Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Western Railway - WR Tender
Telecommunication Services
Ireps
Opening Date7 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 15,23,647.67
Costs
EMD
₹ 30,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
SandT-RTM-24-Tele-10-RATLAM DIVISION-S AND T/WESTERN RLYTender No
SandT-RTM-24-Tele-10Tender Authority
Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of 6 Pin Emergency Socket as per RDSO/SPN/TC-42/20. Suitable to fix in existing Emergency socket box.
5
306
1534
Supply of LAN Extender with 4 port Ethernet with 230V AC/48V DC working with AC Power cord, as per RDSO Specification No. RDSO/SPN/TC/82/2020 rev. 2.0 or latest.
2
17424
34849.32
Supply of Warning tape. 1MM x 150MM x 1 Mtr "warning: S&T cable below" Orange Colour
196
22
4494.28
Supply of HDPE Ducts 40/33 mm dia as per RDSO/SPN/TC/45/2013 Rev 2.0 with latest amendments as available. Each km of HDPE duct should have 2 no End Plugs, 2 no Cable sealing plugs, and 2 no plastic couplers slip fit/push fit type etc.
1600
47
75856
Supply of 2 x 24 fiber optic fiber splice straight joint enclosure (SJC) complete with all accessories. As per RDSO/SPN/TC/ 68/2014, Rev.3 or latest amendment.
8
3920
31365.36
Supply of Cable Route Locator/Tracer set suitable for detecting underground armoured OFC,Telecom and Signalling Cables with LCD graphics, Display active/passive modes and depth range of Model RD- 8200 of Radio Detection Ltd or superior
1
457399
457399.28
SUPPLY OF LEAD-FREE Solder Wire Non-Corrosive and activated flux core (SN 60-PB 40 ratio) 18 SWG. Running
2
1396
2792.48
Supply of OFC jointing RCC pits size 0.6m X 0.8X 1m. The material shall be supplied as per engineer in charge instructions.
4
6137
24550.2
Supply of Thermo shrink Universal Jointing kit for Quad Cable (for straight joints) as per RDSO spec IRS/TC-77/2012 revision 3 With latest Amd.
6
2622
15732.12
Supply of Half Round RCC pipes & collars of 150 mm internal dia (1 meter long) along with collars as per IS No. 458/2003 of NP type
25
203
5096.5
Supply of Warning tape. 1MM x 150MM x 1 Mtr "warning: S&T cable below" orange Colour
120
22
2751.6
Supply of digital transmission measurement set (TMS kit) complete with tone generator & DB meters as per specification no.IRS: TC 43- 87 with amendment no.1 or latest. APLAB/Anuvidyut Make Running
1
31278
31278.99
Supply of HDPE Ducts 40/33 mm dia as per RDSO/SPN/TC/45/2013 Rev 2.0 with latest amendments as available. Each km of HDPE duct should have 2 no End Plugs, 2 no Cable sealing plugs, and 2 no plastic couplers slip fit/push fit type etc.
1000
47
47410
Supply of 2 x 24 fiber optic fiber splice straight joint enclosure (SJC) complete with all accessories. As per RDSO/SPN/TC/ 68/2014, Rev.3 or latest amendment.
4
3920
15682.68
Supply of OFC jointing RCC pits size 0.6m X 0.8X 1m. The material shall be supplied as per engineer in charge instructions
2
6137
12275.1
Supply of 48V battery Charger for Telecom use as per RDSO/TL/23/99/Ver 4. o or latest in N+1 9 configuration using 3 Modules of 25A with automatic switching between the modules for two sets of 200AH Battery. It shall be equipped with surge and lightning protection of Class-B & C. Detail requirements attached in tender document.
1
69554
69554.69
Jointing of 4 / 6 quad /Signaling cable with Heat Shrinkable straight through Jointing Kit. All the 1 material required for the work are to be arrange by contractor himself at his own cost except Thermo shrinkable Joint Kit . After jointing the cable through test such as insulation test, continuity cable losses etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing, the contactor has to redo the joint free of cost.
6
1231
7390.68
Supply and installation of RCC cable route marker engraved and painted on both side along the route every 50mm and route diversion as per Drg. No 4014/00/CC4 or latest/ Stone marker. Running
25
485
12148.25
Excavation of trench 300 mm wide at the bottom and 1.2 mtr deep, in all normal of soils condition. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 4 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m.
1400
81
113792
Excavation of the cable trench in hard soil and/or Murrum soil mixed with boulders 300 mm wide at the bottom and 1.2 mtr deep or for less depth refilling the same with 1:3:6 CC. Running
200
143
28694
Labour assistance for SSE/JE in day-to-day works i.e., checking the curves/straight alignment of formation levels etc,. Carrying the tools& equipments etc,. Watch & ward during the course of execution of work as per the instructions of concerned SE/JE.(as per tender document)
90
638
57451.5
Blowing of OFC through HDPE duct & protective work (elicited in above item) already provided. Where it is not feasible to blow OFC due to curves, road/track crossings, bridges or for anyother reason, OFC shall be drawn or laid manually as per standard procedure. All the equipments and machinery required shall be 8 arranged by the contractor at his own cost. In case OFC is to be laid adopting 'Direct in trench' method then this item shall be paid as per accepted rate of this schedule.OFC and HDPE pipe shall be supplied by the railway. Blowing/Laying shall be started from one end and each drum laying shall be monitored after blowing/laying and before leaving the site, trace/cable parameters for all the fiber/ conductors shall be taken from one central location by contractor's engineer with his own OTDR , optic talk set/ measuring equipments with railway engineer.
1600
11
18096
Laying of HDPE pipe as per approved cable route plan in the excavated trench, taking due care while transporting and laying the same in the trenches or other protective works. Both the end of duct should be sealed with end plugs before laying and should remain sealed till blowing is done.
1600
4
6896
Splicing of laid under above items OFC cable and making the splice joint in dust free environment with contractor's own equipment and labour. Straight joint enclosure(SJC) is covered under schedule 'A' remaining all required materials,tools, plants shall be arranged by the contractor. splicing shall be started from 10 one end and each splicing shall be monitored after splicing and after closing the enclosure for all the fibers from one central location by contractor's engineer with his own OTDR and optic loss test set with railway engineer trace for the fibers shall be taken and signed jointly, if any fibred splice shows high loss/lossy event, the same shall be redone before completion of splicing work. The splice loss shall be as per the policy/technical circulars issued by the railways from time to time.
8
9840
78725.12
Installation of OFC jointing pits (RCC/PVC) size 0.6mx0.8mx1m.The material shall be supplied as per engineer in charge instructions.
4
1312
5248
End-to-end testing of all fiber of the optical fibred cable laid under the above items between 12 Station/Cable Huts/OC & other locations. All required equipment,tools, and plants shall be arranged by the contractor. Five number ofprint out of traces (containing all parameters) in folders must be supplied by the contractor. The OFC parameters/results, per kilometer link loss, etc., shall be as per the policy/technical circulars issued by the railways from time to time.
2
14345
28691.1
Horizontal direction drilling/boring without damage of surface road using Auger Machine/Manual. The bore shall be 150 mm dia & shall be done at the depth of minimum 1200 mm from the ground level. The 13 ground level shall be considered ignoring the bankheight of the bank of the road. The length of the bore shall be minimum 4 Mtrs long. this include insertion of different dia DWCpipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note:- Pipe will be supplied by railway. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall belaid cautiously so that it should not get damaged due to rough handling & pressure on cable Running
30
1331
39950.7
Jointing of 4 / 6 quad /Signaling cable with Heat Shrinkable straight through Jointing Kit. All the 1 material required for the work are to be arrange by contractor himself at his own cost except Thermo shrinkable Joint Kit . After jointing the cable through test such as insulation test, continuity cable losses etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing, the contactor has to redo the joint free of cost.
4
1231
4927.12
Supply and installation of RCC cable route marker engraved and painted on both sides along the route every 50mm and route diversion as per Drg. No 4014/00/CC4 or latest/ Stone marker. Running
12
485
5831.16
Excavation of trench 300 mm wide at the bottom and 1.2 mtr deep, in all normal of soils condition. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 4 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m.
400
81
32512
Excavation of the cable trench in hard soil and/or Murrum soil mixed with boulders 300 mm wide at the bottom and 1.2 mtr deep or for less depth refilling the same with 1:3:6 CC. Running
50
143
7173.5
Labour assistance for SSE/JE in day-to-day works i.e., checking the curves/straight alignment of formation levels etc,. Carrying the tools& equipments etc,. Watch & ward during the course of execution of work as per the instructions of concerned SE/JE.(as per tender document) Running
48
638
30640.8
Blowing of OFC through HDPE duct & protective work (elicited in above item) already provided. Where it is not feasible to blow OFC due to curves, road/track crossings, bridges or for anyother reason, OFC shall be drawn or laid manually as per standard procedure. All the equipments and machinery required shall be 9 arranged by the contractor at his own cost. In case OFC is to be laid adopting 'Direct in trench' method then this item shall be paid as per accepted rate of this schedule.OFC and HDPE pipe shall be supplied by the railway. Blowing/Laying shall be started from one end and each drum laying shall be monitored after blowing/laying and before leaving the site, trace/cable parameters for all the fiber/ conductors shall be taken from one central location by contractor's engineer with his own OTDR , optic talk set/ measuring equipments with railway engineer.
1000
11
11310
Laying of HDPE pipe as per approved cable route plan in the excavated trench, taking due care while transporting and laying the same in the trenches or other protective works. Both the end of duct should be sealed with end plugs before laying and should remain sealed till blowing is done.
1000
4
4310
Splicing of laid under above items OFC cable and making the splice joint in dust free environment with contractor's own equipment and labour. Straight joint enclosure(SJC) is covered under schedule 'A' remaining all required materials,tools, plants shall be arranged by the contractor. splicing shall be started from 11 one end and each splicing shall be monitored after splicing and after closing the enclosure for all the fibers from one central location by contractor's engineer with his own OTDR and optic loss test set with railway engineer trace for the fibers shall be taken and signed jointly, if any fibred splice shows high loss/lossy event, the same shall be redone before completion of splicing work. The splice loss shall be as per the policy/technical circulars issued by the railways from time to time.
2
9840
19681.28
Installation of OFC jointing pits (RCC/PVC) size 0.6mx0.8mx1m.The material shall be supplied as per engineer in charge instructions.
2
1312
2624
End-to-end testing of all fiber of the optical fibred cable laid under the above items between 13 Station/Cable Huts/OC & other locations. All required equipment,tools, and plants shall be arranged by the contractor. Five number ofprint out of traces (containing all parameters) in folders must be supplied by the contractor. The OFC parameters/results, per kilometer link loss, etc., shall be as per the policy/technical circulars issued by the railways from time to time.
1
14345
14345.55
Horizontal direction drilling/boring without damage of surface road using Auger Machine/Manual. The bore shall be 150 mm dia & shall be done at the depth of minimum 1200 mm from the ground level. The 14 ground level shall be considered ignoring the bankheight of the bank of the road. The length of the bore shall be minimum 4 Mtrs long. this include insertion of different dia DWCpipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note:- Pipe will be supplied by railway. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall belaid cautiously so that it should not get damaged due to rough handling & pressure on cable
20
1331
26633.8