National Highways And Infrastructure Development Corporation Limited Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 2,00,000Document Cost
₹ 50,000Tender Fee
Refer Documents
Summary
Ladakh/tunnels - 2020/dpr-01/02/03
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHIDC_548777_1Bid Award Id
ViewTender No
Ladakh/Tunnels - 2020/DPR-01/02/03Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Team Leader Cum Senior Tunnel Engineer (1 no)
-
-
-
Tunnel Design Expert (1 no)
-
-
-
Senior Ventilation & Fire Safety Expert (1 no)
-
-
-
Senior Geotechnical Engineer (1 no)
-
-
-
Directional Coring Expert (1 no)
-
-
-
B. OTHER PROFESSIONALS
1
-
-
Senior E& M Engineer
-
-
-
Senior Geologist
-
-
-
Senior Surveyor Engineer (2 Nos.)
-
-
-
Environmental Engineer
-
-
-
Material Engineer
-
-
-
Highway cum Pavement Engineer
-
-
-
Quantity Surveyor/Documentation Officer
-
-
-
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment, Minimum 6 to be deployed)
-
-
-
TBN
1
-
-
TBN
1
-
-
TBN
1
-
-
TBN
1
-
-
TBN
1
-
-
TBN
1
-
-
TBN
1
-
-
TBN
1
-
-
TBN
1
-
-
Support Staff (Fixed Rates)
1
-
-
Office Manager (1 Nos.)
-
-
-
Typist (2 Nos.)
-
-
-
Office Boy (2 Nos.)
-
-
-
Night Watchman (2 Nos.)
-
-
-
Transportation (Fixed costs)
-
-
-
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (3 Vehicle for 8 month each)
24
-
-
Duty Travel to Site (Fixed Costs)
-
-
-
Trips
1
-
-
Office Rent (Fixed Costs)
-
-
-
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
8
-
-
Office Supplies, Utilities and Communication (Fixed Costs)
8
-
-
Office Supplies
-
-
-
Drafting Supplies
-
-
-
Computer Running Costs
-
-
-
Domestic and International Communication
-
-
-
Office Furniture and Equipment (Fixed costs)
-
-
-
Office Furniture and Equipment
1
-
-
Reports and Document (For all three Tunnel DPRs)
-
-
-
Monthly Report
24
-
-
Inception Report & QAP
3
-
-
Environment and Social Impact Screening Report
4
-
-
Draft Feasibility Report
4
-
-
Final Feasibility Report
6
-
-
Strip Plan with L.A. Reports
6
-
-
Draft LA and Clearances I Report
4
-
-
Final LA and Clearances I Report
4
-
-
Draft Environmental Assessment report & RAP
4
-
-
Final Environmental Assessment report & RAP
6
-
-
Draft Detailed Design Report & Drawings etc.
4
-
-
Draft EMP
4
-
-
Draft Bidding Documents
4
-
-
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
6
-
-
Final EMP
6
-
-
Final Bidding Documents
6
-
-
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
9
-
-
LA & Clearances II Report
6
-
-
Survey and Investigation
-
-
-
A. Topographical Survey (Fixed Rate)
-
-
-
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
1
-
-
B. Investigation (Fixed cost)
-
-
-
All investigations/surveys including Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey / Studies.
1
-
-
Schedule B (Item rate costs)
-
-
-
Directional Coring, Sub-soil Investigation & Other Works
-
-
-
Sub-Soil Investigation for Shinkun La Tunnel, Boring
-
-
-
a) Boring in all type of soils (other than hard rock)
2000
-
-
b) Boring in hard rock
500
-
-
Directional coring in any length along the proposed directional coring trajectory (corehole size NQ). The rate includes transportation of all plant, manpower, drilling accessories, sampling equipment work site, erection on site for Horizontal Directional Coring (Soil drilling testing and rock coring), trial pit , hand auguring, reinstatement of borehole etc including grouting in zones of weakness
-
-
-
Inclined soil, artificial hard material or boulder drilling and directional coring in rock arterial hard material or boulder from the launch site at ground level to the commencement of the HDC trajectory.
1200
-
-
Not exceeding 100m in length from chainage 0.000 (i.e. commencement of HDC trajectory) in rock
1200
-
-
Exceeding 100m in length but not exceeding 200m length in rock
400
-
-
Exceeding 200m in length but not exceeding 300m length in rock
400
-
-
Exceeding 300m in length but not exceeding 400m length in rock
400
-
-
Exceeding 400m in length but not exceeding 500m length in rock
300
-
-
Exceeding 500m in length but not exceeding 600m length in rock
300
-
-
Exceeding 600m in length but not exceeding 700m length in rock
200
-
-
Exceeding 700m in length but not exceeding 800m length in rock
200
-
-
Exceeding 800m in length but not exceeding 900m length in rock
100
-
-
Exceeding 900m in length but not exceeding 1000m length in rock
1200
-
-
Cost of supply and fixing Boundary Pillars
-
-
-
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
20
-
-
Land Acquisition Team including support staff and logistics/transportation
-
-
-
A. Land acquisition Team including support staff
-
-
-
Ex-Land Revenue Inspector/Officer or equivalent
6
-
-
Ex-Kanoogo/ Girdwar orequivalent
6
-
-
Ex-Patwari or equivalent
6
-
-
Typist (2 Nos)
12
-
-
Peon
6
-
-
A. Logistics for Land acquisition Team
-
-
-
Computer including necessary peripherals (2 Nos)
12
-
-
Printers (2 Nos)
12
-
-
Vehicles (Bolero or equivalent) with
monthly running limit of 4000 km
6
-
-
Evaluation Notes How It Works ?