and matching pigments etc., complete.
a) Size of Tile 600x600 mm
100
-
-
... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
350
-
-
... More
Fixing the frame work with available partition material with covering of frame work from available 6mm ply in one side only with necessary cutting and jointing with screws and necessary materials etc. all Complete as per direction and satisfaction of Engineer - in - Charge. (Note: Alluminium sections and 6mm ply only will be supplied by AAI)
100
-
-
... More
Removing of existing aluminum partition work for doors, windows, ventilators and partitions and fixing the frame work with same partition material with covering of frame work from 6mm ply in one side only with necessary cutting and jointing with screws and necessary materials etc. all Complete as per direction and satisfaction of Engineer - in - Charge.
500
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements