Military Engineer Services Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 96,600Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Repair And Maintenance Servicing Of Central Heating System At Corps Offrs Mess
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_670913_1Bid Award Id
ViewTender No
138WE/L-66/2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
All as per item No.1.00 here in before but of size 32mm
240
-
-
All as per item No.1.00 here in before but of size 25mm
200
-
-
All as per item No.1.00 here in before but of size 20mm
180
-
-
Taking out the unservicable insulation from MS ERW pipe of size 80mm bore of pipe and providing for Insulation of MS Pipe with PUF slab 40 mm thick and applying bituminuous compound and GI cladding with 26 gauge GI sheet complete including complete earthwork for clearance around the pipe compete all as specifid and as directed.
90
-
-
All as per item No. 7.00 here in before but of size 50mm
200
-
-
All as per item No. 7.00 here in before but of size 40mm
220
-
-
All as per item No. 7.00 here in before but of size 32mm
240
-
-
All as per item No. 7.00 here in before but of size 25mm
200
-
-
All as per item No. 7.00 here in before but of size 20mm
180
-
-
M&L for replacement of Cast iron Butterfly valve of size 80mm dia Class PN 1.6 with SG Iron Dice flanged ends (integrally cast) horizontal type, conforming to IS-14846 (ISI marked) with stainless steel spindle and iron wheel non rising type including jointing material complete such as rubber or fibre board insertion packing rings with requisite numbers of nuts, bolts & washers etc including taking out existing unserviceable valve complete all as specified and directed.
4
-
-
Dismantling of burner assembly at Corps Offrs Mess CHS and removing of side cover of boiler capacity 1.5 lakh kilo cal/hr and complete servicing the boiler including exhaust outlet i.e chimmney by removing the complete carbon/oil deposits with suitable coil shine chemical including repair to coil assembly by welding if there is any leakage found or any other repair required at site and reassembling/ testing the same, complete all as specified and directed.
3
-
-
All as per srl item No 14.00 here in before but for 1 Lakh Kilo cal/hr incl all filters of radiator assembly at Signal Centre
3
-
-
Material and labour for rewinding of electric motor 3 phase 415 volts of capacity 3 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed by Engr-in-Charge.
2
-
-
Material and labour for rewinding of electric motor 3 phase 415 volts of capacity 2 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed by Engr-in-Charge.
2
-
-
S&F in sequence controller suitable for 0.6 to 1.5 lakh kilo cal/hr with burner rod assembly, complete all as specified and directed by Engr in Charge.
4
-
-
S&F in replacement of ignition rod suitable for 0.6 to 1.5 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed by Engr in Charge.
4
-
-
S&F in replacement of ignition Transformer electronic type suitable for 0.6 to 1.5 lakh kilo Cal/hr burner rod assembly, complete all as specified and directed by Engr in Charge.
6
-
-
M & L for complete servicing of deisel pumps suitable for boiler of capacity 0.6 to 1.5 Lakh K cal/Hr including replacement of bearings, seal etc as per site requirement complete all as directed by Engr-in-Charge.
2
-
-
S&F temp controller digital type DTC 503 with sensor suitable for 0.6 to 1.5 lakh kilo Cal/hr LAL 2.25 burner rod assembly, complete all as specified and directed by Engr in Charge.
2
-
-
S&F in replacement of photo cell as per existing suitable for 0.6 to 1.5 lakh kilo Cal/hr burner rod assembly, complete all as specified and directed by Engr in Charge.
4
-
-
S&F in replacement of burner nozzle suitable for 0.6 to 1.5 lakh K Cal/Hr complete all as specified and directed by Engr in Charge.
6
-
-
S&F in replacement of Electrode suitable for burner of capacity 0.6 to 1.5 lakh K Cal/Hr complete all as specified and directed by Engr in Charge.
6
-
-
S&F in replacement of pressure gauage 0 to 20 Kg/cm sq as per existing,complete all as specified and directed by Engineer-in-Charge.
2
-
-
S&F in replacement of thermostate assembly tail type as per existing suitable for 0 to 30 degree centrigrade temperature, complete all as specified and directed by Engr in Charge.
3
-
-
S&F in replacement of auto air pressure valve 3/8" as per existing, complete all as specified and directed by Engr in Charge.
6
-
-
S&F in replacement of High pressure fuel pipe 1.5 m as per existing,complete all as specified and directed by Engr in Charge.
8
-
-
M & L for replacement of burner complete assembly single phase 220 volts, Make Bentone Type ST-120, Model-ST-120K, or Equavelent Eco flame Capacity 02-5.6KG/hr, suitable for 1.5 Lac Kcal/hr boiler complete all as specified and directed by Engr-in-Charge.
2
-
-
M & L for replacement of burner complete assembly single phase 220 volts, Make Bentone Type ST-120, Model-ST-120K, or Equivalent Eco flame Capacity 02-5.6KG/hr, suitable for 1 Lac Kcal/hr boiler complete all as specified and directed by Engr-in-Charge.
2
-
-
M &L for disconnecting the AHU any capacity complete shifting to out side of the building and replacing unserviceable parts cleaning inside and outside and testing complete all as specified and as directed.
2
-
-
S&F in replacement of V - Belt, B-108 suitable for AHU motor.
4
-
-
S&F in replacement of inlet/outlet forged brass ball valve 20 mm with Y Stainer for FCU, hot water for -25 to 90 degree temperature as per existing, including supply and fixing GI nipple of size 3/4 inch including welding work, cutting the existing rusty unserviceable MS/GI nipple complete including taking out existing unserviceable valve complete all as specified and directed.
130
-
-
S&F and replacement of Inlet/outlet forged brass ball valve 25 mm with Y Stainer for FCU, hot water for -25 to 90 degree temperature as per existing, including supply and fixing GI nipple of size 3/4 inch including welding work, cutting the existing rusty unserviceable MS/GI nipple complete including taking out existing unserviceable valve complete all as specified and directed.
130
-
-
S&F and replacement of Forged steel globe valve, bolted bonnet outside screw & yoke type rising stem for 20mm dia complete including taking out existing unserviceable valve complete all as specified and directed.
60
-
-
All as per item No 36.00 here in before but of size 25mm dia bore.
42
-
-
All as per item No.36.00 here in before but of size 32mm dia bore.
25
-
-
All as per item No.36.00 here in before but of size 40 mm
18
-
-
All as per item No.36.00 here in before but of size 50 mm
18
-
-
Brass flare nuts of size 20/15 mm bore and fix the brass valves/FCUs including taking out existing unserviceable valve complete all as specified and directed.
220
-
-
S&F in replacement of FCU connection flexible pipe 20/16 mm as per existing, complete all as specified and directed. Make- Jindal/Kitetac or equivalent in ISI marked make.
360
-
-
Material and labour for complete cleaning and checking the serviceability of fan coil unit of any capacity for having continuous sreviceability of FCU for any number of time as desired by Engr-in-Charge including replacement of minor spare part like Gasket, Teflon tape, flare nut, tightening of any loose glycol line connections, shifting FCU from one place to another place if required, heating up the freezed glycol line anywhere about the premices and cleaning with the chemical solution by pressure pump from inlet to outlet to have continuous flow of glycol fluid, repairing the insulation of pipe line of any size by providing shallow tape / GI wire as deemed fit, for fastening the insulation with pipe line, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with FCU / Heating system, cleaning the air filter including radiator of FCU to the entire satisfaction of Engineer-in- Charge all as directed at site.
120
-
-
S&F in replacement of fan coil unit duel shaft electric motor 1/12 HP, 30 watt 930 RPM, 3 speed as per existing, complete all as specified and directed. Make- Maratan/CEG or equivalent in ISI marked make.
32
-
-
Supply and fixing radiator unit of FCU including connecting with the unit and making it leakproof of capacity 1.5 TR consisting of copper coils covered with aluminium finshing as per existing size of capacity 3000 K Cal / Hour including dismantling the existing unserviceable complete all as directed.
24
-
-
Supply and fixing radiator unit of FCU including connecting with the unit and making it leakproof of capacity 2.5 TR consisting of copper coils covered with aluminium finshing as per existing size of capacity 4500 K Cal / Hour including dismantling the existing unserviceable complete all as specified and directed.
20
-
-
Welding the leakage portion of MS pipe line including earhwork complete and materials as required for welding the pipe line of size 25 mm to 80 mm including testing on full pressure complete all as specified and directed.
96
-
-
M&L for cleaning of MS overhead POL storage tank of capacity 2000 Ltr including all type of T&P and chemical required for the same, including welding work to leakage surface including opening and refixing the existing insulating materials to the external surface of storage tank complete all as specified and as directed.
1
-
-
Material and labour for replacement of old unserviceable centrifugal monoblock pump 3 phase 415 volts of capacity 5 HP with Mechanical seal complete fittings with accessories , complete all as specified and directed.
2
-
-
Material and labour for replacement of old unserviceable centrifugal monoblock pump 3 phase 415 volts of capacity 3 HP with Mechanical seal complete fittings with accessories , complete all as specified and directed.
2
-
-
T&P alongwith Labour only for attending of complaint for day to day / daily complaints by employed skilled staff, checking the serviceability of fan coil unit of any capacity for having continuous sreviceability of FCU for any number of time as desired by Engr-in-Charge including replacement of minor spare part like Gasket, Teflon tape, flare nut, tightening of any loose glycol line connections, shifting FCU from one place to another place if required, heating up the freezed glycol line anywhere about the premices to have continuous flow of glycol fluid, repairing the insulation of pipe line of any size by providing shallow tape / GI wire as deemed fit, for fastening the insulation with pipe line, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with FCU / Heating system, cleaning the air filter including radiator of FCU to the entire satisfaction of Engineer-in- Charge all as directed at site. Note :-(i)Attending any complaints of different nature in a single day in Corps HQ COmplex Plant Room inside / outside will be considered as one job. ii)Any kind of replacement of major items shall be measured and paid for separately under respective item of schedule 'A' iii) . Any nature of complaint related with FCUs, radiators, bursting/cracking/leakage of MS pipe lines, replacement of valves etc will be completed round the clock by suitable trademen (welder with suitable T & P,(including portable heating materials)-01,Skilled mechanic of CHS-01, Plumber/Fitter with helper-each o1, Supervisor-01 as per descreation of Engineer-in- Charge.iv)Job slip will be maintained by the contractor Supervisor under supervision of concerned JE E/M CHS, suitable communication shall be maintained through JE incharge round the clock. v) Any delay in attending complaint will be directly reported to higher authorities and suitable penalities will be incured from the contractor (Rs 1000/-Per job)
150
-
-
Supply and fixing and replacement of Chilled/Hot Water Fan coil Unit (FCU) vertical type Floor Mounting 2.5 TR Capacity complete all as specified and directed by Engr-In-Charge. Make : Carrier/Zeco or equivalent ISI Marked.
16
-
-
Supply and fixing and replacement of Chilled/Hot Water Fan coil Unit (FCU) Wall Mounting 2.0 TR Capacity complete all as specified and directed by Engr-In-Charge. Make : Carrier/Zeco or equivalent ISI Marked.
15
-
-
Supply and fixing in replacement of wall mounting (ECO Panel) Convector heater 2.5KW/Hrs Two heat output setup with auto control and LED temperature display. Diemension-Width 1200mm, height, 450mm depth 90mm with complete fixing accessories complete all as specified and as directed.
15
-
-
S&F in replacement of Soft Plug Top 6 Amps with indicator as per existing complete all as specified and directed.
80
-
-
Supply, connection and testing of thermal heater wires on water supply pipe lines (GI/MS/PPR) for heating of water through minimum 25 Watt per meter in spiral/ straight line shape above outer diameter of pipe with aluminium tape insulation to preserve heat, fiber glass layer, second layer of aluminium tap to hold fiber glass by glass wool minimum 40mm thick with essential tapes complete all as specified and as directed.
240
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements