Military Engineer Services Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date11 Dec 2024
Closing Date8 Jan 2025
Tender Amount₹ 3,38,00,000 
Notes
Download

Costs

Summary

752950a Provn Of Smart Metering System Under The Aor Of Ce Jabalpur Zone

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2. Design, supply, installation, testing, commissioning & integration of Advance Metering Infrastructure (AMI) comprising of performing site survey, deciding/suggesting and setting up the communication network in such a way that SLA related to data availability/connectivity of the consumers are achieved. The design should be in such a way that it must not include more than 33% of a particular make of meter. It will include the following components:-

-

-

-

... More
Item No. 2.1 : Supply, installation, testing and commissioning as in replacement of 01 phase smart electric meter having applicable standard complying with BIS marked IS-16444 : 2015 (Reaffirmed 2020) for all requirement reference voltage 240 Volts, current rating 10-60 Amps, VC1, category, complying of IS 16444 Part-I to starting current, accuracy class 1.0, limits of error, frequency, influence quantities, power consumption of meter, current and voltage circuit running at no load, test output device, meter display , name plate and making meter display, LED/LCD indicators, measuring element, Alarm, Load control, status of load switch, programmability, communication, date exchange protocol, real time clock (RTC), data retention, first breath (power on) and last gap (power off) condition detection and communication to HES, data display facility. Complying to IS 13779 for operating temperature range, humidity complying to IS-15959 part-II for parameters to be measured, max demand resetting, time of use registers, power quality information,

913

-

-

... More
load survey/ internal data, tamper / event recording, Alarm, remote firmware, RTC (Part-II also IS15959). Anti tamper feature as per IS-1959 Part-II. The meter shall be supplied with edequate battery backup for RTC, must have a dedicated sealable slot for accomodation plug-in type bi-directional communication modules which shall integrate the respective communication tech with smart meter, leading to easy adaptability for network interfaces (WAN/NAN). including transparent polycarbonate Meter box complying to IS-14772 suitable for single phase smart Meter having sealable optical port provision on the cover of the meter box conform to IP-54 protection with push fit and hinge type including fixing arrangement such as nut, bolt, washer etc Meter should support communication protocol through (RF/GPRS/Hybrid(GPRS+RF) ) with the software all as required at site and directed. In case of Cellular based meter, the meter shall accommodate SIM card of any service provider. In case of RF Communication, the cost of DCU/Gateway and repeaters are deemed to be included in the rates quoted for meters.

-

-

-

... More
Contractor have to bear the monthly rentals/ data charges for SIM/e-SIM using the network of Mobile service provider, mapping, vending portal charges etc for every meter for 2 Years in case of cellular technology in case of meters which base on cellular technology (cost is deemed to be included in this) and in case of RF meters cost of DCU, Signal boosters including network management and head end system for the project area shall also be included in this item and in case of Hybrid system all hardware/software component also. The plug-in module shall be field swappable / replaceable. The meter shall continue working under tamper condition and would log teh event and send alarm at HES (Head End System) after dedection of the defined tamper features. The minimum data display should include minimum of the following:-

-

-

-

... More
1. Data display shall be in two mades:- (a) Auto Scroll (b) Scroll with push button 2. The display parameter shall be :- (a) Auto scroll (b) Display check (c) Date and time (d) Last recharge amount (e) Last recharge time (f) Current Balance amount (g) Current balance days left (h) cummulative active energy KWH with legend (j) Current calender month MD in KW with legend (k) Instantaneues Voltage (l) Instantaneues phase current (m) Instantaneues load KW (n) Instantaneues average power factor. These parameter should be displayed on the meter display contineously for a period of 10 seconds on auto scroll.

-

-

-

... More
3. Scroll with push button : All parameters mentioned under auto scroll mode should be displayed additionally, the following parameters shall also be displayed:- (a) Internal diagnostic (display check) (b) meter serial number (c) last month commulative KWH with legends (d) Last month MD in KW with legends (e) currenct month average power factor (f) Last month average power factor. Further, the meter shall display high resolution energu values with resolution of 3 digit before decimal and 2 digit after decimal in push button mode. The meter display should return to default display mode (contineous auto scroll) if push button is not operated for more than 10 seconds. Meter display should go in sleep mode during power on condition in case the push button is not operated for more than 10 seconds Notes for item 2.1 (a) It would be possible to run the meter in both prepaid and postpaid mode.

-

-

-

... More
(b) The meters would carry 10 years warranty. (c) The meter should be suitable/run/operate with all approved software. Note : Any technical item missed out which is technically required for Design, supply, installation, testing, commissioning & integration of Advance Metering Infrastructure (AMI) as per E-in-C Branch policy No 12/2023 issued by E-in- C's Branch letter No A/37696/Gen/Pol/E2W(PPC) dt 30 Aug 2023 (uploaded on MES website) during the execution of work without any extra cost.

-

-

-

... More
Item No. 03 : All as per Srl Item No.02 above but for three phase, 4 wires 10 - 60 Amps Smart Energy Meter complete all as specified and directed.

175

-

-

... More
Item No. 04 : Supply and Configuration of the Web based Software to integrate /configuration of smart meter with following modules: (i) Meter Data Management Module :-The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data: (a) Real time energy monitoring with 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency. (b) Monthly billing survey data for Cumulative energy and max demand

1088

-

-

... More
(ii) Prepayment/Billing Module: The system should periodically monitor the energy consumption of prepaid consumers and decrease the available credit based on the consumption. The system should allow online / digital recharging through consumer App (Android and iOS based) and Web portal. The configuration and necessary arrangement for payment gateway and E -MRO facility shall be deemed to be included in the quoted rate. The system should send connect/disconnect command on the basis of available credit. Low credit alarm: The system will give an alarm over the consumer App in case the credit in the meter goes down below a predefined limit. Emergency credit: The meter will work even when the credit falls down to zero to prevent disconnection. This limit shall be configurable. The system should support happy hours in order to prevent disconnection in non-working hours and on holidays. The Happy hours should be configurable. (iii) Occupation and Vacation Module: -The system would support occupation / vacation and billing reports.

-

-

-

... More
Note- The software to be integratedto work with configured software with other meters installed elsewhere under the CE Jabalpur Zone and the contractor is bound to integrate the software with other software for higher level monitoring up to E-in-C Br . (iv) Web site: There would be a dedicated website for the AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android / IOS mobiles app (for admin use). (v) Customer Portal:- The system would include a customer portal for the resident / to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. (vi) Energy Accounting Module: - The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available.

-

-

-

... More
(vii) Communication Module:- The system would provide communication of energy data and bills via App notifications. (viii) Meter Master Data:- The system would support meter master data repository. The system would support meter replacement process. (ix) Excel Export: - The system would support export of metering and billing data in excel format. (x) Customer Care Module :- the software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints andcarry out the necessary activities for the complaints resolution. (xi) The software would be hosted on meity(Ministry of Electronics and Information Technology ) approved Cloud or GCC Cloud. All charges for taking cloud service shall deemed be included in the quoted rate

-

-

-

... More
(xii) Cyber security of software:- The software provided for the smart prepaid meters shall be secure from cyber threats and shall be provided regular security patches and updates including firewall and latest feature updates. Make: As per the OEM of the meter developed in India. (xiii) The AMISP/contractor will be responsible for making the entire AMI system including the service provider immune to Cyber Attacks, while taking care of following guidelines. (a) All the hardware, OS and application software shall be hardened. (b) Application, scanning and hardware scanning tools shall be provided to identify vulnerability & security threats. (c) Date shall be encrypted at system/device/technology level. (d) While procuring cyber security items testing must be done and the system must be secure by design.

-

-

-

... More
(e) Residual information risk shall be calculated by contractor and same shall be submitted for perusal cyber audit teams. (f) Penetration & vulnerability assessment test from certified auditors during Field Acceptance Test (FAT). Site Acceptance test ( SAT) & operations and maintenance period. (g) The system software of smart metering infrastructure may be designed to include prepayment mode recovery of license fee, hire charges for furniture , water charges etc in consultation with Stn HQ , local audit representative and CFA, such software should have necessary fields and administrative login access for local authority to update the recovery rate from time to time.

-

-

-

... More
Notes for Item No 2 (a) The software would contain two year defect liability including all operating expenses such as GPRS charges, hosting charges, sim charges etc. (b) Bank account details will be provided by respective GE. The cost of integration of payment gateway with software and bank account deemed be included in the quoted rates. No extra charges will be paid by MES on account of integration of payment gateway with bank aacount and software. (c) The software would be scalable and expandable for meters and system of different make complying with IS16444. (d) The software should strictly adhere to IS 15959 standard & must be compatible with atleast 3 makes of smart meters that are to be finalised as per above. (e) The software must be audited by CERT India empaneled firm/CERT auditor of Armed Forces and documentary proof of same must be produced at the time of commissioning.

-

-

-

... More
(f) The contractor must arrange/produce a MoU between OEM (maximum quantity of smart meter make installed) and concerned GEs before commencement of work, for technical support ( Upgrading/updating software, troublshooting any kind of problems related tometer/software/communication etc) for 10 years after date of physical completion of work

-

-

-

... More
Head End System (HES) that would be the backbone of web based Software mentioned above shall be capable for meter data Acquistion at user selectable period, maintain time synchronism with smart energy meter and maintain communication device status and will provide visual interface to view the data/events with following features: (a) Remote smart meter data reading at configurable intervals (b) Acquision of meter data on demand. (c) Two way communication with meter (d) Command for connect and disconnect the smart meter. (e) Audit report and event alarm logging (f) Encryption of data for source communication. (g) Maintain time syn. with DCU/meter. (h) Store raw data for duration of one week. (j) Setting of smart meter configurable parameter. (k) Communication device status and history. (l) Critical and non critical meter event like tamper/power failure etc.

-

-

-

... More
Note :(a) AMI software and associated equipment should be capable of handling 600 Nos of meters of 04 different makes as per BIS 16444 with 25% expansion without any additional infrastructure and cost implication. (b) in case superior specification of server are required as per the requirement on ground, the contractor shall provide the same without any extra cost. (c) Cyber security clearance for server and software and any other instruction which has been missed out but technically required to be done by the contractor as per the policy No 12/2023 issued by E-in-C's Branch letter No A/37696/Gen/Pol/E2W(PPC) dt 30 Aug 2023 (Uploaded on MES web site) during the execution of work without any extra cost.

-

-

-

... More
Item No. 05 : PHASE- II Provision for comprehensive operation including periodic charges of telecom operator, smart meter billing from completion of work till the completion of defect liability period of 02 years complete all as specified & directed. The duties shall also include the following:- (a) Managing vending Station activities like offline recharge in case of any bug in online recharge system, meter recharge, report/record generation etc. (b) Regular updation of tariff rate in the system as per govt policies. (c) Registering any problem that may occur in the network and co-ordinating for smooth functioning of the system.

18144

-

-

... More
(d) Deploying all measures for corrective actions as and when required (d) Acting as a link between users and the parent company providing the metering system. (e) Providing hands on training to the MES personnel as and when required. (f) Collecting cash in case of offline recharge, offline/online payment details etc and handing over to the MES rep. (g) To provide any other associated technical support. (h) Running and maintaining vending station. (j) Any other work required to maintain the complete system efficiently. Note: This item shall be operative on declaring all meters commissioned.

-

-

-

... More
Item No. 06 : WORK UNDER PHASE-III Comprehensive operation and maintenance of system including project implementation &management, all expenditure including periodic charges of telecom operator, smart meter billing and maintenance after completion of defect liability period (phase II) till completion for 08 years extendable to further 02 years after mutual agreement complete all as specified & directed. The following items are also deemed to be included:- (a) Monthly sim/internet rental charges for the DCU/Gateway. The contractor would ensure supply of appropriate SIMs to ensure necessary signal availability. The contractor would change the sim or sim provider as required. In case of network issues, the contractor would arrange broadband internet connection. (b) Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts. (c) Software AMC. This would include necessary upgradations in the software such as support to the chrome browser changes, android version changes , iOS version changes. These changes happen on frequent basis and the software would support all the changes.

130560

-

-

... More
(d) Changes in the government tariff structure. The government tariff structure changes may require software upgrade. The same would be included in the AMC scope of work. (e) Remote server admin support - Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. (f) Reports Development - The additional reports as needed for the success of the project would be developed (g) Software installation on any alternate / backup server if required (h) The communication network monitoring and support (i) Configuration of the repaired / replaced hardware in the system (j) Trouble shooting and necessary actions to run the system as required. (k) Software bug fixing as and when required (l) CERT audit of smart metering system will be carried out after every three years. (m) Any other work required to maintain the complete system efficiently.

-

-

-

... More
Item No. 07 : M & L for Sub main wiring for three phase with approved colour coding as per IS with four single core PVC insulated FRLSh cable with stranded copper conductor of size 6 Sq mm nominal area and drawing into suitable size of PVC non metallic rigid heavy duty PVC conduit of white/ ivory colour and its accessaries ISI marked heavy duty of suitable size including concealed in wall etc one run of PVC insulated with 6.0 Sqmm (nominal area) stranded copper conductor FRLSh cable as earth wire complete all as specified and as directed. Note:- four runs of 6 sqmm cable( for phase and neutral) ,one run of 6 sqmm cable for earth and one run of PVC conduit including cutting chasing making good if required will be measured as one unit

606

-

-

... More
Item No. 08 : M & L for Sub main wiring for three phase with approved colour coding as per IS with two single core PVC insulated FRLSh cable with stranded copper conductor of size 6 Sq mm nominal area and drawing into suitable size of PVC non metallic rigid heavy duty PVC conduit of white/ ivory colour and its accessaries ISI marked heavy duty of suitable size including concealed in wall etc one run of PVC insulated with 6.0 Sqmm (nominal area) stranded copper conductor FRLSh cable as earth wire complete all as specified and as directed. Note:- two runs of 6 sqmm cable( for phase and neutral) ,one run of 6 sqmm cable for earth and one run of PVC conduit including cutting chasing making good if required will be measured as one unit

770

-

-

... More
Item No. 09 : Supply and fix MCB TPN 40-63 amps 10 KA, 'C' series including connection with suitable size aluminium / copper lugs complete all as specified and directed by Engr-in-Charge.

110

-

-

... More
Item No. 10 : Supply and fix MCB SPN 6 to 32 amps 10 KA, 'C' series including connection with suitable size aluminium / copper lugs complete all as specified and directed by Engr-in-Charge. Make Indoasian or equivalent in Havells/L&T / ABB /scheider

352

-

-

... More
Item No. 11 : Supply and fix MCB SPN 6 to 40amps 10 KA, 'C' series including connection with suitable size aluminium / copper lugs complete all as specified and directed by Engr-in-Charge.

50

-

-

... More
Item No. 12 : M & L for Sub main wiring for single phase with approved colour coding as per IS with two single core PVC insulated FRLSh cable with stranded copper conductor of size 10 Sq mm nominal area and drawing into suitable size of PVC non metallic rigid heavy duty PVC conduit of white/ ivory colour and its accessaries ISI marked heavy duty of suitable size including concealed in wall etc one run of PVC insulated with 10.0 Sqmm (nominal area) stranded copper conductor FRLSh cable as earth wire complete all as specified and as directed. Note:-Two runs of 10 sqmm cable( for phase and neutral) ,one run of 10sqmm cable for earth and one run of PVC conduit including cutting chasing making good if required will be measured as one unit

1093

-

-

... More
Item No. 13: Supply testing and install with following specifications including basic training of staff for 30 days (i) All -in-one PC with following specification (01 No) (a) Processor : intel Core i7-13700K or AMD Ryzen 9 7900X (b) Memory: 32 GB DDR5-4800 RAM (c) Storage: 1TB NVMe M.2 SSD (d) Display: 27-inch 4K IPS display with 120 Hz refresh rate and G-SYNC/Free Sync support (e) Graphics Card: NVIDIA GeForce RTX 3080 or AMD Radeon RX 6800 XT (f) Operating System: Windows 11 Pro (ii) Broadband Connection: Minimum 300 Mbps broadband connection for 05 years (Cost is deemed to be included in the quoted rates) (iii) Computer table and chair for installation of PC & Printer (01 No)

2

-

-

... More
Item No. 14 : Supply testing and installation of Laser Jet All-in-one Printer (01 No) with following specification (i) Print speed : Upto 30 Pages per minute (PPM) in black and white , up to 25 PPM in color (ii) Scan Resolution: 1200 x 1200 dpi (iii) Copy Resolution: 600 x 600 dpi (iv) Paper Capacity: 500- Sheet input tray, 100- sheet output tray (v)Duplex Printing: Automatic duplex printing (vi) Wireless printing: Yes (vii)Cable Management : Cable

2

-

-

... More
SCHEDULE "A" (Schedule of credit) Schedule of Credit Rs 9760.00 (Minus) inserted by the MES. (Note : Credit amount shall be deducted manually to arrive net Contract Sum)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.