Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Soil Survey And Soil Conservation Department Tender

Works
Eprocure
Opening Date22 Nov 2019
Closing Date30 Nov 2019
Tender Amount₹ 1,99,56,498 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Ridf-xxiv- Puthenkari Arunoottam Padasekharam Flood Control And Drainage Management Scheme In Chambakulam Block.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site - for foundation and superstructure

1361.16

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6

322.38

-

-

... More
13.2.1 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand)

656.7

-

-

... More
Retaining wall 2.00m height, 191 Rm.

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil- for side cutting

118.898

-

-

... More
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for first lift, - for side cutting

92.158

-

-

... More
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for first lift, In or under water - for foundation

114.6

-

-

... More
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site - for foundation and superstructure

347.382

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6

53.719

-

-

... More
13.2.1 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand)

105.051

-

-

... More
Retaing wall -2.50m height, 52 Rm

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - for side cutting

31.591

-

-

... More
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for first lift, - for side cutting

56.161

-

-

... More
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for first lift, In or under water - for foundation

37.7

-

-

... More
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

136.5

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6

14.95

-

-

... More
13.2.1 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand)

28.6

-

-

... More
Toe wall 1.20m height, 804Rm length.

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

654.456

-

-

... More
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

673.752

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6

196.98

-

-

... More
13.2.1 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand)

361.8

-

-

... More
Ramp, 3nos.

-

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

55.973

-

-

... More
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

88.356

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6

8.101

-

-

... More
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

5.124

-

-

... More
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

5.188

-

-

... More
13.2.1 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand)

10.05

-

-

... More
PVC pipe belowcross bund (6m length), 15 nos

-

-

-

... More
OD Providing and fixing PVC pipes includings jointing of pipes with one step pvc solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer in Charge. 150mm outer dia

90

-

-

... More
Box culvert -1.80m span, 1 No.

-

-

-

... More
60.1.2 RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.00m , height 2.0m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work clearing the site by dismantling the bund after completion of the work etc. complete.

6

-

-

... More
50.2.3.1 Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pump set. complete .

40

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kind of soil.Side cutting and Foundation

6.12

-

-

... More
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed. within a lead 50m. All kinds of soil for first lift, In or under water

20.534

-

-

... More
60.64.1 Cocunut Piule- Supplying and stacking well matured straight cocunut post for driving down through various strata below bed level including cost of conveyance labour charges etc. complete

72

-

-

... More
60.64.4 Cocunut pile- Driving down cocunut pile to lines and levels through various strata including all hire charges and labour for fixing , staging plat form and all other appliances for pile driving down after pointing the bottom end

67.2

-

-

... More
60.64.6 Cutting and removing excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m

4.801

-

-

... More
16.3.9 Supplying and stacking at site good earth

3.42

-

-

... More
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

8.011

-

-

... More
4.1.6 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

4.604

-

-

... More
60.7.4 DR packing for Aprons- Rough stone dry packing for apron with good quality blasted rubble including conveyance of materials and labour charges etc. complete as per direction of departmental officers at site

1.081

-

-

... More
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

61.741

-

-

... More
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, colums, pillars, piers, abutments, posts and struts etc up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1.5:3 ( 1 cement : 1.50 coarse sand : 3 graded stone aggregate 20 mm nominal size)

9.72

-

-

... More
4.2.3 Providing and laying in position cement concrete in retaining wall, return wall, walls (any thickness) including attached pilasters, buttresses, string or lacing courses, sunken floor, fillets, colums, pillars, piers, abutments, posts and struts etc up to floor five level of specified grade excluding the cost of centering and shuttering and finishing - l:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

2.7

-

-

... More
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

1227.67

-

-

... More
13.16.1 6mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)

56.76

-

-

... More
Raising the existing dividing bund 1062 Rm

-

-

-

... More
OD Banking excavated earth in layers not exceeding 20 cm in depth breaking clouds etc

4614.502

-

-

... More
Pipe culvert- 3nos.

-

-

-

... More
60.1.2 RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.00m , height 2.0m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work clearing the site by dismantling the bund after completion of the work etc. complete.

12

-

-

... More
50.2.3.1 Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pump set. complete .

72

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kind of soil.

58.456

-

-

... More
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site

42.941

-

-

... More
60.7.2 DR packing under foundation- Dry stone packing under foundation with good quality blasted rubble including conveyance of materials and labour charges etc. complete as per direction of departmental officers at site

27.867

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6

46.168

-

-

... More
4.1.6 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

12.479

-

-

... More
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) direction of departmental officers at site

1.827

-

-

... More
60.7.4 DR packing for Aprons- Rough stone dry packing for apron with good quality blasted rubble including conveyance of materials and labour charges etc. complete as per direction of departmental officers at site

3.234

-

-

... More
OD Providing and laying 750mm dia RCC pipes including collar jointed with stuff mixture of cement mortar in the propotion of 1;2 (1 cement: 2Fine sand ) etc. complete

9.9

-

-

... More
4.3.2 Centering and shuttering including strutting, propping etc. and removal of form work for:retaining wall, return walls, (any thickness) including attached pilasters, butresses, plinth and string courses fillets, kerbs and steps etc.

10.338

-

-

... More
13.2.1 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand)

43.56

-

-

... More
2.38 Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layers should not exeed 15cm) with intermediate layer of compacted earth (soil density of 98%) after every four layers of compacted depth of fly ash, sides& top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by engineer in charge, including compacting each layer by Rolling / ramming and watering, all complete as paer drawing and direction of Engineer -in- charge

18.834

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.