Western Railway Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Western Railway - WR Tender
Telecommunication Services
Ireps
Opening Date24 Oct 2024
Closing Soon18 Nov 2024
Tender Amount₹ 14,73,706.51
Costs
EMD
₹ 29,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
SandT-RTM-24-Tele-12-RATLAM DIVISION-S AND T/WESTERN RLYTender No
SandT-RTM-24-Tele-12Tender Authority
Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Blowing of OFC through HDPE duct & protective work (elicited in above item) already provided. Where it is not feasible to blow OFC due to curves, road/track crossings, bridges or for anyother reason, OFC shall be drawn or laid manually as per standard procedure. All the equipments and machinery required shall be arranged by the contractor at his own cost. In case OFC is to be laid adopting 'Direct in trench' method then this item shall be paid as per accepted rate of this schedule.OFC and HDPE pipe shall be supplied by the railway. Blowing/Laying shall be started from one end and each drum laying shall be monitored after blowing/laying and before leaving the site, trace/cable parameters for all the fiber/ conductors shall be taken from one central location by contractor's engineer with his own OTDR , optic talk set/ measuring equipments with railway engineer.
-
-
8
Laying of half-round RCC pipe after laying the cables in the trenches. (Cable laying is covered separately)
-
-
3
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each G.P.(Cables will be maggered before and after its laying by contractor under supervision of Railway Representative and he will submit the maggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes.
-
-
6
Blowing of OFC through HDPE duct, where it is not feasible to blowOFC due to curves, road/track crossings, bridges or for any otherreason, OFC shall be drawn or laid manually as per standardprocedure. In case OFC is to be laid adopting 'Direct in trench'method then approval of competent authority will be taken beforelaying. OFC shall be supplied by the railway. Blowing/Laying shall bestarted from one end and each drum laying shall be monitored afterblowing/laying and before leaving the site, trace/cable parametersfor all the fiber/ conductors shall be taken from one central locationby contractor's engineer with his own OTDR , optic talk set/measuring equipment's with railway engineer. All the equipment'sand machinery required shall be arranged by the contractor at his own cost
-
-
2
Laying of half-round RCC pipe after laying the cables in the trenches. (Cable laying is covered separately)
-
-
3
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%