Military Engineer Services Tender

... More
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Military Engineer Services - MES Tender

Works
Civil And Construction
Eprocure
Opening Date17 Mar 2025
Closing Date7 Apr 2025
Tender Amount₹ 25,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M&L for obliterating old writing of any description, n exc 0.1 sqm, with paint to match existing work, complete, all as specified and directed by Engineer–in–Charge.

20

-

-

... More
M&L for writing letters or figures (Block. Roman, Italic or Indian) n exc. 30 cm high complete, all as specified and directed by the Engineer–in–Charge.

8

-

-

... More
Material and labour for preparation of old decorated wooden surfaces of any description, not otherwise described, over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by the Engineer–in–Charge.

400

-

-

... More
Material and labour for preparation of old decorated wooden surfaces of any description, not otherwise described, over 10 cm width or girth and applying two coat of synthetic enamel paint complete all as specified and as directed by the Engineer–in–Charge.

800

-

-

... More
M&L for preparation of old wooden surfaces of any description width or girth including cleaning and complete removal of existing treatment (any number of layers upto original texture/grain of wood) by paint remover, paint blower etc applying two coats of french polishing with and including a coat of wooden filler complete all as specified and directed.

150

-

-

... More
Taking down cement or cement lime plaster of any description on brick or stone walls etc including racking out joints, hacking for key scrubbing down with water etc complete, all as specified and as directed.

1200

-

-

... More
Material and labour for rendering 15 mm thick on any faces of brick work or concrete wall surfaces in cement mortar 1:6 and finishing the surface even and smooth without using extra cement complete all as specified and as directed by the Engineer–in–Charge.

500

-

-

... More
Material and labour for preparation of new plastered surface on walls and applying two coats of oil bound distemper over and applying 1–2mm thick wall care putty white cement based in two or more coats to achive smooth surface complete all as specified and as directed.

500

-

-

... More
Material and labour for rendering 15 mm thick on brick work or concrete wall surfaces in cement mortar 1:4 including mixing water proofing compound as per manufacturer's instruction and finished fair and even without using extra cement complete all as specified and as directed by the Engineer–in–Charge. (Note – WPC shall be measured and paid separately).

700

-

-

... More
Supply only water proofing compound complete all as specified and directed by the Engineer–in–Charge.

92.8

-

-

... More
Material and labour for preparation of new plastered /concrete surface of wall applying of two coats of cement base paint over a coat of primer complete, all as specified and as directed.

700

-

-

... More
Material and labour preparation of old decorated brick /concrete, plastered /unplastered surfaces of walls by brooming down or steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and repair of patches, nails mark by white putty and applying one coat of cement base paint on the wall, pillars, cornices etc including necessary scaffolding complete all as specified and as directed by the Engineer–in–Charge.

1300

-

-

... More
Material and labour preparation of old decorated brick /concrete, plastered /unplastered surfaces of walls by brooming down or steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and repair of patches, nails mark by white putty and applying two coat of cement base paint over a coat of alkali resistant primer on the wall, pillars, cornices etc including necessary scaffolding complete all as specified and as directed by the Engineer–in–Charge.

700

-

-

... More
Material and labour for preparation of old decorated brick /concrete, plastered /unplastered surfaces of wall by brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of white lime wash on prepared surfaces of wall etc. complete all as specified and as directed by the Engineer–in–Charge.

500

-

-

... More
Material and labour for preparation of old decorated brick /concrete, plastered /unplastered surfaces of wall by brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying two coat of white lime wash on prepared surfaces of wall etc. complete all as specified and as directed by the Engineer–in–Charge.

500

-

-

... More
Material and labour for preparation of old decorated brick /concrete, plastered /unplastered surfaces of ceiling by brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of white lime wash on prepared surfaces of ceiling etc. complete all as specified and as directed by the Engineer–in–Charge.

260

-

-

... More
Material and labour for preparation of old decorated brick /concrete, plastered /unplastered surfaces of walls by brooming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of oil bound distemper with painting roller over prepared surfaces of walls pillars, cornices etc. complete all as specified and as directed by the Engineer–in–Charge.

2960

-

-

... More
Material and labour for complete removal of existing treatment (any number of layers) using appropriate technique as approved by EIC for complete removal of all layers of old treatment and reaching upto old plastered surface of walls, pillars, cornices, etc., and applying two coats of oil bound distemper with painting roller over a coat of wall care putty white cement based 1 to 2 mm thick in two or more coats complete all as specified and as directed by the Engineer–in–Charge.

2550

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.