Military Engineer Services Tender
View complete overview of Lakshadweep MES Tender
Military Engineer Services - MES Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date3 Sep 2024
Closing Date30 Nov 2024
Tender Amount₹ 3,92,00,000
Costs
EMD
₹ 4,67,000Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_671058_1Tender No
891067Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Total amount of Sch 'A' part-III (Internal Electrification)
1
-
123822.83
Total amount of Sch 'A' part-IV (External water supply)
1
-
1459498.4
Total amount of Sch 'A' part-V (External Electric Supply)
1
-
256021.1
Total amount of Sch 'A' part-VI (Road/ Path/Hardstanding)
1
-
146307.07
SCH. 'A' PART -VII (Miscellaneous B/R & E/M Items ) Note :- This schedule is not pre priced by MES and the pre priced rate indicated as "Rs. 0.00" under Col.5 signifies this fact only.
-
-
-
EXTERNAL WATER SUPPLY
-
-
-
Supply, install, commissioning and testing of centrifugal monoblock pump set suitable for 415 V, 3 phase system having capacity 5 HP complete all as specified and directed.
2
-
-
Supply, install, commissioning and testing of Star delta Starter fully automatic suitable for 5 HP 415V AC complete all as specified and directed.
2
-
-
Supply, install, commissioning and testing of open well submersible pumping set 1 HP mounting base, suction and suitable size copper conductor cable from motor starter to terminal complete all as specified and directed.
8
-
-
Supply, install, commissioning and testing of phase Starter controller suitable 1 HP 220 V AC complete all as specified and directed.
8
-
-
Rotational moulded polythellene water storage tank (Cylindrical vertical with closed top) hoisted and fixed in position of capacity 5000 litr all as specifed (02 Nos (1W +1S) for storing RO permeate of stage 1)
4
-
-
EXTERNAL ELECTRIC SUPPLY
-
-
-
Cutting the existing hardstanding not less than 25cm in deep and 15cm in width for laying of CPVC pipe and making good the disturbed PCC surface complete to match with the existing
30
-
-
Supply, installation, testing and commissioning of 30 KVA DG set complete 415V, 50Hz, AC with accoustic enclosure as per CPCB - IV+ norms directly coupled to alternator brushless type, electronic AVR and Governor, voltage regulation ±1% complete with Std control panel having all type of meters, fuel tank, fuel line system, existing foundation, etc of capacity upto 30 KVA suitable for AMF operation and RCC (Reinforced Cement Concrete) flooring/ foundation should be firm and level all as per the specifications complete all as specified and as directed by Engr-in-Charge including following :-
1
-
-
Item No.17 continued..
Diesel Engine : Diesel engine having minimum output 37 HP with prime rated power as per BS 5514/ ISO:8528/ ISO 3046, speed 1500 RPM, two cylinders, 4 stroke radiator cooled engine well designed air handling system with dry type, heavy duty, replaceable paper element air cleaner with restriction indicator air to air aftercooling and optimised turbocharger for increased altitude capabilities, electric starting system with 12 volt DC electric starting motor, electronic governor, full automatic electronic fuel injection system with electronic governing, standard integral set mounted radiator system, full flow spin on lube oil filter, plate type lube oil cooler, battery charging alternator, hospital grade silencer suitably optimised to meet stringent noise emission standards laid down by MoEF/CPCB
-
-
-
Item No.17 continued..
Alternator : PMG Alternator of rating 30 KVA/24 KWe, 415 volt AC 3 phase 4 wire system on 50 Hz frequency and speed 1500 RPM at power factor 0.8 (Lag) having class "H" insulation for both rotor and stator with IP23 screen protected, drip proof and conforms to BS 5514/ ISO 3046/ ISO 8528 and IEC 34 standards and brushless, self excited, self regulated excitation and suitable for a permissible overload of 10% for one hour in 12 hrs test run, ±1% voltage regulation and all as per the recommendations of the manufacturer and alll as specified and as directed by Engr-in-Charge.
-
-
-
Item No.17 continued.. DG Engine control panel : Supply, install, test and commissioning of electronic DG control panel to be mounted inside the acoustic enclosure of DG sets equipped with standard safety features like LLOP, HWT and emergency stop button including with following features : (a) 320x240 pixels graphic LED backlight LCD.
(b) Multiple language support.
(c) Amp Sentry TM protection - for true alternator overcurrent protection.
(d) Digital power Transfer Control (AMF) provides load transfer operation in open transition, closed transition, or soft (ramping) transfer modes.
(e) Extended paralleling (Peak Shave/Base load) regulates the genset real and reactive power output while paralleled to the utility. Power can be regulated at either the genset or utility bus monitoring point.
-
-
-
Item No.17 continued..
(f) Digital frequency synchronization and voltage matching.
(g) Isochronous Load Share.
(h) Droop KW and KVAR control.
(i) Real time clock for fault and event time stamping.
(j) Exerciser clock and time of day start/stop initiate a test with or without load or a Base load or Peak Shave session.
(k) Digital Voltage regulation three phase full wave FET type regulator capable with either shunt or PMG system.
(l) Genset monitoring and protection .
(m) Utility/AC Bus metering and protection.
(n) 12 V DC Battery interconnecting to customer equipment.
-
-
-
Item No.17 continued..
ACCOUSTIC ENCLOSURE : Specifically designed to meet stringent MoEF/CPCB norms of 75 dBA@1mtr at 75% load under free field condition. The accoustic enclosure is made of CRCS sheet in munsel green shade and a structural/sheet metal base frame painted in black. The hot chamber of the canopy shall be properly insulated by mineral wool and aluminium foil to prevent excess heat radiation.
-
-
-
Item No.17 continued..
BASE FRAME : The Diesel engine and alternator shall be perfectly aligned and assembled dynamically balanced on a sturdy, fabricated, welded construction, channel iron base frame. Base frame shall have lifting provisions and predrilled holes suitable for grouted foundation. Flooring/ foundation should be RCC (Reinforced Cement Concrete) and firm & level. AMF Panel:- Fabricated sheet cubicle type powder coated with front hinged doors, dust and vermin proof totally enclosed for indoor type including MFM, LED indication lamps, selector switches, controller, auto/manual switch, contactors of suitable rating as per OEM, internal wiring with suitable size, relays, CTs of suitable rating, aluminium bus bar suitable for 30 KVA DG set complete all as recommended by OEM.
-
-
-
Design, assembling, supply, install, testing and commissioning of sea water Reverse Osmosis (RO) plant complete with all components suitable for production capacity not less than 32 KLPD / 2000 LPH 02 Nos (01 working = 01 Stand by) from the intake suction water sump having maximum TDS, high salinity & Conductivity including all other connected contents all as per Sample test conducted by the contractor after acceptance OR Test result enclosed as Appx 'B' in the tender documents which ever is in worst condition. The RO plant product shall be suitable for drinking water and with in the DESIRABLE LIMIT described in the IS 10500 - 2012 and Amendment issued time to time and Rejected water also be suitable for condition of local pollution control board limit. The RO plant shall be complete with all major and minor parts required at site to get a product suitable for drinking water at desired quantity ie 32 KLPD and following basic components of suitable capacity and type all as specified in Appx 'A'. Item rate quoted shall be inclusive for entire plant from the point of RAW WATER FEED Tank for Alum Dozing to product outlet up to existing MES UG Sump & discharge outlet of rejected water up to brine collection tank and further disposal to sea / ground as per recommendation of Pollution control board.
2
-
-
Item No.24 continued..
(i) Pre- treatment to RO plant (a) Sea water Intake pumps
(b) Chemical Coagulation system
© Multigrade filters feed pumps
(d) Multigrade sand filters
(ii) Sea water RO plant
(a) Sea water RO plant feed pumps
(b) Acid dosing system & Dozing tank
(c) Anti scalant dosing system & Dozing tank
(d) Cartridge filters
(e) High pressure pumps
(f) RO module
(g) RO cleaning system
(h) Pressure filter
-
-
-
Item No.24 continued..
(iii) Brackish water RO plant
(a) Feed pump
(b) Acid dosing system & Dozing tank
(c) Anti scalant dosing system & Dozing tank
(d) Anti oxidant dosing system & Dozing tank
(e) Cartridge filters
(f) High pressure pumps
(g) RO module
(h) Micro filter
(j) UV system
(k) RO cleaning system
-
-
-
Item No.24 continued..
NOTE:
(a) Before quoting the bid, Contractor or his authorized Engineer / consultant must visit the proposed site to study the site condition.
(b) The Plant shall be installed in near building and same shall be designed in accordance with the available space . The tenderer are advised to visit the site before quoting for the bid.
(c) The sea water parameter given hereinafter. These test have been conducted by the department through NABL accredited laboratory and are guiding factor only. The contractor shall take desired number of samples in present of Engr-in-Charge after award of contract and these samples shall be tested in NABL accredited laboratory and the worst condition as approved by GE shall be used for design purpose. The contractor shall take full guaranty of design offered by him to produce the desired quality of output.
-
-
-
Item No.24 continued..
(d) All the works pertaining to successful installation & commisioning of 1,00,000 LPD sea water RO desalination plantare inclusive of quoted rates other than separately specified for civil structure of water storage sumps, external water supply, external electric supply and Road/Path and external site clearance which are specified separately in the tender documents.
(e) The rates quoted shall also include the preparation of environment impact assessment report and obtaining the mandatory clearances in accordance with Para 4 (ii) (h) of CRZ notification issued by MoEF vide S.O.19(E) dated 06 Jan 2011 and any other notification issued by Central/State Govt from the statutory body. The rate quoted shall also include for incorporating brine disposal system as per the approval of State/Central Govt statutory body.
-
-
-
Item No.24 continued..
(f) All mechanical, Electrical works shall be carried out as per relevant BIS/IS/Equivalent standard norms only and also in accordance with the latest edition of the Indian Electricity Act/rules formed thereunder and as amended form time to time.
(g) Any other work (Mechanical & Electrical) connected to installation, testing & commissioning of RO plant 32 KLD all as condition mentioned above and which is not mentioned or included in this schedule but necessary shall be carried out by the contractor under the unit rate quoted.
(h)Entire installation shall be tested by the rep of Accepting ofiicer/IEM after completion of work.
(i) Completion of RO plant only be issued after satisfactoryTest result of product water from authorised agency submitted and plant commissioned by IEM
(j) After successful commissioning contractor shall submit minimum three sets of operation and maintenance manuals alongwith all the drawings.
-
-
-
Item No.24 continued..
NOTE: The rate quoted is deemed to include for the followings:
(i)Testing of product water samples from authorized agency once in a month during Defect liability period and submit test result.
(ii) Maintenance including replacement spares for successful running of RO plant for one year defect liability period deemed to be included in the quoted rates.
(iii) Provision of latest laboratory equipments and technologies on the site to check various parameter of drinking water as per IS 10500:2012.This laboratory shall be kept functional for 6 years after successful commissioning of RO plant.
(iv) Training of MES personal on operation and maintenance of entire plant
v) Submersible pump & Pipe line up to raw water feed tank for alum dozing shall be measured and paid separately.
-
-
-
Item No.24 continued..
vi) Electrical works including provision of power sockets and cabeling required for Dozing system, pumps etc (vii) RCC foundation for mounting of RO plant, filters, pump set etc
(viii) RCC valve pit of suitable size, Sludge tank etc.
(ix) Rate quoted shall deemed to be included for 3 (three) year warranty for all Reverse osmosis membranes irrespective of any variation in the characteristic of in take raw water.
-
-
-
Earthing complete with galvanized iron earth plate electrode 60cmx60cmx6mm thick buried directly in ground (earth pit not less than 2.25 mtr deep below normal ground level) with top edge of plate not less than 1.5 mtr below ground level connecting to the Galvanised iron earth lead 32x6 mm size, by means nut, bolt, check nuts and washer of galvanized iron and 32x6 mm as earth lead protected by provision of GI light grade pipe 40mm bore incl provn of concrete pit in PCC (1:2:4) type B-1 using 20mm graded stone aggregate with 40mm thick cover of RCC (1:2:4) reinforced (weight not less than 4Kg/Sqm) and frame of angle iron 25x25x6mm with lugs 2 Nos and with 6mm dia MS bar handle made to shape, GI light grade 20mm bore pipe for watering perforated at bottom 1.75 mtr long placed on top edge of earth plate, common salt and charcoal filling, test point with fixing arrangement CI funnel wire mesh and earth work in hard/dense soil, returning filling in and removal of surplus soil to a distance not exc 50 mtr all as per electrical plate No.3 of SSR Part I and connecting to earth test point all as specified incl testing on completion.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%