Military Engineer Services Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Military Engineer Services - MES Tender
Security and Emergency Services
Eprocure
Opening Date30 Jan 2024
Closing Date29 Feb 2024
Tender Amount₹ 22,70,000
Costs
EMD
₹ 45,400Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_639776_1Bid Award Id
ViewTender No
83876/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender documents with errata and amendments
BOQ Items
NOTE:
(a) The work under this contract shall be carried out through OEM of the lifts or their authorised agents complete all as described in Sch, special conditions, particular specification, MES SSR and as directed by GE / Engineer-in-charge.
(b) The Contractor shall enter into a MOU with the OEM for ANNUAL MAINTENANCE CONTRACT for maintenance of lift. The MOU for the post warranty/ post defect liability period between the contractor and OEM shall also be submitted prior to the commencement of work.
(c) The cost of all replaced defective parts and spares, other than mentioned is deemed to be included in quoted unit rates and nothing extra will be paid to the contractor on this account.
(d) The comprehensive/preventive/periodical maintenance includes weekly, fortnightly, monthly, quarterly, half yearly inspection testing as per service manual in presence of JE E/M & MH Bhopal REP as given in PS. The inspection/ test report will be submitted to Engineer-in-charge before payment of RAR.
(e) The complete records of replaced spare parts, other than mentioned will be maintained and will be produced to Engineer-in-Charge on monthly basis or as and when asked to produce the same.
(f) The AMC shall become in force immediately after issue of work order No 01. The lifts will be handed over to contractor in as and when condition and cost of all kind of repair/replacement of item to make it fully functional other than mentioned is deemed to be included in quoted unit rate and nothing extra will be paid to the contractor on this account.
(g) If the contractor fails to carry out minor repair / replacement and to keep the lift in running condition within 04 hrs., the contractor shall pay penalty charges as under: (i) Upto 12 hours - Rs 500.00/HR (ii) Above 12 hours and upto 24 hours - Rs1000.00/HR (iii) Above 24 hours - Rs1500.00 /HR
The decision of GE in these regards shall be final, conclusive and binding. (h) The cost of transportation (to and fro) and other necessary equipment shall be arranged/brought by contractor to complete the job and nothing extra will be paid to the contractor on this account. (j) The contractor shall display the OEM/authorised agents of OEM mobile/contact no in each lift car & at lift lobby and update from time to time.
-
-
-
Supply, fixing, testing and commissioning in replacement the following original spare parts suitable for 20 Passenger/1360 Kg-02 Nos (G+2 Floor), 15 passenger-1 No (G+ 1 Floor) and 8 Passenger/544Kg-01 No (G+2 Floor), capacity each (Make : KONE Elevator India PVT Limited/OTIS ) complete all as specified and directed:-
-
-
-
Infra-red door sensor
3
-
-
Microelectronic card suitable for VVVF drive of mounted in control panel of lift
2
-
-
Gate operating multi-slotted belt drive
2
-
-
Battery, 12 Volt; from 10 to 18 AH, dry type for automatic rescue device/invertor for UPS back up supply for Operation Theatre
150
-
-
Flat belt for permanent magnet gearless machine
10
-
-
LED bulbs 9 watt with reflector
20
-
-
Oscillator switch
3
-
-
Synchronization switch
4
-
-
Rail Oil
12
-
-
Alarm Bell
4
-
-
Emergency Switch
6
-
-
Cabin fan of 300 mm or existing size sweep [Make: - CG/Havells/Khaitan]
4
-
-
Defective/burnt electric motor of cap upto 10 HP, 3 phase, 440V, 50Hz from foundation and transport it to workshop for rewinding with super enamelled copper wire and replacement of DE & NDE bearings so as to match the manufacturers original specification complete and reassembling, fixing the same, testing and commissioning to the entire satisfaction of Engr-in-Charge/GE.
2
-
-
Hall push buttons assembly complete with illuminated push button and direction indicator with 7 Segment LED display with LP/LPC car of stainless steel with connection in and including cutting of wall and making good disturbed surface to match with the existing surface with & including all minor spare parts as required.
2
-
-
Comprehensive maintenance of Modular Operation Theatre (OT) with the following :-
20
-
-
Peripheral Light cum clean room luminaries fitted in the CG frame - Clean-room surface-mounted and recessed luminaire with 3 T5 lamps 54 W. Framed luminaire cover made of highly-resistant and disinfectant- consistent laminated safety glass, lacerable, semi-specular with visual systems against glare of the lamps and of the internal highly-specular reflectors, cumulative reflexion coated, singular adjustable by up to +/- 30°. Luminaire body white, consists of sheet steel with mechanical and electrical removable carrier equipment. Protection class IP 65 with dimmable electronic multi-lamp ballast with 1-10 V interface. Suitable for areas with infrared regulation. for major OT. Note: - Minor spare such as CFL lamp, ballast, wiring system and other minor part (electric & electronic) shall be included in the rate quoted by the tenderer.
-
-
-
Peripheral Light for surface or recess mounting in operation theatres and other clean rooms flush with the ceiling, for 3 T5 fluorescent lamps (54 W), Ø 16 mm with highly-specular, anodised aluminium reflectors and optical anti-glare system for individually adjustable light distribution. Ledge for ceiling construction material as angular ledge for covering the raw edge of the ceiling construction material. Should be capable if green mode for endoscopy purposes. With dimmable electronic multi-lamp ballast with 1-10 V interface. Suitable for areas with infrared regulation. For Major OT. Note:- Minor spare such as lamp, ballast, wiring system and other minor part (electric & electronic) shall be included in the rate quoted by the tenderer.
-
-
-
Surgeon Control Panel for OT: All the controls within the theatre will be located on a membrane type control panel mounted in the theatre wall either as a single panel or individual. A remote distribution board is to be provided to allow access to the panel for maintenance, without access to the theatre. The panel will incorporate all the necessary controls for the correct operation and monitoring of the equipment and services within the operating theatre. The time elapsed digital clock and real time digital clocks shall have high brightness characters, not less than 30mm in height. The medical gas alarm will indicate High and Low gas pressure for each gas service present in the operating theatre and will have an audible buzzer with mute facility. The medical gas alarms will be connected to local pressure switches located downstream of the last isolation valves. Each control panel should contain: -
-
-
-
1. Time Day Clock 2. Time Elapse Day Clock 3. General Lighting System 4. Medical Gas Alarm Panel 5. Hand Free Telephone set with memory 6. Temperature & humidity indicator with controller 7. HEPA Filter Status module 8. Room Pressure Indicator
-
-
-
Distribution Board: All high voltage equipment should be installed in a separate enclosure. The remote cabinet should house the operating lamp transformers, mains failure relays, electrical distribution equipment and circuit protection equipment for all circuits within the operating theatre. All internal wiring should terminate in connectors with screw and clamp spring connections of the Clip-on type mounted, on a DIN rail and labelled with indelible proprietary labels. Individual fuses or miniature circuit breakers should protect all internal circuits.
-
-
-
X-Ray Viewing Screen: The system should electrical safety codes for high & low voltage system. The theatre is to be equipped with a 2-plate X-Ray viewing screen. The X-Ray viewing screen of minimum size 800 mm x 400 mm should be illuminated by 4 pieces of high frequency fluorescent lamps and the dimming is controlled by the usage of dimming ballast with the PCB that is mounted inside the box. The diffuser should be able to diffuse the light evenly and to provide enough luminance for film viewing. The film should be held firmly by using spring-loaded clips with rollers for ease of mounting and demounting. The body should be built by using electrolyzed steel with powder coated. It should work on a PCB button control system.
-
-
-
HATCH BOX: A Hatch shall be provided in each major operation theatre to provide supplies to the functional OT without having to open the main door in order to minimize air currents. The hatch should communicate with the clean corridor adjacent to the respective OT. The UV light should be so installed that it is kept on while both the doors are closed, this UV light has to be automatically turned off in case of opening of either of the doors. There shall be indicators on both side of the OT so that door open / close status can be monitored from both ends.
-
-
-
Single Service Area Valve Service Unit - It should fully comply and meet with NFPA 99 or HTM 0201, C11, and must be duly CE marked with CE no. specified on it. The Area Valve Service Unit (AVSU) should incorporate a ball value with NIST connectors either side, mounted in a lockable box with emergency access. The valve should be complete with copper stub pipes that extend to the outside of the box to enable easy connections to the Medical Gas Pipeline System (MGPS). The valve should operate from fully closed to fully open with a quarter turn of the handle. The spades should be injection moulded and colour coded to show through or blank identification. Should be full bore values for minimum pressure loss and should have lockable in open or closed position.
-
-
-
Twin Dome Operating LED Light -1 No for each OT. It should be LED which should provide direct, reflection free illumination. It should have LFL lens combination and have the primary optics which guides the light in a parallel beam, while secondary optics ensures beams of coherent light. The results should be an excellent illumination in the OT field in terms of area and depth. It should be cold infrared -free light. It should be flat, sealed light body specially designed for laminar flow ceilings. It should have flow optimized light head and reduced surface temperature of dome to minimizes turbulences in laminar air flow. It should have IR-free illumination to avoid tissue desiccation and sweat on the surgeon's forehead. It should have optimized ratio light head/light field diameter. The high illumination intensity should be 160000 lux (120000 lux for minor OT) at 1 m distance. It should have deep field illumination L1+L2 equal to or greater than 800mm. It should have adjustable light field from 180mm to 300mm to provide flexibility of surgery. It should have twin identical light head of 160000 lux each (120000 lux for minor OT). It should have minimum colour temperature 4700K. However variable colour temperature is also acceptable and preferable. The colour temperature should remain constant during changes in intensity. It should have colour rendering index RA95. The temperature increase at surgeon head should be 10 C and temperature on surface light head 370C. It should have light head dimmable (upto 8 steps) with range approximately 70000 to 160000 lux (70000 to 120000 lux for minor OT).
-
-
-
PENDANT - Double Arm Pendant with only horizontal movement; Non Motorized without retractable feature.
-
-
-
Hermetically Sealed OT Door with automation. The entire door should be duly CE/ISI marked. It should be a Hermetically sealed single leaf Main door Size: 1800 x 2100 mm Main door (01 No) with vision panel 300 x 300mm (glass sandwich - viewing glass in the door blade). Test certificate from the lab from the manufacturer's place for 99.99% hermetically sealing should be provided. The track should be of extruded aluminium profile and its running surface for the top rollers should be placed at an angle of 45°. The door blade should be provided with a special rubber gasket, all around the door blade, a hermetic sealing is then realized. The hermetically closing should be 99.99986% air tight at pressure of 100 Pa. The opening must be three sided finished with 9mm board and finished on the visible side with 0.9mm, hard plastic laminate. The finished floor in the opening and in the sliding space must be level; maximum deflection should not exceed ± 1 mm. Doors should be capable of being manually operated in the eventuality of failure of micro processor
-
-
-
Hermetically Sealed OT Door with automation. The entire door should be duly CE/ISI marked. It should be a Hermetically sealed single leaf Size: 1000 x 2100 mm Main door (01 No) with vision panel 300 x 300mm (glass sandwich - viewing glass in the door blade). To maintain sterility and the correct air pressure in the room, all doors into and out will be of the sliding, hermetically sealing type. The door should be also be easily openable and closed by means of the special lever handle, which should be provided on both sides of the door blade in case of failure of automatic door opening mechanism. The door blade should be provided with a special rubber gasket, all around the door blade, a hermetic sealing is then realized. The hermetically closing should be 99.99986% air tight at pressure of 100 Pa. The opening must be three sided finished with 9mm board and finished on the visible side with 0.9mm, hard plastic laminate. The finished floor in the opening and in the sliding space must be level; maximum deflection should not exceed ± 1 mm. Doors should be capable of being manually operated in the eventuality of failure of micro processor
-
-
-
Pressure Relief Dampers: Each Stabilizer should comprise of a carbon steel case and matching slip over rear flange. The carbon steel housing should contain up to four grade 304 stainless steel blades, which pivot upon sealed for life bearing assemblies. Balancing is to be carried out utilizing a proven balance weight assembly. Individually balanced stabilizers should be accurate to a range of 1 Pascal over their working range of 5-35 Pa. Adjustment should be easily carried out on site should the need arise.
-
-
-
Homogenous Low Turbulence laminar air flow system. It should be Ultra Clean Ventilation System with Unidirectional Flow. It should be draft free with undisruptive noise level less than noise levels of ≤ 45 to 48 dB(A) required by European standards. It should have minimal pathogen concentration (less than 10 CFU/m³) in the sterile field.
-
-
-
Note for above: - 1. Tenderer must be ensured that the amount of minor spare parts such as wiring system, ballast, lamps oiling, greasing, any type circuit breakers LED indicators & etc to be included in the quoted rate of comprehensive maintenance of each unit. 2. All equipment for comprehensive maintenance in each OT should be measured as one job. 3. General cleaning of OTs during the currency of contract will be carried out by the tenderer.4.The tenderer shall provide one technician/site engineer along with necessary staff and requisite T&P quarterly for inspection of plant and to rectify faults for smooth functioning of Modular OT.
-
-
-
Periodical & preventive maintenance of (quarterly basis) including repair, renewal/ replacement of defective parts of mechanical laundry and complete all 130 check by appropriate instrument such as open and refitted gears, blabbering, cleaning stem pipe lines & valves etc mechanical laundry to wash, dry and ironing for an average load of various types of solid linen and including following equipments/machinery for 149 BED at MH BHOPAL by OEM or Authorised Partner of OEM. MAKE: FABCARE .
4
-
-
Details of plant and equipments are as follows: - (i) Fully computerized Washing Machine, Washer Extractor, 45 Kg Capacity per charge, with High spin Extraction feature (with inbuilt Hydro Extractor) steam Heated, -01 No. (ii) Fully computerized Washing Machine, Washer Extractor, 20 Kg Capacity per charge, with High spin Extraction feature (with inbuilt Hydro Extractor) steam Heated- 01 No. (iii) Sluicing Machine, 20 Kg capacity per charge, with High Spin Extraction feature (With inbuilt Hydro Extractor) with G force not less than 300. -01 No. (iv) Drying Tumbler, 30 Kg cap per charge, Steam Heated through stainless steel steam coils and aluminium fins. - 02 No. (v) Flat work Ironer, single Roller, Chest Heated through steam with air suspended ironing chest, pneumatic lowering rising and lowering adjustable pressure 180 Degree contact angle. - 01 No. (vi) Wash linen trolley (for wet/dry linens) made out of Stainless Steel tubes & Stainless Steel cladding. . Size: 1000 mm X 800 mm X 800mm. (vii) Shelf trolley made of stainless steel size 1400 mm (w) X 700 mm (d) X 1900 mm (h) mm with castor wheel - 04 Nos. (viii) Single sink (1 person operated) microprocessor based manual shrub station size 40" (L) X 24" (W) X 48" (H) made of stainless steel-304 grade operated on 230 V AC 50 Hz complete -01 No. (ix) Mobile table with stainless steel top and shelfs of size 1330 mm (w) X 900 mm (d) X 1000 mm (h) with castor wheel - 04 Nos.
(x) Single sink stainless steel scrubbing station complete.
-
-
-
Scope of periodical and preventive maintenance includes the following:-
(i) To check the alignment of all machineries and rectify if necessary.
(ii) To check and correct the weight arrangement of each machine and adjustment it by the microprocessor card.
(iii ) Oiling and greasing of each machine by mechanical method like adjustment of pressure pump etc.
(iv) Check all electric connections to each equipments/machines and rectify if necessary. (v) Cleaning, oiling and servicing tank of capacity 1000 litres - 01 No. (vi) To check and re-fixing of single rolling chest for steam with air suspended iron chest.
(vii) Check and calibrate Vacuum Ironing Table, Size of the table 4' x 2.5' with imported steam iron and fittings. -03 Nos.
(viii) Check Hand iron for pressing the clothes, 6.5 Kg weight 1 'rWJ capacity suitable for 230 V, Single phase, 50 HZ AC -01 No. (ix) Through check of Air compressor capable of delivering 6 kg/cm² compressed air at delivery point with tank capacity 150 litre - 01 No. (x) Checking of Compressor air supply pipe lines complete. -01 Job. (xi) Water softening plant suitable to deliver 1000 litres per hour soft water having hardness of less than 5 PPM including all accessories as required complete - 01 No.
-
-
-
Note:- Other conditions
(i) The tenderer shall provide one technician/site engineer along with necessary staff and requisite T&P quarterly for inspection of plant and to rectify faults for smooth functioning of the mechanical laundry plant.
(ii) The minor part required during periodical maintenance for smooth functioning of mech laundry should be included in the unit rate quoted by the tenderer.
(iii) The major part should be replaced (only if required) and measured & paid separately.
-
-
-
Periodical maintenance (Quarterly basis) of Softener Plants as per the Thermax Norms suitable for IBR complaint steam boiler capable of generating steam 400 Kg per hour at 100DC having reverse of fuel technology steam output at safety valve set pressure of 10.5 Kg per square centimetre, LDO/HSD operated fixed complete at MH Bhopal by OEM or Authorised Partner of OEM.
4
-
-
The purpose of the annual service contract is to:
(i) Ensure SMOOTH operation of system / Ensure up time.
(ii) Corrections in Operation & Maintenance Practices to explore the chances of Operating Cost Reduction.
(iii) Check the possibility of operation cost reduction by modifications. Efficiency optimization improvement.
(iv) To get the Maximum out of Annual Maintenance of the System.
(v) Better planning for Spares/consumable Stocking to avoid the delay at the time of break down,
though as authorized franchisee of Thermax, we are maintaining sufficient quantity of spares in our Bhopal Godown.
(vi) 100% availability of the unit for the service run.
-
-
-
Scope of ANNUAL SERVICE CONTRACT: The ANNUAL SERVICE CONTRACT for the Softener Plants shall be offered in 6: 6:1 i.e. six visits of one day each for the once in two months (General Check up), Six visits breakdown (on demand), one visit for over hauling.
-
-
-
Details of the work description during visit is as under
Once in two months Visits: This shall be a “1 DAY VISIT” once in two months during which the following activities shall be carried out:
(i) Overall Survey of the Installation.
(ii) Check number of streams & flows etc.
(iii) Check Inlet/Outlet parameters, Flow rates.
(iv) Intermediate quality parameters.
(v) Evaluation of available Instrumentation.
(vi) Log books details.
(vii) Raw Water Analysis in terms of Ca, Mg, Na, Cl2, TDS, Hardness, Free Chlorine, Ph .
(viii) Checking existing Analysis Facilities available at site. If not available collection of Feed,
Softener Outlet, samples Each Unit details like diameter, Instruments available.
(ix) Specific Problems if any.
-
-
-
Evaluation of Data Collected in visit: The data collected during the visit shall be evaluated for the following:
(x) Flow rate per unit & suitability of existing unit based on size.(xi) Softener process calculations cross checking with respect to present feed water analysis chemicals adequacy.(xii) Activity plan for Annual servicing indicating customer input requirements like shutdown period, manpower requirement, chemicals requirement(xiii) List out the spares required during the Annual Servicing.(xiv) Recommendation on Replacement of Instruments if required.(xv) FEED BACK REPORT to customer with the above evaluation report along with the activity plan. After this a final report shall be submitted giving the summary of operating parameters like Flow rates, Inlet outlet parameters, improvements observed, recommendations on replacements & spares stocking. During this visit the following shall be checked:(i) Overall Survey of the Installation.(ii) Check Inlet/Outlet parameters, Flow rates.(iii) Specific Problems if any related to hardware.
-
-
-
BREAK DOWN Visit : Three visits are planned for break down. If more visits are paid for attending break down, they will be adjusted with once in two months visits.(i) Learn the detail background of the problem on the phone prior to the B/d visit.(ii) Identify and resolve the problem immediately if possible through guidance or arrest the Symptoms.(iii) Identify problem.(iv) Root Cause analysis.(v) Rectify the problem at root cause.(vi) Equipment put back in action.(vii) Inform customer nature of breakdown / malfunctioning, cause of the problem and the solution.(viii) Also inform the customer about the action taken / to be taken.(ix) Inform customer about the action to be taken to avoid repetition of problems. (x) Track breakdown, component failures.(xi) Unit put back in to operation.
-
-
-
OVERHAULING Visit : This shall be OVERHAULING visit once in year for the period of 1-2 days maximum depending on the size of the unit.
EXCLUSIONS FROM ANNUAL SERVICE CONTRACT
(i) Any Spares Supply if required.
(ii) Any Chemicals, lubricants, consumables etc. if required.
(iii) Detailed Analysis of Influent & Outlet Effluent if required. We will do standard analysis by
which we can optimize the unit and check the performance, like TDS, pH, TH, Talk, Cl, etc.
(iv) Facilities for Inspection & Checking if required.
-
-
-
Note :- The tenderer shall provide one technician/site engineer along with necessary staff and requisite T&P for inspection of plant on daily basis and to rectify faults for smooth functioning of the steam boiler.
-
-
-
Replacement of broken/burnt out spare part (only if required):-
-
-
-
Door gasket
3
-
-
Air solenoid valve
3
-
-
Reverse forward timer
2
-
-
Butterfly valve of size 83mm
2
-
-
Grease
3
-
-
Oil for machine
1
-
-
36 Amp on load Auto Contactor
4
-
-
S & F 25 mm Stainless steel pipe set grade 304 seamless pipe or as per existing size for steam circulation
10
-
-
S & F 15 mm Stainless steel pipe set grade 304 seamless pipe or as per existing size for steam circulation
2
-
-
VFD (Drive)
1
-
-
Washer Extractor controller
2
-
-
Bearing of size 68 to 180 mm inner dia including oil seal , circlip, 'O' ring
6
-
-
Bush
2
-
-
Aluminium pulley
1
-
-
Butterfly valve of size 74mm including motor as per sample
6
-
-
Motor rewinding 7.5 HP
3
-
-
LDPE Tank 80 litre of Make :- Thermax
1
-
-
Multiport valve 20NB as per sample
1
-
-
Tulsion Resion T-40 NB
150
-
-
Salt for softener
730
-
-
Chemical for descaling Max clean 0.5 Make; - Thermax
380
-
-
Dozing powder 32BS Make; - Thermax
95
-
-
Valve globe- gm-thd-3/4” bspt
2
-
-
Valve globe- gm-thd-1” bspt
1
-
-
Thermodynamic trap-rifodyne RD 323 /ss body/NPT without blow down valve size =15 NB screwed ,npt or as per existing size
8
-
-
Taking down main switch/MCB by disconnecting the electric supply including MCB/Cut out etc. any type and size complete all as specified and as directed.
11
-
-
S & F miniature circuit breakers (MCB), four pole with four protected pole (FP), unenclosed, panel board type, screw type terminals for external copper conductors, C-type instantaneous tripping, rated voltage 415 V three phase, rated frequency 50 Hz, Rated current 63 A, Rated Short circuit capacity 10 kA, any type of fixation, Protection IP 20 complete all as specified and as directed.
6
-
-
S & F miniature circuit breakers (MCB), four pole with four protected pole (FP), unenclosed, panel board type, screw type terminals for external copper conductors, C-type instantaneous tripping, rated voltage 415 V three phase, rated frequency 50 Hz, Rated current 40 A, Rated Short circuit capacity 10 kA, any type of fixation, Protection IP 20 complete all as specified and as directed.
5
-
-
Note Applicale to all items mentioned here in before: Spare parts exclusive from supply items deemed to be included in rate quoted by the Contractor. Reports of parameter as desired on applicable items like Lift, laundry and applicable items has to be submitted from OEM by the contractor before processing for payment.
-
-
-
Supply and fixing of Single headed Gun Metal fire hydrant landing valve type A (single head outlet) of 80mm dia landing valve with 63mm dia female outlet complete and 80mm inlet with ABS blank cap,CI Wheel and chain as per IS 5290-1983, suitable for brigade hose of 63mm with couplings conforming to IS 903 including taking down the existing one complete all as specified and directed by Engr-in-Charge. Make:- GETECH / Safex / Safegaurd
10
-
-
Supply and fixing of weather proof standard fire hose box made of 18 SWG gauge MS Sheet 800mm x 600mm x 250mm with double door with 4mm thick glasses fixed with rubber beading of thickness 2 mm, lock, 2 keys and a break glass, recess for keys, painted in fire red. The door frames shall be of 16 gauge MS sheet. The hose box shall be painted fire red outside with 'Fire hose' marked on front and brilliant white inside suitable for housing including taking down the existing one complete all as specified and directed by Engr-in-Charge.
10
-
-
Supply and fixing in RRL hose pipe conforming to IS:636-1979 (type-II) of 63mm dia including GM instataneous male and female coupling (IS:903) ss wire binding and branch pipe and nozzle 12.5mm dia including taking down the existing one complete all as specified and directed by Engr-in-Charge.Make:- GETECH / Safex / Safegaurd or equivalent.
10
-
-
Supply and fixing in replacement of position 63mm nominal bore and 15m long synthetic fibre, circular woven jacketed, rubberized fabric reinforced rubber lined (RRL) fire hose pipe of approved make bearing IS : 636-1988 type A mark and having TAC and MMD approval with a pair of 63 x 63 mm gun metal instantaneous type, heavy duty delivery hose coupling (conforming to IS : 903) bound and riveted to the hose pipe with copper rivets and copper wire, complete all as specified and including taking down the existing one complete all as specified and directed by Engr-in-Charge. Make:- GETECH / Safex / Safegaurd
51
-
-
Supply and fixing of position Gun Metal 63mm dia short size branch pipes lenght 300mm with 15 mm dia nozzles with 63mm instantaneous coupling ISI marked (IS: 903). and including taking down the existing one complete all as specified and directed by Engr-in-Charge. Make:- GETECH / Safex / Safeguard
54
-
-
Supply, fixing, testing and commissioning of wall mounting swinging type First aid fire hose reel with drum, hanging bracket,Thermoplastic rubber (first aid hose) as per IS 12585 20 mm dia 30 mtr length to with stand 10 kg per Sq cm working pressure fitted with gunmetal nozzle and shut off valve of any size complete all as specified. The hose reel shall be conforming to IS 884-1985 including for 25 mm dia MS pipe connection from riser to hose reel sockets,nipples,elbows,valve etc. Drum shall be fixed on adjoining wall through anchor fasteners/cement concrete hook or MS stand as per site requirement and the rate for fixing/hanging items in the rates quoted(for internal hydrant and one each an either side of stage) including taking down the existing one complete and depositing to MES store yard all as specified and directed by Engr-in-Charge. Make:- GETECH / Safex / Safegaurd
17
-
-
Supplying & fixing of 25 mm bore gun metal gate valves with iron wheel head,screwed both ends for iron pipe, ISI Marked, as per IS: 778 of following sizes including taking out unserviceable gate valves complete all as specified and as directed at site by the Engineer-in-Charge. Make:-Leader / Zoloto /kirloskar
40
-
-
Material and labour for painting with one synthetic enamelled paint as per approved colour code of fire fighting hydrant system with hose cabinet complete all as specified and as directed by the Engineer-in-Charge.
59
-
-
Supply, fixing, jointing and testing in replacement of manual call point break glass type enclosed in M S enclosures body of 3 mm thickness complete with chain and hammer and incl inscriber in case of fire break glass complete including taking down the existing one complete all as specified and directed by Engr-in-Charge. Make:-Agni Devices / ASE / Daksh
20
-
-
Supply, fixing, jointing and testing in replacement of electrically operated Electronic Hooter enclosed in MS enclosures of suitable size painted with sythetic enamaled paint red coloured complete with suitable transformer including taking down the existing one complete all as specified and directed by Engr-in-Charge. Make:-Agni Devices / ASE / Daksh
1
-
-
Repair and maint of existing electrically operated Electronic Hooter enclosed in MS enclosures of suitable size including repair of transformer & two coat of synthtic enamel paint red colour & testing complete with suitable transformer complete all as specified and directed by Engr-in-Charge.
4
-
-
Supply & Fixing 4 mm plain glass ISI marked along with Rubber Beading etc change in FHC complete all as specified and as directed by the Engineer-in-Charge.
20
-
-
M&L for replacement of rubber beading of good quality thickness 2 mm black colour for glass packaging of fire hose box complte all as dpecified and directed.
30
-
-
M&L for Servicing of Single headed Gun Metal fire hydrant landing valve type A (single head outlet) of 80mm dia landing valve with 63mm dia female outlet complete and Studs, GM nut,Coupling complete all as specified and as directed by the Engineer-in-Charge. Note :-Any spare parts if required deemed to be included in quoted rates.
49
-
-
M&L for Servicing of Single headed Gun Metal fire hydrant landing valve type A (Double head outlet) of 80mm dia landing valve with 63mm dia female outlet complete and Studs, GM nut,Coupling complete all as specified and as directed by the Engineer-in-Charge. Note :-Any spare parts if required deemed to be included in quoted rates.
10
-
-
Servicing ,fixing, testing of wall mounting swinging type First aid fire hose reel with drum, hanging bracket, for 25 mm dia MS pipe connection from riser to hose reel sockets,nipples,elbows, valve and replacement of gasket etc. Drum shall be fixed on adjoining wall /MS Sheet through anchor fasteners/cement concrete hook or MS stand as per site requirement complete all as specified and as directed by the Engineer-in-Charge. Note:- The rate for fixing/hanging items deemed to be included in quoted rates.
49
-
-
Writing letters or figures on Existing FHC (Black, Romon, Italic or Indian) with paint not exc 30cm height complete all as specified and as directed by the Engineer-in-Charge.
59
-
-
Supply, fixing, jointing and testing in replacement of Bourdon type pressure gauge with gun metal isolation cock and copper ‘U’ Tube.having calibration of 0-14 Kg/cm2 ,and 100 mm dial size all as specified including taking out unserviceable pressure gauge complete all as specified and as directed at site by the Engineer-in-Charge. Make:-Fibig / H.Guru
36
-
-
Supply and Fix CO2 type fire extinguisher 4.5 kg Capacity complete all as specified and directed.Make:- GETECH / Safex / Safegaurd or equivalent.
12
-
-
M&L for filling of CO2 Gas 4.5 KG in existing cylinder complete all as specified and directed.
10
-
-
Supply and fixing, testing and commissioning of 2 Run of 1.5 sq.mm single core HRFR PVC insulated copper conductor(Unsheathed) cable including suitable size PVC conduit of 20 mm dia for connection from Annunciation Panel to MCP and Hooter. Make --- Polycab / Havells/Kalinga
100
-
-
S/F in replacement Pad Lock verical type size 75mm having duplicate key 7 level complete all as specified and directed by EIC. Make Harrison/Link.
59
-
-
Disconnecting & taking out unserviceable Gun metal 2 way Fire brigade inlet to down commer line dismantling and opening carefully for servicing over hauling and shifted to and fro to workshop,material and labour for replacement of unserviceable & worm out GM Parts and rubber packing BNW for butterfly valve etc complete all as specified and as directed by the Engineer-in-Charge.
10
-
-
Disconnecting & taking out unserviceable Gun metal 1 way Fire brigade inlet to down commer line dismantling and opening carefully for servicing over hauling and shifted to and fro to workshop,material and labour for replacement of unserviceable & worm out GM Parts and rubber packing BNW for butterfly valve etc complete all as specified and as directed by the Engineer-in-Charge.
49
-
-
Material and labour for painting with two coat synthetic enamelled paint as per approved colour code of fire fighting Riser Pipe line in Fire nitch ground floor to terrace pipe lines inside the shaft complete all as specified and as directed by the Engineer-in-Charge of following sizes:
-
-
-
(a) 250 mm
395
-
-
(b) 200 mm
300
-
-
( c) 150 mm
180
-
-
M & L for repairing & servicing of butterfly valve of following sizes
-
-
-
(a) 250 mm
16
-
-
(b) 200 mm
12
-
-
( c) 150 mm
15
-
-
S & F in repairs Fire hydrant Brass Adaptor (Coupling) 63MM, IS:5290 mmcomplete all as specified and as directed by the Engineer-in-Charge Make: GETECH/ Safex / Safegaurd or equivalent.
45
-
-
Evaluation Notes How It Works ?
Potential Partner