Military Engineer Services Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date1 Nov 2024
Closing Soon30 Nov 2024
Tender Amount₹ 20,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
S & F in replacement of Fuel pump as per site

2

-

-

... More
S & F in replacement of Nozzle as per site

2

-

-

... More
S & F in replacement of Photocell as per site

2

-

-

... More
S & F in replacement of TPL pipe for diesel line as per site

4

-

-

... More
S & F in replacement of Solenoid valve as per site

2

-

-

... More
S & F in replacement of Contactor as per site

2

-

-

... More
S & F in replacement of Temperature controller TC513 (selec)

2

-

-

... More
S & F in replacement of Neon indication lamp as per site

3

-

-

... More
S & F in replacement of Start button Rotary Type as per site

1

-

-

... More
S & F in replacement of Sequence controller as per site

2

-

-

... More
S & F in replacement of Star Coupling as per site

2

-

-

... More
S & F in replacement of Ignition Transformer as per site

2

-

-

... More
S & F in replacement of Fuel filter assembly as per site

2

-

-

... More
S & F in replacement of RTD with cable

1

-

-

... More
S & F in replacement of Pressure Gauge 0-150 PSI

2

-

-

... More
S & F in replacement of Gun metal/ Brass Ball Valve 15mm dia

15

-

-

... More
S & F in replacement of Gun metal/ Brass Ball Valve 25mm

2

-

-

... More
S & F in replacement of Gun metal/ Brass Ball Valve 50mm as per site requirement

2

-

-

... More
S & F in replacement of Gun Metal ball valve 80mm dia, flange type, heavy duty suitable for high pressure pipeline complete all as specified and as directed by Engineer-in-Charge.

2

-

-

... More
S& F in repalacement of Gun metal/ Brass body Ball valve of size 20/15mm including Y strainer complete all as specified and as directed by Engineer-in-Charge.

10

-

-

... More
Disconnecting electrically thermic fluid boiler of capacity 1,00,000 Kcal/hr complete, de-scaling/ decarbonising the coil as well as thermic fluid circulation MS pipeline complete after draining out as required and cleaning with kerosene oil/ cleaning agent in all respect and reassembling and testing of the same complete including servicing, cleaning of burners of any make , including hose pipe as per site requirement with hose clamps cutting welding of boiler sheet and welding the same with existing / new sheet as required complete all as specified and directed by Engineer-in-Charge. Note :- The cost of de-scaling,burner servicing,hose pipe with clamps,cutting of boiler welding and fabrication work deemed to be included in quoted rates. Spares incorporated shall be measured and paid for separately under Srl Item No. 2.01 to 2.14

2

-

-

... More
S & F in replacement of Fuel pump as per site

1

-

-

... More
S & F in replacement of Ignition Transformer as per site

1

-

-

... More
S & F in replacement of Sequence controller as per site

1

-

-

... More
S & F in replacement of Ignition electrode as per site

1

-

-

... More
S & F in replacement of Fuel filter element as per site

2

-

-

... More
S & F in replacement of Nozzle as per site

1

-

-

... More
S & F in replacement of Photocell as per site

1

-

-

... More
S & F in replacement of TPL pipe for diesel line as per site

2

-

-

... More
S & F in replacement of Solenoid valve as per site

1

-

-

... More
S & F in replacement of Contactor as per site requirement

1

-

-

... More
S & F in replacement of Temperature controller as per site

1

-

-

... More
S & F in replacement of Neon indication lamp as per site

2

-

-

... More
S & F in replacement of Start button Rotary Type as per site

1

-

-

... More
S & F in replacement of Star Coupling as per site requirement

2

-

-

... More
S & F in repair of burner assemby long gun for thermic fluid heater of cap 100000 K Cal/ Hr complete incl electrical connections from control panel to burner assy & welding/ fabrication of boiler top plate according to new burner assembly complete all as specified and as directed by Engineer-in-Charge. Note :- The cost of fabrication and welding work if required is deemed to be included in the quoted rates. No extra payment will be given for the same work.

1

-

-

... More
Disconnecting electrically Space heater of capacity 60,000 Kcal/hr complete, de-scaling/decarbonising the burner and cleaning with kerosen in all respect and reassembling and testing of the same complete all as specified and directed by Engineer-in-Charge. Note :- The cost of de-scaling,burner servicing, diesel tank cleaning,hose pipe with clamps,cutting of boiler welding and fabrication work deemed to be included in quoted rates. Spares incorporated shall be measured and paid for separately under Srl Item No. 4.01 to 4.05

8

-

-

... More
S & F in replacement of Nozzle

2

-

-

... More
S & F in replacement of Fuel pump

2

-

-

... More
S & F in replacement of Fuel filter element

8

-

-

... More
S & F in replacement of Photo cell

1

-

-

... More
S & F in replacement of Sequence controller as per site

1

-

-

... More
Disconnecting electrically Space heater of capacity 200,000 Kcal/hr complete, de-scaling/decarbonising the burner and cleaning with kerosen in all respect and reassembling and testing of the same complete all as specified and directed by Engineer-in-Charge. Note :- The cost of de-scaling, burner servicing, diesel tank cleaning,hose pipe with clamps,cutting of boiler welding and fabrication work deemed to be included in quoted rates. Spares incorporated shall be measured and paid for separately under Srl Item No. 5.01 to 5.06

4

-

-

... More
S & F in replacement of Nozzle

1

-

-

... More
S & F in replacement of Fuel pump

1

-

-

... More
S & F in replacement of Fuel filter element

4

-

-

... More
S & F in replacement of Photo cell

1

-

-

... More
S & F in replacement of Sequence controller as per site

1

-

-

... More
Supply and filling of Thermic fluid/Glycol of approved make suitable for Central Heating System as per site in a barrel of 210 litres complete all as specified and as directed. Make : Cabol-32 of Bharat Petroleum , IOCL or equivalent

1050

-

-

... More
Supply and filling of Coolant, anti freezing of approved make complete all as specified and as directed. Make : Castrol / Mak / Servo

50

-

-

... More
Disconnecting electrically and taking down burnt out thermic fluid circulation motor motor and Repair/Rewinding of Electric induction motor of cap 3/5 HP 3phase 415 Volts make complete all as specified and directed by Engr-in-Charge

1

-

-

... More
Disconnecting electrically and taking down burnt out electric motor and Repair/Rewinding of Electric motor of cap upto 1 HP three phase, 415 Volts make complete all as specified and directed by Engr-in-Charge

1

-

-

... More
S&F in repairs of Fan coil unit of cap 4500/6000 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor including taking down old userviceable Fan coil unit complete all as specified and directed by engineer-in-charge.

6

-

-

... More
M&L for Insulation of Copper tubing of size 3/8 " or 5/8" with 19 mm thick nitrile rubber Class O insulation complete all as specified and as directed

50

-

-

... More
M & L for Insulation of MS/GI Pipe of dia 25 mm with PUF slab 30 mm thick with and including applying bituminuous compound and Aluminium cladding with 26 gauge Aluminium sheet after tightening the slabs with GI wire completeall as specified and as directed.

20

-

-

... More
M & L for Insulation of MS/GI Pipe of dia 40 mm with PUF slab 30 mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete

15

-

-

... More
M & L for Insulation of MS/GI Pipe of dia 50 mm with PUF slab 30 mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete

10

-

-

... More
Supply and lay in replacement of leaked/wornout/damaged MS Pipe of size 50 mm as with all fittings per site requirement as per satisfaction of Engineer-in-Charge

6

-

-

... More
Repair to wiring of Main Panel for Electric Supply to Boiler/Space Heater and replacement of UNSV wiring, MCB/MCCB and other items in panel as per site requirement to make it proper Functional of Plant as per satisfaction of Engineer-in-Charge. Note: MCB/MCCB/Contactor/Switch/Lamp will be measured and paid separetly under relevant item of Sch A item

2

-

-

... More
S & F in replacement of MCB SP C curve, 10 KA, 240V of Cap 05 to 32 Amps etc, complete all as specified and directed. Make: L&T/Havelles/Schenider/Indo Asian

2

-

-

... More
S & F in replacement of of MCB TP C curve, 10 KA, 415 V of cap 25 to 63 Amps etc, complete all as specified and directed. Make: L&T/Havelles/Schenider/Indo Asian

2

-

-

... More
S & F in replacement of Contactor MCX 12 etc, complete all as specified and directed. Make: L&T/Havelles/Schenider/Indo Asian

2

-

-

... More
S & F in replacement of Single phase preventor assembly complete as per satisfaction of Engineer-in Charge

2

-

-

... More
Supply and fix in replcement of UNSV Phase sequence Controller of Cap 20 HP as per site requirement as per satisfaction of Engineer-in-Charge

2

-

-

... More
Supply and fix in replcement of UNSV DOL Starter of Cap 3HP as per site requirement as per satisfaction of Engineer-in-Charge Make: L&T/Havelles/Schenider/Indo Asian

1

-

-

... More
Supplying and laying synthetic Rubber insulated mats 2 mm thick for voltage upto 3.3 kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m etc, complete all as specified and directed.

6

-

-

... More
M & L for Insulation of MS/GI tank of any cap of thermic fluid/Disesl tank vertical or horizontal installed at site with Kaiflex 25 mm thick with and including applying fixing solvent compound and GI cladding with 26 gauge GI sheet complete as per site requirement.

10

-

-

... More
Disconnecting electrically solar water heaters of capacity 200LPD to 500 LPD complete, de-scaling the ETC tubes as required and cleaning with cleaning agent in all respect and reassembling and testing of the same complete including replacing unserviceable spare parts and servicing , cleaning of tank of any cap, including connection of water pipe as per site requirement complete all as specified and directed by Engineer-in-Charge. Note :- The cost of de-scaling, water pipeline connections etc is deemed to be included in quoted rates. Spares incorporated shall be measured and paid separately under Srl Item No. 25.01 to 25.07

10

-

-

... More
S & F solar water heater ETC tube.

30

-

-

... More
S & F solar water heater element of heating cap 3KW, BSP flange 1.25" Hex Head 230 V 50 Hz AC suitable for Solar Water Heater of any Cap all as specified and as directed by Engineer-in-Charge.

12

-

-

... More
M&L for repairing of solar water heater tank leakage complete all as specified and as directed.

5

-

-

... More
M & L for puff tank of cap 500 Ltr complete incl making water connections from Puff tank to solar water heater complete all as specified and as directed by Engineer in Charge.

5

-

-

... More
S & F in replacement of copper wire of size 4 Sqmm x 3 core PVC Insulated Sheathed for electrical connections to solar water heater complete all as specified and as directed by Engineer-in-Charge.

120

-

-

... More
M & L for PPR pipe 15mm dia for water connections from water tank to solar water heater.

100

-

-

... More
M & L for Insulation of MS/GI/PPR Pipe of dia 15/20 mm with PUF slab 30 mm thick with and including applying bituminuous compound and Aluminium cladding with 26 gauge Aluminium sheet after tightening the slabs with GI wire completeall as specified and as directed

100

-

-

... More
Disconnecting, dismantling and taking out the existing Air conditioner Split type AC 1.5/2.0 TR of any description any capacity, any make and in any position, both indoor and outdoor unit single/three phase, strip opening , cleaning and servicing of the AC with using caustic soda/detergent solution, cleaning of suction air filter and coil of indoor unit and brazing the discharge and suction line, reassembling, fixing and testing of the AC complete all as specified and directed by Engineer-in-Charge. Note :-(i) The rates for above items are deemed to include for transportation to & fro of AC to workshop/site as approved by Engineer-in-charge for necessary servicing/repair of leakage and replacement of necessary unserviceable screws/nuts/bots/ washers/ packing etc with new one as required (ii) Charging of gas, if required, shall be measured and paid for separately under appropriate item of schedule 'A' . (iii) Spare parts required to make AC serviceable will be paid separetly under Sch a Item from 26.01 to 26.09

10

-

-

... More
S & F in replacement of compressor for 1.5 ton capacity AC unit inverter/non-inverter as per existing type

1

-

-

... More
S & F in replacement of compressor for 2 ton capacity AC unit inverter/non-inverter as per existing type

1

-

-

... More
S & F in replacement of PCB of inner unit of 1.5 / 2 Ton AC as per existing type

1

-

-

... More
S & F in replacement of PCB of outdoor unit of 1.5 / 2 Ton AC as per existing type

1

-

-

... More
S & F in replacement of Outdoor unit fan motor 1.5/2.0 Ton AC

1

-

-

... More
S & F in replacement of blower motor with fan and bushes for 1.5 / 2.0 Ton capacity AC indoor unit or FCU unit in heating plant as per site rquirement.

10

-

-

... More
S & F in replacement of starting capacitor 250 mfd + 10 mfd (combined unit).

2

-

-

... More
S & F in replacement of refilling gas ( R-22/32A / R410/as per site) in 1.5 / 2 Ton AC.

5

-

-

... More
S & F in replacement of HVAC Motor Contactor, 24VAC 40 Amp Coil, 2 Pole replacement relays compatible with PC240A, Air Conditioner of cap 1.5/2.0 ton complete all as specified and as directed by Engineer -in-Charge.

2

-

-

... More
M & Labour for cleaning of diesel tank complete after disconnection from the boiler/ space heater, cleaning with kerosene oil/cleaning agent in all respect and reinstallation of the same complete al as specified and as directed by Engineer-in-Charge.

4

-

-

... More
Supply and laying in replacement of M S Pipes 20mm bore heavy grade with all fittings laid in floors or fixed to walls and ceilings etc of sizes as shown complete all as specified and as directed by Engineer-in-Charge.

20

-

-

... More
M & L for air release valve spring loaded type suitable for release of trapped air in high pressure pipeline complete all as specified and as directed. Note :- The cost of welding of MS pipeline for fitting of air release valve and building work like drilling hole is deemed to be included in the quoted rates.

8

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.