Military Engineer Services Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 16,100Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MES_633657_2Bid Award Id
ViewTender No
81112Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Labour only for mixing, spreading, levelling, watering and well ramming approved earth and sand in required proportion as directed for planting of grass in layers not exc 25cm thick including supply and mixing 1/2 kg/sqm of cow dung, 0.25 kg/sqm of bone meal and 15gms/sqm of insecticies complete all as specified and directed by Engineer in Charge.
720
-
-
Material and labour for excavation of pits of size 30x30x30cm in loose soil and filling the pit with mixture of approved earth and river sand in the proportion of 1:3 by volume, mixed with 2kg of cow dung powder, 100gms of bone meal and 10gms of insecticide (furadan) and removal of excavated soil to a distance n.exc 50m etc complete all as specified and directed by Engineer in Charge.
224
-
-
All as per srl item No 5 above, but for pit of size 60x60x60cm complete all as specified and directed by Engineer in Charge.
65
-
-
Supply and planting red palm sapling having 45cm height and shall have a minimum height of 65 cm etc complete all as specified and directed by Engineer in Charge.
20
-
-
Supply and planting coconut tree sapling having 45cm height and shall have a minimum height of 65 cm etc complete all as specified and directed by Engineer in Charge.
45
-
-
Supply and planting flower plants sapling having 10 cm minimum height etc complete all as specified and directed by Engineer in Charge.
70
-
-
Supply and planting phylanthu plants sapling having 15 to 30 cm height etc complete all as specified and directed by Engineer in Charge.
40
-
-
Supply and planting colour flower plants sapling having 15 to 30 cm height etc complete all as specified and directed by Engineer in Charge.
40
-
-
Supply and planting song of india flower plants sapling having 15 to 30 cm height etc complete all as specified and directed by Engineer in Charge.
40
-
-
Supply and planting dracena flower plants sapling having 15 to 30 cm height etc complete all as specified and directed by Engineer in Charge.
34
-
-
Supply and planting Mexican grass complete all as specified and directed by Engineer in Charge.
720
-
-
Removing excavated material (Soil) to a distance exc. 250 m but not exc 500 m and depositing where directed at a level n exc. 1.5 m above starting point complete all as specified and directed.
108
-
-
Note :- The rate quoted by the contractor shall be inclusive of regular maintenance of grass and plants as mentioned in particular specifications during the entire defect liability period, i.e 2 years from the date of completion of work.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements