Southern Railway Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Southern Railway - SR Tender

Works
Civil And Construction
Bridge Construction
Ireps
Opening Date27 Mar 2025
Closing Date21 Apr 2025
Tender Amount₹ 1,92,22,043.65 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Protective coating of PSC slabs of bridges by means of epoxy painting with primer coat, 3 intermediate coat and top coat of IPN coating / CECRI integrated four cout system after surface preparation with contractor's material, paints, scaffolding, epoxy putty, high skilled labours, tools and plants, machineries, vehicles etc. and direced by the Engineer in charge of the work .

520

540

280800

... More
Protective coating of Substructure of bridges by means of epoxy coal tar paint like 4 SIKA Inertol Epoxitar or equivalent in two coats after surface preparation with contractor's material, paints, scaffolding, epoxy putty, high skilled labours, tools and plants, machineries, vehicles etc. And directed by the Engineer in charge of the work .

300

620

186000

... More
Providing and constructing Temporary Earthen Island / coffer dam of required height & width in canal bed for jacketting of pier/ abutment by driving wooden piles, wooden bellies and 5 dumping earth / sand bags etc. including provision of bailing and pumping, as directed by the Engineer in charge of the work. All labour , tools and plants , loading and unloading, lead and lifts, consumables, crossing the track where ever required etc. complete by the contractor. (Coffer dam size should be adequate leaving sufficient working space).

120

4600

552000

... More
Dismantling the temporary earthen island / coffer dam constructed at canal bed after 6 completion of work and clearing of waterway to the pre-existing condition including stacking of serviceable materials and disposal of unserviceable materials of coffer dam away from railway limit as directed by he Engineer in charge of the work. All labour , tools and plants , loading and unloading, lead and lifts, consumables, crossing the track where ever required etc . complete by the contractor.

120

3300

396000

... More
Trucking out Pre cast PSC slabs during day / night from the casting site to bridge location under line block duly loading in to diplorry, unloading and keeping the same over a pre 7 erected staging using Railways cribs, cut blocks etc.as directed by the Engineer in charge of the work. All labor, tools and plants lead and lifts, equipment , JCB, Hydra, consumables etc . by the contractor. Necessary Line block will be arranged by Railways during day/ night. Diplorry of required capacity, cribs, cut blocks etc. will be supplied by Railways free of cost. Proper lighting to be arranged by the agency depending on the line lock time for which no separate payment will be made. 4 PSC slabs / span )

4

430000

430000

... More
Trucking out pre cast RCC Retainer during day / night from the casting site to bridge location under line block duly loading in to diplorry, unloading and keeping the same over a pre 8 erected staging using Railways cribs, cut blocks etc.as directed by the Engineer in charge of the work. All labor, tools and plants ,lead and lifts, equipment , JCB, Hydra, consumables etc . by the contractor. ( Necessary Line block will be arranged by Railways during day/ night. Diplorry of required capacity, cribs, cut blocks etc. will be supplied by Railways free of cost. Proper lighting to be arranged by the agency depending on the line block time for which no separate payment will be made. 2 RCC Retainers / span )

4

353200

353200

... More
Trucking out the released girders under line block to the nearest yard / road approach 9 and keeping clear of infringement on the pre erected staging duly loading and unloading as directed by the Engineer in charge of the work. All labor , lead & lifts , equipments , tools and plants , consumables , crossing the track if required etc. complete by the contractor. (Necessary CC cribs , wooden sleepers / cut blocks , dip lorry will be supplied by Railways )

4

50000

200000

... More
Supply, Providing and fixing GRP Walk way Refugee Platform on the out side o Ballast retainer slab of existing Bridges including Supply and fixing of GRP platform structure connecting trolly refugees, with mounting brackets to bridge proper at 1500 mm c/c distance using SS 316 anchor fasteners duly drilling the bridge structure in the sides, with out affecting its design considerations, and through weep holes and additional holes by removing the ballast under traffic conditions during day or night as per the availability of taffic block and providing steel bolts of approved size as per drawing through the weep holes and additional holes provided in the bridge with 10 stainless steel plates on both sides of the weep holes and fixing the GRP Hand rails with the mounting brackets provided, Laying the GRP Walk way over the frame in the specific arrangements provided and fixing the same to the frame with suitable locking arrangements/brackets etc. complete as directed by the Engineer in charge o the work . The rate quoted is including all costs for lighting , scaffolding temporary platform arrangements for the safety of workers/ supervisors , cost o drilling , cost of SS bolts & nuts of approved diametre, length etc. and cleaning laying net covering the span in work , to act as a catch for accidently falling labor, boat arrangements in lake area for the rescue if any required, hire charges for power supply arrangements required for the site, leading o materials from factory to site of work and leading the same to work spot etc complete . The material supplied should confirm the specification mentioned in Drawing No. EC / PL / 16 / 10 / 1743 GA

60

30000

1800000

... More
Supply and using Cement at Worksite Ordinary Portland Cement 53 grade of approved brands/makes

20

10302

206042.4

... More
Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes.

8500

132

1127695



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.