Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Western Railway - WR Tender

Goods
Telecommunication Services
Ireps
Opening Date16 Dec 2023
Closing Date9 Jan 2024
Tender Amount₹ 37,36,975.63 
Notes
Download

Costs

Summary

Supply, Installation, Testing And Commissioning Of Telecom Material In Connection With ratlam Division: Ratlam-khandwa Section: (i) Providing Subway(rub) To Eliminate Manned level Crossings No. 197, 227,230,233 & 234(05 Nos.) (ii) Providing Subway(rub) To eliminate Manned Level Crossings No. 275,277 & 278. (iii) Providing Subway(rub) To eliminate Manned Level Crossings No. 237,240, 298 & Lc No. 01 & 02 Of Rau-dhd section(05 Nos.)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of E1 extender (24v at data logger end) with following specifications: operations on 2-wire 4 copper circuits using G'SHDSL'Driving range:6.5 km at 2048 kbps on 24 AWG(0.5mm dia)unloaded copper pair under error -free conditions. Power supply input-options for 230VAC, 48VDC, 24VDC or various combinations' Make:Cygnus/Anda/Team link or similar

4

18221

72886.04

... More
Supply of CAT-6 cable of Dlink, Digisol, Network, paramount, polycab, organic, Molex,securenet or Lucent make (with identification mark/ferrules etc.)

610

20

12700.2

... More
Supply of 6 Pin Emergency Socket as per RDSO/SPN/TC-42/20. Suitable to fix in existing Emergency socket box.

35

306

10738

... More
Supply of LAN Extender with 4 port Ethernet with 230V AC/48V DC working with AC Power cord, as per RDSO Specification No. RDSO/SPN/TC/82/2020 Rev. 2 or latest.

3

17424

52273.98

... More
Supply of Analog Earth Tester, 4 terminal (Dual Range), metal Body, and Rated Ohms 0-10-100 8 Ohms, as per IS Specification 9223/1989 suitable for measuring Earth Resistance along with accessories - 4 Nos. M.S. spikes, (Not less than 15 mm diameter and 750 mm in length), 4 Nos. reels of flexible wire 0.5 sq.mm. multi- strand copper wire 20 meter each along with one end crocodile clamp & another side terminal connector suitable for connecting with Earth Tester., hammer, 1 No. high-quality canvas bag/carrying case Make - Motwane, Rishabh, Fluke, Megger, CIE, Shanti.

1

4572

4572.56

... More
Supply of HDPE Ducts 40/33 mm dia as per RDSO/SPN/TC/45/2013 Rev 2.0 with latest amendments as available. Each km of HDPE duct should have 2 no End Plugs, 2 no Cable sealing plugs, and 2 no plastic couplers slip fit/push fit type etc.

3000

47

142230

... More
Supply of 2 x 24 fiber optic fiber splice straight joint enclosure (SJC) complete with all accessories. As per RDSO/SPN/TC/ 68/2014, Rev.3 or latest amendment.

26

3920

101937.42

... More
Supply of OFC jointing RCC pits size 0.6m X 0.8X 1m. The material shall be supplied as per engineer in charge's instructions.

10

6137

61375.5

... More
Supply of Battery Charger for 10 amps 12 Volt DC working with 230 V AC 50 Hz input supply(as per specification).

4

3344

13376

... More
Supply of SFP 1 Gbps 10 km as per specification

24

981

23544

... More
Supply of 24 Port LIU Rack Mountable loaded with suitable connectors of D-link, Molex, Raychem, Digisol or syrotech make. The Contractor should supply all miscellaneous items like connector patch cord for complete installation of fixed optical fiber interconnection unit.

8

6211

49689.6

... More
Supply of Thermo shrink Universal Jointing kit for Quad Cable (for straight joints) as per RDSO spec IRS/TC-77/2012 revision 3 With latest Amd.

36

2622

94392.72

... More
Half Round RCC pipes & collars of 150 mm internal dia (1 meter long) along with collars as per IS No. 458/2003 of NP type

80

203

16308.8

... More
Supply of VF tapping transformer as per RDSO spec IRS TC 76/2021 with AMD 1 or latest suitable for underground quad cable circuits, magneto telephone, emergency circuits ETC. (II) Impedance470:600

36

982

35378.64

... More
Supply of E1 extender (24v at data logger end) with following specifications: operations on 2-wire 4 copper circuits using G'SHDSL'Driving range:6.5 km at 2048 kbps on 24 AWG(0.5mm dia)unloaded copper pair under error -free conditions. Power supply input-options for 230VAC, 48VDC, 24VDC or various combinations' Make:Cygnus/Anda/Team link or similar

6

18221

109329.06

... More
Supply of CAT-6 cable of Dlink, Digisol, Network, paramount, polycab, organic, Molex,securenet or Lucent make (with identification mark/ferrules etc.)

305

20

6350.1

... More
Supply of 6 Pin Emergency Socket as per RDSO/SPN/TC-42/20. Suitable to fix in existing Emergency socket box.

22

306

6749.6

... More
Supply of LAN Extender with 4 port Ethernet with 230V AC/48V DC working with AC Power cord, as per RDSO Specification No. RDSO/SPN/TC/82/2020 Rev. 2 or latest.

3

17424

52273.98

... More
Supply of Warning tape. 1MM x 150MM x 1 Mtr printed "warning: S&T cable below" Orange Colour

440

22

10089.2

... More
Supply of Analog Earth Tester, 4 terminal (Dual Range), metal Body, and Rated Ohms 0-10-100 Ohms, as per IS Specification 9223/1989 suitable for measuring Earth Resistance along with accessories - 4 Nos. M.S. spikes, (Not less than 15 mm diameter and 750 mm in length), 4 Nos. reels of flexible wire 0.5 sq.mm. multi- strand copper wire 20 meter each along with one end crocodile clamp & another side terminal connector suitable for connecting with Earth Tester., hammer, 1 No. high-quality canvas bag/carrying case Make - Motwane, Rishabh, Fluke, Megger, CIE, Shanti.

2

4572

9145.12

... More
Supply of HDPE Ducts 40/33 mm dia as per RDSO/SPN/TC/45/2013 Rev 2.0 with latest amendments as available. Each km of HDPE duct should have 2 no End Plugs, 2 no Cable sealing plugs, and 2 no plastic couplers slip fit/push fit type etc.

2500

47

118525

... More
Supply of 2 x 24 fiber optic fiber splice straight joint enclosure (SJC) complete with all accessories. As per RDSO/SPN/TC/ 68/2014, Rev.3 or latest amendment.

24

3920

94096.08

... More
Supply of OFC jointing RCC pits size 0.6m X 0.8X 1m. The material shall be supplied as per engineer in charge's instructions.

10

6137

61375.5

... More
Supply of Battery Charger for 10 amps 12 Volt DC working with 230 V AC 50 Hz input supply(as per specification).

2

3344

6688

... More
Supply of patch cord cable (10 mtr long with SC-SC or LC-SC and LC-LC connector Patch cord). As per engineer in charge

24

525

12617.76

... More
Supply of Thermo shrink Universal Jointing kit for Quad Cable (for straight joints) as per RDSO spec IRS/TC-77/2012 revision 3 With latest Amd.

24

2622

62928.48

... More
Half Round RCC pipes & collars of 150 mm internal dia (1 meter long) along with collars as per IS No. 458/2003 of NP type

40

203

8154.4

... More
Supply of VF tapping transformers per RDSO spec IRS TC 76/2021 with AMD 1 or latest suitable for underground quad cable circuits, magneto telephone, emergency circuits ETC. (II) Impedance 470:600

24

982

23585.76

... More
Supply of E1 extender (24v at data logger end) with following specifications: operations on 2-wire 4 copper circuits using G'SHDSL'Driving range:6.5 km at 2048 kbps on 24 AWG(0.5mm dia)unloaded copper pair under error -free conditions. Power supply input-options for 230VAC, 48VDC, 24VDC or various combinations' Make:Cygnus/Anda/Team link or similar

4

18221

72886.04

... More
Supply of CAT-6 cable of Dlink, Digisol, Network, paramount, polycab, organic, Molex,securenet or Lucent make (with identification mark/ferrules etc.)

305

20

6350.1

... More
Supply of 6 Pin Emergency Socket as per RDSO/SPN/TC-42/20. Suitable to fix in existing Emergency socket box.

14

306

4295.2

... More
Supply of LAN Extender with 4 port Ethernet with 230V AC/48V DC working with AC Power cord, as per RDSO Specification No. RDSO/SPN/TC/82/2020 Rev. 2 or latest.

3

17424

52273.98

... More
Supply of Warning tape. 1MM x 150MM x 1 Mtr printed "warning: S&T cable below" Orange Colour

150

22

3439.5

... More
Supply of Analog Earth Tester, 4 terminal (Dual Range), metal Body, and Rated Ohms 0-10-100 Ohms, as per IS Specification 9223/1989 suitable for measuring Earth Resistance along with accessories - 4 Nos. 9 M.S. spikes, (Not less than 15 mm diameter and 750 mm in length), 4 Nos. reels of flexible wire 0.5 sq.mm. multi- strand copper wire 20 meter each along with one end crocodile clamp & another side terminal connector suitable for connecting with Earth Tester., hammer, 1 No. high-quality canvas bag/carrying case Make - Motwane, Rishabh, Fluke, Megger, CIE, Shanti.

1

4572

4572.56

... More
Supply of OFC jointing RCC pits size 0.6m X 0.8X 1m. The material shall be supplied as per engineer in charge instructions

6

6137

36825.3

... More
Supply of HDPE Ducts 40/33 mm dia as per RDSO/SPN/TC/45/2013 Rev 2.0 with latest amendments as available. Each km of HDPE duct should have 2 no End Plugs, 2 no Cable sealing plugs, and 2 no plastic couplers slip fit/push fit type etc.

2000

47

94820

... More
Supply of Battery Charger for 10 amps 12 Volt DC working with 230 V AC 50 Hz input supply(as per specification).

2

3344

6688

... More
Supply of 2 x 24 fiber optic fiber splice straight joint enclosure (SJC) complete with all accessories. As per RDSO/SPN/TC/ 68/2014, Rev.3 or latest amendment.

14

3920

54889.38

... More
Jointing of 4 / 6 quad /Signaling cable with Heat Shrinkable straight through Jointing Kit. All the 1 material required for the work are to be arrange by contractor himself at his own cost except Thermo shrinkable Joint Kit . After jointing the cable through test such as insulation test, continuity cable losses etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing, the contactor has to redo the joint free of cost.

18

1231

22172.04

... More
Supply and installation of RCC cable route marker engraved and painted on both side along the route every 50 mm and route diversion as per Drg. No 4014/00/CC4 or latest/ Stone marker. Running

26

485

12634.18

... More
Excavation of trench 300 mm wide at the bottom and 1.2 mtr deep, in all normal of soils condition. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 4 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m.

1600

81

130048

... More
Excavation of the cable trench in hard soil and/or Murrum soil mixed with boulders 300 mm wide at the bottom and 1.2 mtr deep or for less depth refilling the same with 1:3:6 CC. Running

120

143

17216.4

... More
Labour assistance for SSE/JE in day-to-day works i.e., checking the curves/straight alignment of formation levels etc, Carrying the tools& equipments etc,. Watch & ward during the course of execution of work as per the instructions of concerned SE/JE.(as per document)

90

629

56693.7

... More
Blowing of OFC through HDPE duct & protective work (elicited in above item) already provided. Where it is not feasible to blow OFC due to curves, road/track crossings, bridges or for any other reason, OFC shall be drawn or laid manually as per standard procedure. All the equipments and machinery required shall be arranged by the contractor at his own cost. In case OFC is to be laid adopting 'Direct in trench' method then this item shall be paid as per accepted rate of this schedule. OFC and HDPE pipe shall be supplied by the railway. Blowing/Laying shall be started from one end and each drum laying shall be monitored after blowing/laying and before leaving the site, trace/cable parameters for all the fiber/ conductors shall be taken from one central location by contractor's engineer with his own OTDR , optic talk set/ measuring equipments with railway engineer.

3000

11

33930

... More
Laying of HDPE pipe as per approved cable route plan in the excavated trench, taking due care while transporting and laying the same in the trenches or other protective works. Both the end of duct should be sealed with end plugs before laying and should remain selead till blowing is done.

3000

4

12930

... More
Splicing of laid under above items OFC cable and making the splice joint in dust free environment with contractor's own equipment and labour. Straight joint enclosure(SJC) is covered under schedule 'A' remaining all required materials,tools, plants shall be arranged by the contractor. splicing shall be started from 10 one end and each splicing shall be monitored after splicing and after closing the enclosure for all the fibers from one central location by contractor's engineer with his own OTDR and optic loss test set with railway engineer trace for the fibers shall be taken and signed jointly, if any fibred splice shows high loss/lossy event, the same shall be redone before completion of splicing work. The splice loss shall be as per the policy/technical circulars issued by the railways from time to time.

20

9840

196812.8

... More
Installation of OFC jointing pits (RCC/PVC) size 0.6mx0.8mx1m.The material shall be supplied as per engineer in charge instructions.

10

1312

13120

... More
End-to-end testing of all fiber ofthe optical fibred cable laid under the above items between 12 Station/Cable Huts/OC & other locations. All required equipment,tools, and plants shall be arranged by the contractor. Five number ofprint out of traces (containing all parameters) in folders must be supplied by the contractor. The OFC parameters/results, per kilometer link loss, etc., shall be as per the policy/technical circulars issued by the railways from time to time.

5

14345

71727.75

... More
Horizontal direction drilling/boring without damage of surface road using Auger Machine/Manual. The bore shall be 150 mm dia & shall be done at the depth of minimum 1200 mm from the ground level. The 13 ground level shall be considered ignoring the bankheight of the bank of the road. The length of the bore shall beminimum 4 Mtrs long. this include insertion of different dia DWCpipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note:- Pipe will be supplied by railway. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall belaid cautiously so that it should not get damaged due to rough handling & pressure on cable

45

1331

59926.05

... More
Supply and Installation of E1 Surge Protector as per Specification

68

3097

210630

... More
Jointing of 4 / 6 quad /Signaling cable with Heat Shrinkable straight through Jointing Kit. All the 1 material required for the work are to be arrange by contractor himself at his own cost except Thermo shrinkable Joint Kit . After jointing the cable through test such as insulation test, continuity cable losses etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing, the contactor has to redo the joint free of cost.

22

1231

27099.16

... More
Supply and installation of RCC cable route marker engraved and painted on both side along the route every 50 mm and route diversion as per Drg. No 4014/00/CC4 or latest/ Stone marker. Running

36

485

17493.48

... More
Excavation of trench 300 mm wide at the bottom and 1.2 mtr deep, in all normal of soils condition. 4 This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m.

1850

81

150368

... More
Excavation of the cable trench in hard soil and/or Murrum soil mixed with boulders 300 mm wide at the bottom and 1.2 mtr deep or for less depth refilling the same with 1:3:6 CC.

120

143

17216.4

... More
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels 6 of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each G.P.(Cables will be maggered before and after its laying by contractor under supervision of Railway Representative and he will submit the maggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes.

2000

11

22040

... More
Labour assistance for SSE/JE in day-to-day works i.e., checking the curves/straight alignment of formation levels etc,. Carrying the tools& equipments etc,. Watch & ward during the course of execution of work as per the instructions of concerned SE/JE.(as per tender document)

175

629

110237.75

... More
Blowing of OFC through HDPE duct & protective work (elicited in above item) already provided. Where it is not feasible to blow OFC due to curves, road/track crossings, bridges or for any other reason, OFC shall be drawn or laid manually as per standard procedure. All the equipments and machinery required shall be 8 arranged by the contractor at his own cost. In case OFC is to be laid adopting 'Direct in trench' method then this item shall be paid as per accepted rate of this schedule. OFC and HDPE pipe shall be supplied by the railway. Blowing/Laying shall be started from one end and each drum laying shall be monitored after blowing/laying and before leaving the site, trace/cable parameters for all the fiber/ conductors shall be taken from one central location by contractor's engineer with his own OTDR , optic talk set/ measuring equipments with railway engineer.

2500

11

28275

... More
Laying of HDPE pipe as per approved cable route plan in the excavated trench, taking due care while transporting and laying the same in the trenches or other protective works. Both the end of duct should be sealed with end plugs before laying and should remain selead till blowing is done.

2500

4

10775

... More
Splicing of laid under above items OFC cable and making the splice joint in dust free environment with contractor's own equipment and labour. Straight joint enclosure(SJC) is covered under schedule 'A' remaining all required materials,tools, plants shall be arranged by the contractor. splicing shall be started from 10 one end and each splicing shall be monitored after splicing and after closing the enclosure for all the fibers from one central location by contractor's engineer with his own OTDR and optic loss test set with railway engineer trace for the fibers shall be taken and signed jointly, if any fibred splice shows high loss/lossy event, the same shall be redone before completion of splicing work. The splice loss shall be as per the policy/technical circulars issued by the railways from time to time.

20

9840

196812.8

... More
Installation of OFC jointing pits (RCC/PVC) size 0.6mx0.8mx1m.The material shall be supplied as per engineer in charge instructions.

10

1312

13120

... More
End-to-end testing of all fiber of the optical fibred cable laid under the above items between 12 Station/Cable Huts/OC & other locations. All required equipment, tools, and plants shall be arranged by the contractor. Five number ofprint out of traces (containing all parameters) in folders must be supplied by the contractor. The OFC parameters/results, per kilometer link loss, etc., shall be as per the policy/technical circulars issued by the railways from time to time.

5

14345

71727.75

... More
Horizontal direction drilling/boring without damage of surface road using Auger Machine/Manual. The bore shall be 150 mm dia & shall be done at the depth of minimum 1200 mm from the ground level. The 13 ground level shall be considered ignoring the bankheight of the bank of the road. The length of the bore shall beminimum 4 Mtrs long. this include insertion of different dia DWCpipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note:- Pipe will be supplied by railway. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damaged due to rough handling & pressure on cable

36

1331

47940.84

... More
Jointing of 4 / 6 quad /Signaling cable with Heat Shrinkable straight through Jointing Kit. All the 1 material required for the work are to be arrange by contractor himself at his own cost except Thermo shrinkable Joint Kit . After jointing the cable through test such as insulation test, continuity cable losses etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing, the contactor has to redo the joint free of cost.

12

1231

14781.36

... More
Supply and installation of RCC cable route marker engraved and painted on both side along the route every 50 mm and route diversion as per Drg. No 4014/00/CC4 or latest/ Stone marker. Running

14

485

6803.02

... More
Excavation of trench 300 mm wide at the bottom and 1.2 mtr deep, in all normal of soils condition. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 4 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m.

950

81

77216

... More
Excavation of the cable trench in hard soil and/or Murrum soil mixed with boulders 300 mm wide at the bottom and 1.2 mtr deep or for less depth refilling the same with 1:3:6 CC. Running

50

143

7173.5

... More
Labour assistance for SSE/JE in day-to-day works i.e., checking the curves/straight alignment of formation levels etc,. Carrying the tools& equipments etc,. Watch & ward during the course of execution of work as per the instructions of concerned SE/JE.(as per tender document)

120

629

75591.6

... More
Blowing of OFC through HDPE duct & protective work (elicited in above item) already provided. Where it is not feasible to blow OFC due to curves, road/track crossings, bridges or for any other reason, OFC shall be drawn or laid manually as per standard procedure. All the equipments and machinery required shall be 8 arranged by the contractor at his own cost. In case OFC is to be laid adopting 'Direct in trench' method then this item shall be paid as per accepted rate of this schedule. OFC and HDPE pipe shall be supplied by the railway. Blowing/Laying shall be started from one end and each drum laying shall be monitored after blowing/laying and before leaving the site, trace/cable parameters for all the fiber/ conductors shall be taken from one central location by contractor's engineer with his own OTDR , optic talk set/ measuring equipments with railway engineer.

2000

11

22620

... More
Laying of HDPE pipe as per approved cable route plan in the excavated trench, taking due care while transporting and laying the same in the trenches or other protective works. Both the end of duct should be sealed with end plugs before laying and should remain selead till blowing is done.

2000

4

8620

... More
Splicing of laid under above items OFC cable and making the splice joint in dust free environment with contractor's own equipment and labour. Straight joint enclosure(SJC) is covered under schedule 'A' remaining all required materials,tools, plants shall be arranged by the contractor. splicing shall be started from 10 one end and each splicing shall be monitored after splicing and after closing the enclosure for all the fibers from one central location by contractor's engineer with his own OTDR and optic loss test set with railway engineer trace for the fibers shall be taken and signed jointly, if any fibred splice shows high loss/lossy event, the same shall be redone before completion of splicing work. The splice loss shall be as per the policy/technical circulars issued by the railways from time to time.

12

9840

118087.68

... More
Installation of OFC jointing pits (RCC/PVC) size 0.6mx0.8mx1m.The material shall be supplied as per engineer in charge instructions.

6

1312

7872

... More
End-to-end testing of all fiber ofthe optical fibred cable laid under the above items between 12 Station/Cable Huts/OC & other locations. All required equipment,tools, and plants shall be arranged by the contractor. Five number ofprint out of traces (containing all parameters) in folders must be supplied by the contractor. The OFC parameters/results, per kilometer link loss, etc., shall be as per the policy/technical circulars issued by the railways from time to time.

3

14345

43036.65

... More
Horizontal direction drilling/boring without damage of surface road using Auger Machine/Manual. The bore shall be 150 mm dia & shall be done at the depth of minimum 1200 mm from the ground level. The 13 ground level shall be considered ignoring the bankheight of the bank of the road. The length of the bore shall beminimum 4 Mtrs long. this include insertion of different dia DWCpipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note:- Pipe will be supplied by railway. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall belaid cautiously so that it should not get damaged due to rough handling & pressure on cable

36

1331

47940.84



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.