Health And Family Welfare Department Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Health And Family Welfare Department - HFWD Tender

Opening Date8 Aug 2018
Closing Date8 Aug 2018
Tender Amount₹ 43,20,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
F1

100.8

-

-

... More
F2

61.24

-

-

... More
Curtain Wall x direction

0.81

-

-

... More
Curtain Wall y direction

0.59

-

-

... More
Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed.

-

-

-

... More
Ordinary rock

-

-

-

... More
Footing

-

-

-

... More
F1

33.6

-

-

... More
F2

20.41

-

-

... More
Extra for every additional lift of 1.5 m or part thereof in.

-

-

-

... More
All kinds of soil.

-

-

-

... More
Footing

-

-

-

... More
F1

16.8

-

-

... More
F2

10.21

-

-

... More
Ordinary or hard rock.

-

-

-

... More
Footing

-

-

-

... More
F1

33.6

-

-

... More
F2

20.41

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
With 40mm nominal size graded stone aggregate.

-

-

-

... More
M 15 - Grade concrete

-

-

-

... More
Footing

-

-

-

... More
F1

8.4

-

-

... More
F2

5.1

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Foundations, footings, bases of columns, etc. for concrete up to plinth level.

-

-

-

... More
Footing 2 ( L+ B )

-

-

-

... More
F1 1400 X 1600

65

-

-

... More
F2 1800 X 2100

31.5

-

-

... More
Walls (any thickness) including attached pilasters butteresses, plinth beams and string courses etc.up to plinth level.

-

-

-

... More
Column Upto Plinth 2 ( L+ B )

-

-

-

... More
C1 300 x 300

64.5

-

-

... More
C2 300 x 400

27.09

-

-

... More
Plinth Beam X- Direction ( 2D+ B )

-

-

-

... More
PB1 200 X 300

-

-

-

... More
Open Area

16

-

-

... More
Washing Area

20.48

-

-

... More
Collection Room

12.96

-

-

... More
Record Room

5.44

-

-

... More
Toilet

7.36

-

-

... More
Covered Area

6.72

-

-

... More
Ironing Area

10.8

-

-

... More
Plinth Beam Y- Direction ( 2D+ B )

-

-

-

... More
PB1 200 X 300

-

-

-

... More
Open Area

4

-

-

... More
Washing Area

14.88

-

-

... More
Collection Room

12

-

-

... More
Despatch Room

14.4

-

-

... More
Toilet

3.6

-

-

... More
Covered Area

14.08

-

-

... More
Ironing Area

3.6

-

-

... More
R.C.C.Curtain Wall x direction

24.36

-

-

... More
R.C.C.Curtain Wall Y direction

17.76

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :

-

-

-

... More
M 20 Nomial mix

-

-

-

... More
Footing

-

-

-

... More
F1

21

-

-

... More
F2

13.68

-

-

... More
Column Upto plinth level

-

-

-

... More
C1 300 x 300

4.84

-

-

... More
C2 300 x 400

2.32

-

-

... More
Plinth Beam X- Direction

-

-

-

... More
PB1 200 X 300

-

-

-

... More
Open Area

1.26

-

-

... More
Washing Area

1.54

-

-

... More
Collection Room

0.97

-

-

... More
Record Room

0.82

-

-

... More
Toilet

0.79

-

-

... More
Despatch Room

1.12

-

-

... More
Ironing Area

0.81

-

-

... More
Plinth Beam Y- Direction

-

-

-

... More
PB1 200 X 300

-

-

-

... More
Open Area

0.3

-

-

... More
Washing Area

1.12

-

-

... More
Collection Room

0.72

-

-

... More
Record Room

0.72

-

-

... More
Toilet

0.7

-

-

... More
Despatch Room

1.12

-

-

... More
Ironing Area

0.81

-

-

... More
R.C.C.Curtain Wall x direction

1.22

-

-

... More
R.C.C.Curtain Wall Y direction

0.89

-

-

... More
Filling available excavated earth (excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

-

-

-

... More
Quantity As per Item No. 1

163.65

-

-

... More
Quantity As per Item No. 2

54.01

-

-

... More
Supplying and filling in plinth with crusher stone dust / coarse sand under floors including, watering, ramming consolidating in layers not exceeding 20cm in depth and dressing complete

-

-

-

... More
Filling

-

-

-

... More
Dirty Linen

2.43

-

-

... More
Collection Room

1.53

-

-

... More
Record Room

1.53

-

-

... More
Passage

2.32

-

-

... More
Despatch Room

1.89

-

-

... More
Distribution Room

1.89

-

-

... More
Sorting Area

1.86

-

-

... More
Toilet Office

0.77

-

-

... More
Foyer

0.74

-

-

... More
Washing Area

5.95

-

-

... More
Cloth Drying

4.19

-

-

... More
Boiler

1.68

-

-

... More
Ironing Area

4.32

-

-

... More
Covered Area

5.61

-

-

... More
General Toilet

1.16

-

-

... More
Open Area

7.61

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
With 40mm nominal size graded stone aggregate.

-

-

-

... More
Nominal Mix -1 Cement : 3 sand : 6 graded stone aggregate (M 10)

-

-

-

... More
Dirty Linen

1.62

-

-

... More
Collection Room

1.02

-

-

... More
Record Room

1.02

-

-

... More
Passage

1.55

-

-

... More
Despatch Room

1.26

-

-

... More
Distribution Room

1.26

-

-

... More
Sorting Area

1.24

-

-

... More
Toilet Office

0.51

-

-

... More
Foyer

0.49

-

-

... More
Washing Area

3.97

-

-

... More
Cloth Drying

2.79

-

-

... More
Boiler

1.12

-

-

... More
Ironing Area

2.88

-

-

... More
Covered Area

3.74

-

-

... More
General Toilet

0.78

-

-

... More
Open Area

5.08

-

-

... More
Preconstruction antitermite treatment to the building under construction by providing

-

-

-

... More
Stage 1: Treating the bottom and the sides (upto 30cm hight of the excavated trench @ 5 litter per sqm of the surface area.

-

-

-

... More
Stage 2: After masonry/RCC work, the backfill in the immdiate contact with the foundation structure treatment @ 7.5 litter per sqm. of the vertical surface of the substructure for each side.

-

-

-

... More
Stage 3: surface treatment by spreading emulsion over the plinth area before laying the base concrete under floors @ 5.0 litres/Sqm.

-

-

-

... More
Stage 4: Pumping the emulsion in plinth masonry on filling side at floor junction @ 7.5 litres/Sqm.

-

-

-

... More
Stage 5: Pumping the emulsion from outer side of the plinth below ground alround the masonry @ 5.0 litres/Sqm as per I.S. 8944 Emulsion. (1Chlorpyrifos: 19 water) with five years service guarantee (Measurements to be taken for plinth area)

-

-

-

... More
Note – Treatment should start when foundation trenches and pits are ready to take bed concrete or leveling course in foundations. Laying of bed concrete should start when the chemical emulsion has been absorbed by the soil and the surface is reasonably dry. Treatment should not be carried out when it is raining or when soil is wet with rain or subsoil water. This also applies to filled up soil within the plinth area before laying the subgrade for flooring.

-

-

-

... More
Dirty Linen

17.92

-

-

... More
Collection Room

11.52

-

-

... More
Record Room

11.52

-

-

... More
Passage

17.6

-

-

... More
Despatch Room

14.08

-

-

... More
Distribution Room

14.08

-

-

... More
Sorting Area

14.08

-

-

... More
Toilet Office

6.12

-

-

... More
Foyer

4.93

-

-

... More
Washing Area

40.96

-

-

... More
Cloth Drying

30.08

-

-

... More
Boiler

12.58

-

-

... More
Ironing Area

31.02

-

-

... More
Covered Area

40.04

-

-

... More
General Toilet

8.37

-

-

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete.

-

-

-

... More
Thermo-Mechanically Treated bars.(TMT)

-

-

-

... More
Total Quantity of R.C.C. 56.73 @100 Kg /Cum

5673

-

-

... More
Making plinth protection 50mm thick of cement concrete grade M10 over 75mm bed of dry metal ballast 40mm nominal size well rammed and consolidated and filled with sand including finishing the top smooth (with 20mm nominal size graded stone aggregate.)

-

-

-

... More
Description

-

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Columns, Pillars, Piers, Abutments, Posts and Struts.

-

-

-

... More
Column for Ground Floor

-

-

-

... More
C1 300 x 300

93

-

-

... More
C2 300 x 400

39.06

-

-

... More
Lintels, beams, girders, bressumers and cantilevers.

-

-

-

... More
G.F.Lintel Beam X-Direction 200 x 200 (2D+B)

-

-

-

... More
Open Area

12.6

-

-

... More
Washing Area

15.36

-

-

... More
Collection Room

9.72

-

-

... More
Record Room

8.16

-

-

... More
Toilet

7.92

-

-

... More
Despatch Room

11.16

-

-

... More
Ironing Area

8.1

-

-

... More
Lintel Beam Y- Direction ( 2D+ B )

-

-

-

... More
Open Area

3

-

-

... More
Washing Area

11.16

-

-

... More
Collection Room

7.2

-

-

... More
Record Room

7.2

-

-

... More
Toilet

7.02

-

-

... More
Despatch Room

11.16

-

-

... More
Ironing Area

8.1

-

-

... More
B1 Ground Floor Roof Beam X Direction 200X 400 ( 2D-SLAB THK )

-

-

-

... More
Washing Area

17.66

-

-

... More
Collection Room

11.18

-

-

... More
Record Room

9.38

-

-

... More
Toilet

9.11

-

-

... More
Despatch Room

12.83

-

-

... More
Ironing Area

9.32

-

-

... More
B1 Ground Floor Roof Beam Y Direction 200X 400 ( 2D )

-

-

-

... More
Washing Area

12.83

-

-

... More
Collection Room

8.28

-

-

... More
Record Room

8.28

-

-

... More
Toilet

8.07

-

-

... More
Despatch Room

12.83

-

-

... More
Ironing Area

9.32

-

-

... More
Suspended floors, roofs, landings, balconies and access platform

-

-

-

... More
Slab Ground Floor

-

-

-

... More
Dirty Linen

17.92

-

-

... More
Collection Room

11.52

-

-

... More
Record Room

11.52

-

-

... More
Passage

17.6

-

-

... More
Despatch Room

14.08

-

-

... More
Distribution Room

14.08

-

-

... More
Sorting Area

14.08

-

-

... More
Toilet Office

6.12

-

-

... More
Foyer

4.93

-

-

... More
Washing Area

40.96

-

-

... More
Cloth Drying

30.08

-

-

... More
Boiler

12.58

-

-

... More
Ironing Area

31.02

-

-

... More
Covered Area

40.04

-

-

... More
General Toilet

8.37

-

-

... More
Chajja Projection x direction

-

-

-

... More
Wash Area

12.8

-

-

... More
Chajja Projection Ydirection

-

-

-

... More
Room

18.4

-

-

... More
Reinforced cement concrete work (with 20mm nominal size graded stone aggregate) in beams, suspended floors, roofs having slope of any degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level and up to floor two level excluding the cost of centering, shuttering, finishing and reinforcement in concrete grade

-

-

-

... More
M 20 –Grade Concrete

-

-

-

... More
G.F.Lintel Beam X-Direction 200 x 200

-

-

-

... More
Open Area

0.84

-

-

... More
Washing Area

1.02

-

-

... More
Collection Room

0.65

-

-

... More
Record Room

0.54

-

-

... More
Toilet

0.53

-

-

... More
Despatch Room

0.74

-

-

... More
Ironing Area

0.54

-

-

... More
Lintel Beam Y- Direction ( 2D+ B )

-

-

-

... More
Open Area

0.2

-

-

... More
Washing Area

0.74

-

-

... More
Collection Room

0.48

-

-

... More
Record Room

0.48

-

-

... More
Toilet

0.47

-

-

... More
Despatch Room

0.74

-

-

... More
Ironing Area

0.54

-

-

... More
Chajja Projection x direction

-

-

-

... More
Wash Area

1.23

-

-

... More
Chajja Projection Ydirection

-

-

-

... More
Room

1.77

-

-

... More
Reinforced cement concrete work (with 20mm nominal size graded stone aggregate) in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, posts and struts etc. above plinth level and up to floor two level excluding cost of centering, shuttering, finishing and reinforcement :

-

-

-

... More
M 20 –Grade Concrete

-

-

-

... More
Column for Ground Floor

-

-

-

... More
C1 300 x 300

6.98

-

-

... More
C2 300 x 400

3.35

-

-

... More
B1 Ground Floor Roof Beam X Direction 200X 300 (DEPTH = BEAM D-SLAB THK)

-

-

-

... More
B1 Ground Floor Roof Beam X Direction 200X 300 ( (DEPTH = BEAM D-SLAB THK)

-

-

-

... More
Washing Area

0.97

-

-

... More
Collection Room

0.62

-

-

... More
Record Room

0.52

-

-

... More
Toilet

0.5

-

-

... More
Despatch Room

0.71

-

-

... More
Ironing Area

0.51

-

-

... More
B1 Ground Floor Roof Beam Y Direction 200X 300 ( 2D )

-

-

-

... More
Washing Area

0.71

-

-

... More
Collection Room

0.46

-

-

... More
Record Room

0.46

-

-

... More
Toilet

0.44

-

-

... More
Despatch Room

0.71

-

-

... More
Ironing Area

0.51

-

-

... More
Slab Ground Floor

-

-

-

... More
Dirty Linen

1.97

-

-

... More
Collection Room

1.27

-

-

... More
Record Room

1.27

-

-

... More
Passage

1.94

-

-

... More
Despatch Room

1.55

-

-

... More
Distribution Room

1.55

-

-

... More
Sorting Area

1.55

-

-

... More
Toilet Office

0.67

-

-

... More
Foyer

0.38

-

-

... More
Washing Area

4.51

-

-

... More
Cloth Drying

3.31

-

-

... More
Boiler

1.38

-

-

... More
Ironing Area

3.41

-

-

... More
Covered Area

4.4

-

-

... More
General Toilet

0.92

-

-

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete.

-

-

-

... More
Thermo-Mechanically Treated bars.(TMT)

-

-

-

... More
Total Quantity of R.C.C. 11.53 @120 Kg /Cum

1383.6

-

-

... More
Total Quantity of R.C.C. 51.63 @120 Kg /Cum

5701.48

-

-

... More
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying :

-

-

-

... More
a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm.

-

-

-

... More
b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.

-

-

-

... More
c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around.

-

-

-

... More
Slab Ground Floor area

-

-

-

... More
Dirty Linen

17.92

-

-

... More
Collection Room

11.52

-

-

... More
Record Room

11.52

-

-

... More
Passage

17.6

-

-

... More
Despatch Room

14.08

-

-

... More
Distribution Room

14.08

-

-

... More
Sorting Area

14.08

-

-

... More
Toilet Office

6.12

-

-

... More
Foyer

3.48

-

-

... More
Washing Area

40.96

-

-

... More
Cloth Drying

30.08

-

-

... More
Boiler

12.58

-

-

... More
Ironing Area

31.02

-

-

... More
Covered Area

40.04

-

-

... More
General Toilet

8.37

-

-

... More
Brick work with fly ash lime bricks (FALG Bricks) conforming to IS:12894-2002, in super structure above plinth level up to floor II level in :

-

-

-

... More
having 100 kg / cm2 average compressive strength

-

-

-

... More
Cement mortar 1:6 (1 cement : 6 sand)

-

-

-

... More
Brick masonry Ground Floor X Direction 200mmThk

-

-

-

... More
Open Area

10.5

-

-

... More
Washing Area

15.87

-

-

... More
Collection Room

10.04

-

-

... More
Record Room

8.43

-

-

... More
Toilet

8.18

-

-

... More
Despatch Room

11.53

-

-

... More
Ironing Area

8.37

-

-

... More
Brick masonry Ground Floor Y Direction 200mmThk

-

-

-

... More
Open Area

2.5

-

-

... More
Washing Area

11.53

-

-

... More
Collection Room

7.44

-

-

... More
Record Room

7.44

-

-

... More
Toilet

7.25

-

-

... More
Despatch Room

11.53

-

-

... More
Ironing Area

8.37

-

-

... More
Deduction For Door & Windows

-

-

-

... More
D1

0.72

-

-

... More
D2

4.2

-

-

... More
W2

1.73

-

-

... More
W1

3.6

-

-

... More
Collassible Door

1.86

-

-

... More
V1

0.72

-

-

... More
Net Quantity ( A - B )

116.17

605498

5212

... More
ParapetWall

8.12

-

-

... More
Half brick masonry with fly ash lime Gypsum bricks (FALG bricks) conforming to IS : 12894, in super structure above plinth and upto floor two level.

-

-

-

... More
having 100 kg/cm2 average compressive strength

-

-

-

... More
Cement mortar 1 : 4 (1 cement : 4 sand)

-

-

-

... More
Brick masonry Ground Floor Toilet

14.88

-

-

... More
Brick masonry Ground Floor Toilet

13.02

-

-

... More
Deduction For Door

-

-

-

... More
D4 B =

6.72

-

-

... More
Net Quantity ( A - B )

21.18

14741

696

... More
Extra for providing and placing in position 2 Nos. 8mm dia. M.S. bars at every third course of half brick masonry.

-

-

-

... More
Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded (wherever required) and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in flooring laid over 20mm thick base of cement mortar 1:4 (1cement : 4 sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge.

-

-

-

... More
All Shades /colour other than black

-

-

-

... More
Area of slab more than 0.50 sqm.

-

-

-

... More
Ironing Platform

7.08

-

-

... More
Providing and fixing stone slab table rubbed on both faces edges rounded and polished of size as required and 1.8 cm thick fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 6 mm nominal size) as per direction of Engineer-in-charge and finished smooth.

-

-

-

... More
White Agaria Marble Stone

0.9

2741

3046

... More
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 sand) :

-

-

-

... More
25 mm thick.

-

-

-

... More
G.F. Coorridor

-

-

-

... More
Dirty Linen

16.2

-

-

... More
Collection Room

10.2

-

-

... More
Record Room

10.2

-

-

... More
Passage

15.48

-

-

... More
Despatch Room

12.6

-

-

... More
Distribution Room

12.6

-

-

... More
Sorting Area

12.4

-

-

... More
Toilet Office

5.1

-

-

... More
Foyer

4.93

-

-

... More
Washing Area

39.68

-

-

... More
Cloth Drying

27.9

-

-

... More
Boiler

11.2

-

-

... More
Ironing Area

28.8

-

-

... More
Covered Area

37.38

-

-

... More
General Toilet

7.75

-

-

... More
Open Area

50.75

-

-

... More
Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete.

-

-

-

... More
Skirting

12.18

-

-

... More
Providing and laying rectified Glazed Ceramic wall tiles 300x450 mm or more (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 12 mm thick Cement Mortar 1:3 (1 Cement : 3 sand) including pointing the joints with white cement and matching pigments etc., complete.

-

-

-

... More
Toilet office

14.28

-

-

... More
Toilet General

12.18

-

-

... More
Deduct

-

-

-

... More
D2

4.2

-

-

... More
D3

6.72

-

-

... More
V

3.6

-

-

... More
Net Quantity A - B

47.01

33659

716

... More
Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm and braced with flat iron diagonals 20x5mm size with top and bottom rail of T-iron 40x40x6mm with 40mm dia steel pulleys complete with bolts, nuts, locking arrangement, stoppers,handles, including applying a priming coat of approved steel primer. Rate includes recess cutting in floor and making good the same wherever required.

14.4

59499

4131.9

... More
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :

-

-

-

... More
For fixed portion

-

-

-

... More
Powder coated aluminium (minimum thickness of powder coating 50 micron)

-

-

-

... More
Windows & Doors

-

-

-

... More
W2

8.64

-

-

... More
W1

18

-

-

... More
V1

3.6

-

-

... More
5 kg

169.2

63788

377

... More
For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of PVC / neoprene gasket required (Fittings shall be paid for separately).

-

-

-

... More
Powder coated aluminium (minimum thickness of powder coating 50 micron)

-

-

-

... More
Door & Windows

-

-

-

... More
W2

8.64

-

-

... More
W1

18

-

-

... More
V1

3.6

-

-

... More
5 kg

169.2

71910

425

... More
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber/ neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item) :

-

-

-

... More
With float glass panes of 5.50 mm thickness

30.24

28183

932

... More
Providing and fixing fly proof stainless steel grade 304 wire gauge, to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia. 0.50 mm all complete.

-

-

-

... More
With 12 mm mild steel U beading.

5

6850

1370

... More
Providing and fixing stainless steel (SS 304 grade) adjustable friction windows stays of approved quality with necessary stainless steel screws etc. to the side hung windows as per direction of Engineer-in- charge complete.

-

-

-

... More
355 X 19 mm

2

608

304

... More
Providing and fixing 100mm brass locks (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete.

11

5357

487

... More
Providing and fixing aluminium round shape handle of outer dia 100mm with SS screws etc. Complete as per direction of Engineer-in-charge

-

-

-

... More
Powder coated minimum thickness 50 micron aluminium

2

164

82

... More
Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete

-

-

-

... More
Shelves

11.52

-

-

... More
11.52 x 10 kg

115.2

7522

65.3

... More
Providing and fixing aluminium hanging floor door stopper ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour and shade with necessary screws etc. complete.

11

385

35

... More
Single rubber stopper

-

-

-

... More
Providing and fixing aluminium sliding door bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with nuts and screws etc. complete :

-

-

-

... More
300x16 mm

16

3856

241

... More
Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade with necessary screws etc. complete :

-

-

-

... More
300x10 mm

16

1824

114

... More
Providing and fixing aluminium handles ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc. complete:

-

-

-

... More
125 mm

16

1200

75

... More
100 mm

16

880

55

... More
Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters of such as duro board, century or equivelant make.

-

-

-

... More
30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws.

-

-

-

... More
Door size D2 = 1x 2.1

21

76860

3660

... More
Extra for providing lipping with 2nd class teak wood battens 25 mm minimum depth on all edges of flush door shutters (over all area of door shutter to be measured).

-

-

-

... More
Door size D4 = 1.0x 2.1

21

-

-

... More
Providing and fixing pressed steel door frames conforming to IS: 4351 manufactured from commercial mild steel sheet including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25mm, or base ties of 1.60 mm pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges, 2.5mm thick with mortar guards, lock strike-plate and shock absorbers as specified filling the frame with Cement Concrete 1:3:6 at site before fixing (cost of concrete to be paid separately) and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge:

-

-

-

... More
Profile C of 1.60mm thick single rebate of size 100mmx50mm

-

-

-

... More
Fixing with adjustable lugs with split end tail to each jamb.

-

-

-

... More
Single rebate ( size, 100 mm x 50 mm)

-

-

-

... More
D2= 1.0x 2.1 ( 2.1X2 + 1 = 5.2 Rm )

52

22432

431.4

... More
Providing and fixing factory made UPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance ±1mm), with wall thickness 2.0 mm (± 0.2mm), corners of the door frame to be Jointed with galvanized brackets and stainless steel screws, joints mitred and Plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 X 19mm and 1mm (± 0.1 mm) wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturers specification and direction of Engineer-in-charge:

-

-

-

... More
Extruded section Profile size 42x50 mm.

-

-

-

... More
Tolilet Door Size D3 = 0.8 x 2.1

20

4160

208

... More
Providing and fixing to existing door frames.

-

-

-

... More
30 mm thick factory made Polyvinyl Chloride (PVC) door shutter made of styles and rails of a uPVC hollow section of size 60x30 mm and wall thickness 2 mm (± 0.2 mm), with inbuilt decorative moulding edging on one side. The styles and rails mitred and joint at the corners by means of M.S. galvanised/plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 25x20 mm and 1 mm (± 0.1 mm) wall thickness. The lock rail made up of 'H' section, a uPVC hollow section of size 100x30 mm and 2 mm (± 0.2 mm) wall thickness fixed to the shutter styles by means of plastic/ galvanised M.S. 'U' cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm (± 0.1 mm) wall thickness . The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer's specification and direction of Engineer-in-charge.

-

-

-

... More
Tolilet Door Size D3 = 0.8 x 2.1

6.72

20973

3121

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

-

-

-

... More
14 X 10 Kg

140

9618

68.7

... More
Providing for plaster drip course/ groove in plastered surface or moulding to R.C.C. projections.

34

629

18.5

... More
Providing and fixing chicken mesh as per ISI specification and in the required width with 50mm long Bombay nails on vertical and horizontal junctions of RCC and brick wall including scaffolding and all lead and lift etc. complete before plastering upt 10 meter height.

58

3596

62

... More
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.

-

-

-

... More
In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.

25

2146

85.85

... More
6 mm cement plaster of mix :

-

-

-

... More
1:3 (1 cement : 3 sand)

-

-

-

... More
Slab Ground Floor

-

-

-

... More
Dirty Linen

17.92

-

-

... More
Collection Room

11.52

-

-

... More
Record Room

11.52

-

-

... More
Passage

17.6

-

-

... More
Despatch Room

14.08

-

-

... More
Distribution Room

14.08

-

-

... More
Sorting Area

14.08

-

-

... More
Toilet Office

6.12

-

-

... More
Foyer

3.48

-

-

... More
Washing Area

40.96

-

-

... More
Cloth Drying

30.08

-

-

... More
Boiler

12.58

-

-

... More
Ironing Area

31.02

-

-

... More
Covered Area

40.04

-

-

... More
General Toilet

8.37

-

-

... More
12 mm cement plaster of mix :

-

-

-

... More
1:6 (1 cement : 6 sand)

-

-

-

... More
Plaster Ground Floor X Direction 12mmThk

-

-

-

... More
Open Area

73.5

-

-

... More
Washing Area

89.6

-

-

... More
Collection Room

56.7

-

-

... More
Record Room

47.6

-

-

... More
Toilet

46.2

-

-

... More
Despatch Room

65.1

-

-

... More
Ironing Area

47.25

-

-

... More
Ground Floor Y Direction 12mmThk

-

-

-

... More
Open Area

17.5

-

-

... More
Washing Area

65.1

-

-

... More
Collection Room

42

-

-

... More
Record Room

42

-

-

... More
Toilet

40.95

-

-

... More
Despatch Room

65.1

-

-

... More
Ironing Area

47.25

-

-

... More
Deduction For Door & Windows

-

-

-

... More
D1

3.6

-

-

... More
D2

21

-

-

... More
W2

8.64

-

-

... More
W1

18

-

-

... More
Collassible Door

9.3

-

-

... More
V1

3.6

-

-

... More
Net Quantity A -B

681.71

74988

110

... More
ParapetWall

40.6

-

-

... More
15 mm cement plaster on the rough side of single or half brick wall of mix :

-

-

-

... More
1:6 (1 cement : 6 sand)

-

-

-

... More
Toilet office

9.52

-

-

... More
Toilet General

8.12

-

-

... More
Deduction For Door

20.02

-

-

... More
D4 B =

1.68

-

-

... More
Net Quantity ( A - B )

18.34

2347

128

... More
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 sand) finished with a top layer 6mm thick cement plaster 1:4 (1 cement : 4 sand).

-

-

-

... More
Outer Wall

194.88

-

-

... More
Deduct

-

-

-

... More
D1

3.6

-

-

... More
W2

8.64

-

-

... More
W1

22.5

-

-

... More
Jali

4.32

-

-

... More
V1

3.6

-

-

... More
Net Quantity

297.9

50940

171

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, Like birla white /JK white or equivalent, over the plastered wall surface to prepare the surface even and smooth i/c all cost of material, labour and scaffold etc in all position complete.

-

-

-

... More
As per Quantity

297

21978

74

... More
Providing and applying special putty in two coats based materials varnish, Belgium chalk, turpentile oil, white paint,safeda including sand papering for making the surface smooth for applying any or vinyl paints including all cost of material and labour etc complete.

-

-

-

... More
As per Quantity

681

35412

52

... More
Finishing walls with textured exterior paint of required shade :

-

-

-

... More
New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm.

297

39204

132

... More
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:

-

-

-

... More
Two or more coats on new work

681

43584

64

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:

-

-

-

... More
Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

70

5390

77

... More
Description

-

-

-

... More
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.

-

-

-

... More
Internal work - Exposed on wall

-

-

-

... More
Internal work

-

-

-

... More
15 mm dia. nominal bore

12

-

-

... More
20 mm dia. nominal bore

12

-

-

... More
25 mm dia. nominal bore

15

-

-

... More
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge.

-

-

-

... More
Concealed work including cutting chases and making good the walls etc.,

-

-

-

... More
15 mm dia nominal bore

25

5175

207

... More
20 mm dia nominal bore

15

3510

234

... More
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings. This included jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer in Charge.

-

-

-

... More
External work

-

-

-

... More
15 mm nominal outer dia .Pipes.

4

488

122

... More
20 mm nominal outer dia .Pipes.

6

846

141

... More
25 mm nominal outer dia .Pipes.

2

370

185

... More
32 mm nominal outer dia .Pipes.

2

476

238

... More
40 mm nominal outer dia .Pipes.

2

648

324

... More
50 mm nominal outer dia .Pipes.

4

1992

498

... More
75 mm nominal inner dia .Pipes.

6

12108

2018

... More
Providing and fixing brass bib cock of approved quality :

-

-

-

... More
15 mm nominal bore

8

2448

306

... More
Providing and fixing brass stop cock of approved quality :

-

-

-

... More
15 mm nominal bore

6

1908

318

... More
Providing and fixing CPVC gate valve with knob of approved quality.

-

-

-

... More
25 mm nominal bore

2

856

428

... More
Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete :

-

-

-

... More
25 mm nominal bore

9

4491

499

... More
Providing and fixing brass ferrule with C.I. mouth cover including boring and tapping the main :

-

-

-

... More
15 mm nominal bore

1

236

236

... More
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank

9000

63000

7

... More
Providing and laying below ground unplasticised PVC pipe to with stand working pressure of 4 kg/cm2 soild waste pipes confirming to IS:13592 and IS:4985 including jointing with seal ring confirming to IS :5282 leaving 10mm gap for thermal expansion all necessary fittings etc. complete. Excavation to be paid seperataly.

-

-

-

... More
110 mm diameter OD

4

-

-

... More
160 mm diameter OD

4

-

-

... More
200 mm diameter OD

6

4506

751

... More
Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20 mm nominal size) all-round PVC. pipes including bed concrete as per standard design:

-

-

-

... More
110 mm diameter PVC. pipe

12

6912

576

... More
160 mm diameter PVC. pipe

4

2816

704

... More
200 mm diameter PVC. pipe

4

3284

821

... More
Providing and fixing square-mouth S.W. gully trap class SP1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design :

-

-

-

... More
100x100 mm size P type

4

7056

1764

... More
Providing and fixing trap of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors :

-

-

-

... More
100mm inlet and 100 mm outlet

-

-

-

... More
Sand Cast iron SandS as per IS: 1729.

3

1830

610

... More
Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks of class designation 75 and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design.

-

-

-

... More
With well burnt bricks

1

20609

20609

... More
Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 sand ) R.C.C. top slab with Cement Concrete 1:2:4 mix (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 sand : 8 graded stone aggregate 40mm nominal size) inside plastering 12mm thick with cement mortar 1:3 (1 cement : 3 sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) finished with a floating coat of neat cement complete as per standard design :

-

-

-

... More
Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) :

5

39985

7997

... More
Providing and fixing water closet squatting pan (Indian type W.C. pan) with 100mm sand cast Iron P or S trap, uPVC P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete including cutting and making good the walls and floors wherever required :

-

-

-

... More
White Vitreous china Orissa pattern W.C. pan of size 580x440mm with integral type foot rests.

3

8985

2995

... More
Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350mm and 340x410x265mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :

-

-

-

... More
Range of two urinal basins with 5 litre white P.V.C. automatic flushing cistern.

1

4458

4458

... More
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps,32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require :

-

-

-

... More
White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps.

4

9840

2460

... More
Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.

-

-

-

... More
110 mm diameter (minimum wall thickness 2.2mm)

15

-

-

... More
Providing and fixing on wall face Unplasticised - PVC moulded fittings/ accessories for Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.

-

-

-

... More
Coupler

-

-

-

... More
110 mm (minimum wall thickness 2.2mm)

4

616

154

... More
Bend 87.5°

-

-

-

... More
110 mm bend (minimum wall thickness 2.2mm)

9

1548

172

... More
Shoe (Plain)

-

-

-

... More
110 mm Shoe (minimum wall thickness 2.2mm)

9

2700

300



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.