Western Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Western Coalfields Limited - WCL Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date1 Oct 2024
Closing DateCancelled
Tender Amount₹ 9,05,68,000
Costs
EMD
₹ 9,08,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WCL_318279_1Bid Award Id
ViewTender No
wcl-hq-gmciv-e08-2024-25Tender Authority
Western Coalfields Limited ViewPurchaser Address
-Website
http://http://www.westerncoal.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Design engineering cost (P&M)
1
-
-
... More
Design engineering cost for Civil & Structural works
1
-
-
... More
CIVIL AND STRUCTURAL WORKS
-
-
-
... More
MAIN COMPONENTS OF CHP
-
-
-
... More
Conveyor Gantry (As per NIT and system requirement)
1
-
-
... More
Truck Loading Hopper with Lift Tower,Staircase and Pavement (As per NIT and system requirement)
1
-
-
... More
Transfer house (As per NIT and system requirement)
1
-
-
... More
SERVICE BUILDINGS
-
-
-
... More
CHP Office with Rest room, Pantry and Switch Yard Room (As per NIT and system requirement)
1
-
-
... More
Security Room (As per NIT and system requirement)
1
-
-
... More
LMV Parking Shed and Scooter Parking Shed (As per NIT and system requirement)
1
-
-
... More
Cement Concrete Road 3.75 Metre with 1.5 metre wide shoulders on both sides (As per NIT and system requirement)
1
-
-
... More
RCC Drains of size 60cmx90cm with covers all around TLS and one side of Service Road (As per NIT and system requirement, minimum legth to be provided 200 metres)
1
-
-
... More
Water reservoir,Water supply & pipe line (As per NIT and system requirement)
1
-
-
... More
Pump house (As per NIT and system requirement)
1
-
-
... More
Cable Trenches (As per NIT and system requirement)
1
-
-
... More
Items/installations/structures not specifically mentioned but needed for CHP
1
-
-
... More
PART- B (SUPPLY OF PLANT & MACHINERY, ERECTION, INSTALLATION & COMMISSIONING INCLUDING DLP PERIOD FOR MAINTENANCE FOR A PERIOD OF 60 CALENDAR MONTHS)
(Electrical and Mechanical P&M items)
-
-
-
... More
Mechanical Equipments
-
-
-
... More
Surface Belt conveyor C1, 1200 mm wide, Minimum 70 m long or as required, 400tph nominal capacity, 1.5 m/sec. Speed, 1 x 55 kW drive, Horizontal/vertical gravity loop take up, electrical items suitable for operation at 415 V, 50 Hz, 3 phase supply including scrappers, two way transfer chutes, brakes, idlers, coveyor structures, tail-end, loading points, switches, impact guard, skirt plate, decking plates, D-3500 PVC belting, interlocking & controls, Traction type fluid coupling etc. all complete. (As per NIT)
1
-
-
... More
Hydraulic Sector Gates, 400tph +20% capacity, suitable for (-)150mm lumps alongwith electricals suitable for 415/550V, 3 phase, 50Hz AC Supply will be installed below 2x100te overhead RCC hoppers. (As per NIT)
2
-
-
... More
Lifting tackles (As per Appendix- C) (As per NIT)
Elec.Hoist blocks 3T capacity - 2 Nos or as required.
Chain pulley blocks 2 T capacity - 1 No or as required.
All complete
1
-
-
... More
Dust suppression system consisting of nozzles, pumps, piping, valves, dust extraction system etc. all complete as per specifications
1
-
-
... More
1) For Fire fighting
a) 4 electric pump ( 2 working and 2 standby) with 4 jockey pumps, 2 diesel engine operated pump, additional pump (if required), pipes, stand post type fire hydrant points, landing valves, fire hose reels, fire hoses, cabinets, branch pipes, nozzles, fire detection and alarming system (consisting of linear heat sensing devices, smoke detectors), back up power arrangement (UPS), pipes, bends etc. All complete
b) Fire extinguishers Dry chemical powder type, 5 kg cap (as required) c) Fire extinguishers CO2, 5 lit. capacity(As required)
d) Sand buckets, 9 lit capacity (As required e) MS stand along with hooks to hang the sand buckets (As required f) Any other items as required
All complete 2) Plant cleaning and drinking water system consisting of pumps, piping, hoses, nozzles, Compressors etc. , all complete
1
-
-
... More
Misc. 1. Condition monitoring system consisting of sensors for temperature, vibration and noise level, out stations, microprocessor based central station, cables etc., and others as required complete. 2. Ventilation, safety equipments, Air compressors, slurry pumps, for hopper low level/ high level indicators, temperature/thermal sensors, etc. and others as required, all complete
1
-
-
... More
Any other item(s) not included in the above list but necessary for efficient operation of the entire plant (items to be specified), all complete including dovetailing of belt conveyor TB1 and C1 at Transfer House-1.
1
-
-
... More
ELECTRICAL EQUIPMENT
-
-
-
... More
MCC
-
-
-
... More
415 V Sectionalizer Motor Control Centre (MCC) at all substations comprising of:
- 1 No. of Incomer ACBs
- 1No. of Outgoing ACBs for Conveyor C1 Motor
- 1No. of Outgoing ACBs as lighting load
- Required nos. of outgoing Feeders for supply of power to LT Motors (of equipment
like Hydraulic sector gates, Electrical Hoists etc. as per the requirement)
(As per NIT)
1
-
-
... More
Power Cables
-
-
-
... More
1.1kV grade, XLPE insulated, PVC sheathed single wire armoured aluminium conductor
FRLS cables of different sizes as per technical specification (As per NIT)
1
-
-
... More
Lighting cables
-
-
-
... More
1100 V grade, PVC insulated, PVC sheathed, single wire armoured, Al conductor, FRLS
cables of different sizes and 1100V grade and 2 core, PVC insulated with PVC
sheathed stranded copper conductors as per technical specification (As per NIT)
1
-
-
... More
Control Cables
-
-
-
... More
1100 V grade, single/multi core PVC insulated and sheathed, copper conductor, FRLS,control and signalling cables of 6 sq. mm cross-section having different no. of cores as per technical specification. (As per NIT)
1
-
-
... More
Cable trays /cable hangers (separate trays shall be used for power and control cables), cable vaults etc as per technical specification. (As per the system Requirement (As per NIT)
1
-
-
... More
Luminaires
-
-
-
... More
Fixed type lighting mast with LED lights (16 m high) (As per NIT)
1
-
-
... More
LED luminaires as per requirement complete with control gears, accessories etc. as per
technical specifications for:
(i) Transfer house, Drive house etc.
(ii) Switch board room, stores, pump house, compressor room, conveyor gantries etc.
(As per NIT)
1
-
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements